1 NABUUR GAMAULI CONSTRUCTION OF TWO ROOMS’ BUILDING

2 Partners Local Level: Krishna Primary School/Management committee/local community International level: Nabuur 2

3 Partner school of Nabuur 3

4 Development so far Student number increased from 145 to 209 Mr. Garry Miller has supported salary for two teacher now the number of teacher is 5 (government supported -2, Nabuur suppored- 2 & community supported-2) Sufficient teaching materials- provided by Stacy Helmus Parents visit school and work together Teachers are punctual work trying child centered education 4

5 Community combination Total house holds: 200 – Dalits: 104 – Thakuri: 39 – Chhetries: 57 Occupation – Farming: All families – Employ: 11 people in private companies 7 people in government offices 5

6 Recent needs and priority 1.Building with two rooms 2.Training for teachers (Child centered) and materials 3.Compound wall (125 Meter) 4.Drinking water 5.Toilet 6

7 Community participation Community can participate in following areas – Labor contribution (un skilled) – Wood – transportation 7

8 Support Required Following support is required with partner – Cash for Cement – Cash for Rods – Cash for skilled labor – Bricks/stone – Grill – Other things that need to import from outside 8

9 Map of building Map ( 23 Š 20 Feet/room) 9 Total length: 46 Feet Old building Further extension East elevation

10 Measurement Details Windows; – Length= 6 feet – Height= 5 feet Doors; – Breath=3feet – Height= 7feet Wall; Thick= 14 Inch Height=11 feet 10

11 Questions asked by Tatjana Floor plan, elevation, sections, dimensions, position of entrance, north orientation, photos of the building, Ans: Pls. go to building sketch, it is decided by local contractor and me. Marked place for the future extension Ans: Marked in map Roof is concrete slap Measures are in feet Foundation depth is 5 feet Materials are stone, sand, cement, wood, concrete, rods etc 11

12 Estimated Cost REQUESTED WITH DONOR UnitRate (Rs.)Total (Rs.)USD Cement Piller4095038000558.8 DPC3095028500419.1 Wall5095047500698.5 Slap2009501900002794.1 Plaster6095057000838.2 Rod (Piller, Beam and Slap)15100001500002205.9 Nails, banding wire (Kg)30100300044.1 Equipments2050010000147.1 Skilled labor200350700001029.4 Total: - 5940008735.3 12

13 Estimated cost SHARED BY COMMUNITY UnitRate (Rs.)Total (Rs.)USD Land cutting (Person)30200600088.2 Wood (Cubic feet)601500900001323.5 Transportation (Person)10020020000294.1 Un skilled labor (Person)10020020000294.1 Stone (Cubic Feet)4005020000294.1 Total:- 1560002294.1 13