Download presentation
Presentation is loading. Please wait.
Published byJocelyn Golden Modified over 9 years ago
1
Tshwane Line 1 Traffic Simulation Results October 2012
2
Development of SATURN Traffic Model 2012 AM & PM Peak Hour Intersection Vehicle Counts EMME Transportation Model (2010 AM Peak Hour ) Calibrated Vehicle AM & PM Peak Hour Models & Intersection Levels of Service 2012 Intersection Lane Geometry and Signal Plans 2014 – 2016 AM & PM Intersection Operations Details (LOS) BRT Lane Introduction & Revised Road & Intersection Geometry Revised Network & Intersections Operations Evaluation EMME Model BRT Passenger Forecasts
3
Traffic Model Study Area N N N1 CBD Menlyn N4 Wonderboom Mamelodi
4
Traffic Model CBD Definition N N
5
Traffic Model Intersection Details Nana Sita Paul Kruger 2012 AM Peak Hour Flows (Veh/hr) Nana Sita 2012 AM Peak Hour Signal Plan
6
Traffic Model Existing CBD Flows N N N N
7
Traffic Model: Introduction of BRT Lanes N N
8
N N
9
N N Nana Sita Paul Kruger
10
Traffic Model Flow Differences N N
11
N N Nana Sita Paul Kruger
12
Traffic Model Flow Differences
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.