Changes to IR6 dump protection elements B.Goddard, W.Weterings, C.Maglioni, R.Versaci, T.Antonakakis, R.Schmidt, J.Borburgh, J.Blanco, plus many other colleagues
2
Contents TCDQ upgrade – Absorber material and length – Movement bellows – Controls Additional TCLA Buttons in TCSG
3
TCDQ upgrade Issue with robustness of present TCDQ design – Dynamic stresses exceed limit for damage at block corners – Graphite jaws, 1.8g/cc – Replace with graded Carbon Composite (1.4g/cc and 1.65 g/cc)
4
Absorber composition Lower density and higher yield stress material – should be below damage limit for beyond ultimate beams – FLUKA and stress analyses ongoing to derive limits Total amount of material seen by beam increases from 10.8 kg/cm2 to 13.9 kg/cm2 – Should be better for asynch dump protection Beam
5
Absorber length 6m -> 9m
6
Location of extra module More difficult upstream, due to dump line interference, but would like to maintain location of TCSG and drift to Q4, so will extend upstream.
7
Layout Relocation of interlock BPMs by about 3m No impact on functionality TCDQ BPMSA TCSG
8
Schedule Install during LS1
9
Another benefit? Will have 9m of CC next to beam at location with largest H beta function – Could help reduce damage elsewhere in case of major failure – Being investigated by J.Blanco & R.Schmidt
10
Improve present bellows (±20 mm) Presently large mechanical stress to displace Distortion of RF fingers (away from beam!) Will make double bellows system -> TE/VSC?
11
Controls Don’t expect any change in movement precision with 9m long absorber (10.4m) Are investigating an upgrade of controls to use collimation stepping motor system and low- level (although some other issues have been solved with existing DC motors) – Needs mechanical changes, and there is concern about precision attainable in open-loop.
12
Additional TCLA? Space reserved in layout for TCLA, just before TCDQM
13
Reduction of heat load on Q4 with MQY Factor 2 improvement
14
FLUKA studies of asynch dump R.Versaci
15
Justification for TCLA “Not needed for beam cleaning” – Ralph Two remaining justifications – Reduce scale of quench if asynch dump FLUKA studies in progress – Help contain damage if “beyond design” failure Energy tracking, retrigger failure Decision still to take – when is deadline for Coll project? – Would be good to do all IR6 work together in LS1 (TCSG with buttons, new TCDQ plus motorisation, TCLA)
16
Buttons in TCSGs Requested by Ralph Can only support this – Will need to investigate ‘servo’ of TCDQ position with TCSG, beyond certain offset, if TCSGs are automatically adjusted
17
Conclusions Some non-negligible upgrades for IR6 dump protection – TCDQ upgrade for robustness (also adds more material close to beam) – TCDQ controls – to be decided formally – New improved TCDQ bellows – TCSG with buttons – Additional TCLA – to be decided after FLUKA studies