Download presentation
Presentation is loading. Please wait.
Published byTrevor Stone Modified over 9 years ago
1
1 Free Template from www.brainybetty.com 1
2
2 2 MFR…. Uh… How do you get a man to stop biting his nails? Make him wear shoes. What do you instantly know about a well- dressed man? His wife is good at picking out clothes. How many men does it take to tile a bathroom? Two. If you slice them very thinly.
3
3 Free Template from www.brainybetty.com 3 Today’s Update Contains…. NAESB Coordinate Interchange Scheduling Subcommittee OASIS Subcommittee Business Practice Subcommittee Other NERC FERC ATC Workshop
4
4 Free Template from www.brainybetty.com 4 e-Tag 1.8.2 Electric Industry Registry Update WEQ-004 Coordinate Interchange Business Practice Standards Meetings
5
5 Free Template from www.brainybetty.com 5 Interoperability testing completed in 2014 Implementation/cut-over occurred midnight CST between March 30 th and 31 st 2015 1.8.1.1 Retirement Date: May 1, 2015 00:00 CST You have the month of April to replace any 1.8.1.1 e-Tags Materials are posted on the NAESB web site (but you have to login first) https://www.naesb.org//weq/weq_jess_etag_1.8.1.asp https://www.naesb.org//weq/weq_jess_etag_1.8.1.asp
6
6 ER13001 – NERC requested EIR include schema and GUI for registration and approval of pseudo- ties. Testing and retesting, not quite complete. Proposed implementation date is June 9, 2015. Also, look for NERC announcement concerning INT-004-3, R3.
7
7 Market Operator code-role white paper Determine if Business Practices are needed for registration of pseudo-ties
8
CISS Calendar
9
OASIS Subcommittee
12
OASIS Subcommittee Calendar
13
Spent the last five years working on Parallel Flow Visualization (PFV). The PFV recommendation was approved at the Feb 24, 2015 WEQ EC meeting. Was assigned last year the “MOD” effort of turning portions of MOD-001, -004, -008, -028, -029, and -030 into NAESB Business Practice Standards. Business Practices Subcommittee
14
14 Free Template from www.brainybetty.com 14 A WEQ EC Task Force took 200+ requirements/sub- requirements abandoned by the NERC MOD A drafting team and developed a recommendation of “1 must have” and “41 please consider” requirements In Oct 2014, the Business Practice Subcommittee began crafting ATC/AFC business practice standards Desired completion by subcommittee is the end of 2Q2015
15
Business Practices Subcommittee Calendar
16
Next WEQ EC meeting April 28, 2015 in Carmel, IN Expect significant conversation regarding the revised standards for redirects on a firm basis, both from unconditional parent reservations and conditional parent reservations. The proposed recommendation contains a requirement for each provider to post in their business practices how they “handle” redirects from conditional parents. Random NAESB Stuff
17
Removing the LSE and PSE Functions NERC convinced FERC to remove the Load-Serving Entities and Purchasing-Selling Entities from the reliability registration. SO, what happens with INT-004-3, R1 & R2 and with INT- 011-1 that is a direct result of the FERC directive (to the ERO)? NERC Adventures
18
Held at FERC 12:00 pm – 4:00 pm EST, Tuesday, April 21, 2015 Workshop on Available Transfer Capability Standards for Wholesale Electric Transmission Services (reference AD15-5-000) FERC staff will convene a workshop to discuss actions the Commission could take to ensure that transmission providers continue to calculate and post available transfer capability (ATC) in a manner that ensures nondiscriminatory access to wholesale electric transmission services. Panel of various industry folk – from the west Excel, Puget Sound, and consultant for Powerex. Issues – detailed requirements versus flexibility, coordination between providers, and transparency to customers and regulatory beings. FERC ATC Workshop
19
19
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.