Area of Inundation Industrial Drive Area of Flooding =
2
Location of Current Drainage System 18 Inch Pipe Flow of water Existing culverts to be replaced Sea Side Causal Furniture Manufacture Boston Scientific Medical Supply Packaging Facility Two 42” pipes Two 3’ x 3’ stone culverts
3
Proposed Drainage System Upgrades (2) Two 4’H X 10’W X 82’L Box Culverts Flow of water Existing culverts to be replaced Sea Side Causal Furniture Manufacture Boston Scientific Medical Supply Packaging Facility (2) Two 3’H X 9’W X 68’L Box Culverts (2) Two 3’H X 9’W X 76’L Box Culverts