Download presentation
Presentation is loading. Please wait.
Published byPosy French Modified over 9 years ago
1
FP 420 Connection Cryostat Design and Integration Keith Potter, Jaak Lippmaa, Guido Ryckwaert, Benoit Florin, Thierry Renaglia, Thierry Colombet, Shrikant Pattalwar, Domenico Dattola. Torino 11-12 July 06
2
FP 420 Cryostat Design and Integration. Torino 11-12/07/06 2 D. D. INFN To/CERN PH CMM FP 420 Cryostat Design and Integration Integration into the machine tunnel with existing equipment and reserved volumes –Cryo distribution line (QRL) –Tunnel Services, cable trays, cables and piping –Transport reservation –Alignment lines of sight Integration of services and detector on the new connection cryostat with warm beam pipes –Vacuum sector valves, pumps, vacuum gauges, diagnostic ports –Detector Interfaces –Detector cooling and services Assembly, transport and installation –First Installation must not take longer than the normal 3-4 month winter shutdown Assembly the complete connection cryostat in surface hall. Structural Beam to assembly together Terminal Module (ATM) and support cryogenics continuity lines, detectors positioning system, radiation shielding.
3
FP 420 Cryostat Design and Integration. Torino 11-12/07/06 3 D. D. INFN To/CERN PH CMM Typical tunnel section.
4
FP 420 Cryostat Design and Integration. Torino 11-12/07/06 4 D. D. INFN To/CERN PH CMM FP420 Connection Cryostat in tunnel.
5
FP 420 Cryostat Design and Integration. Torino 11-12/07/06 5 D. D. INFN To/CERN PH CMM Vacuum Instrumentation (VAA) on Reshuffling Module of Distribution Feed Boxes (DFB) Vacuum Instrumentation (VAA)
6
FP 420 Cryostat Design and Integration. Torino 11-12/07/06 6 D. D. INFN To/CERN PH CMM DFB Vacuum Equipment (VAA) Visit DFB Vacuum Assembly Facilities. (Keith Potter, Michele Arneodo, Detlef Swoboda, Benoit Florins, Guido Ryckewaert)
7
FP 420 Cryostat Design and Integration. Torino 11-12/07/06 7 D. D. INFN To/CERN PH CMM RF all metal gate valve
8
FP 420 Cryostat Design and Integration. Torino 11-12/07/06 8 D. D. INFN To/CERN PH CMM ATM Reshuffling Module. X Line Superfluid He (X) Line. Existing raw interfaces
9
FP 420 Cryostat Design and Integration. Torino 11-12/07/06 9 D. D. INFN To/CERN PH CMM X line continuity There is not continuity for the super-fluid He (X line) on the existing module. It can be added on existing raw interfaces in the reshuffling module. A straight line between ATM flanges has been considered. A: aligned to contiguous element B:Moved aside by 180 mm to allow easy accessibility to detectors
10
FP 420 Cryostat Design and Integration. Torino 11-12/07/06 10 D. D. INFN To/CERN PH CMM X Line Continuity new proposal. (I) Previously layouts not compatible with Beam vacuum equipment. Move X Line away by curved piping between ATM flanges
11
FP 420 Cryostat Design and Integration. Torino 11-12/07/06 11 D. D. INFN To/CERN PH CMM X Line Continuity new proposal. (II) Detail on next slide Distance between flanges of reshuffling modules: 9810 mm Reserve to vacuum equipment 700mm per side. Available space for detectors ~ 8410 mm Instrumentation must sectorise the warm and cold vacuum systems and provide roughing pumping/venting and UHV pumping of the warm vacuum system for both beams, independently. In addition it should provides tools to monitor the status and quality of each beam vacuum. Combination of valve, pump and pressure gauges, as is on DFB modules (VAA), would occupy about 700 mm
12
FP 420 Cryostat Design and Integration. Torino 11-12/07/06 12 D. D. INFN To/CERN PH CMM X Line Continuity new proposal. (III)
13
FP 420 Cryostat Design and Integration. Torino 11-12/07/06 13 D. D. INFN To/CERN PH CMM X Line Continuity new proposal. (IV)
14
FP 420 Cryostat Design and Integration. Torino 11-12/07/06 14 D. D. INFN To/CERN PH CMM Assembly Structure (I)
15
FP 420 Cryostat Design and Integration. Torino 11-12/07/06 15 D. D. INFN To/CERN PH CMM Assembly Structure (II) AA A A Top side view A-A view
16
FP 420 Cryostat Design and Integration. Torino 11-12/07/06 16 D. D. INFN To/CERN PH CMM Conclusion (next steps) Get detailed drawing of tunnel layout in all the 8 zone. Check QRL. Study on feasibility of 3 rd proposal of X line routing. Design Interconnection inside shuffling module. Adapt Vacuum equipment- (R Veness ?) Cryostat Assembly Beam – Transport Handling Frame ?
17
FP 420 Cryostat Design and Integration. Torino 11-12/07/06 17 D. D. INFN To/CERN PH CMM ATM various pic. and fig.
18
FP 420 Cryostat Design and Integration. Torino 11-12/07/06 18 D. D. INFN To/CERN PH CMM DFP Arc Termination Module (ATM) in LHC
19
FP 420 Cryostat Design and Integration. Torino 11-12/07/06 19 D. D. INFN To/CERN PH CMM ATM DFB interface I
20
FP 420 Cryostat Design and Integration. Torino 11-12/07/06 20 D. D. INFN To/CERN PH CMM ATM DFB interface II
21
FP 420 Cryostat Design and Integration. Torino 11-12/07/06 21 D. D. INFN To/CERN PH CMM ATM DFB interface III
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.