Rocky I Bridge Installation Park Butte Trail June 2005
2
The Plan The Park Butte Trail has over 8000 visitors of all ages from June through September. Project Objectives: 1. Provide a safe bridge over Rocky Creek during the peak summer season. 2. Bridge to be removed for the off-season to avoid heavy snow pack, uncertain stream flows, and flood events. 3. Bridge component weights to be within the capability of a type 3 helicopter (Hughes 500), approx. 1000 lbs. 4. Annual bridge flight time, assembly, disassembly and storage can be accomplished in two days or less.
3
Original Rocky 1 Bridge As – Built (1989)
4
Original Rocky I Bridge Destroyed October 2003
5
Former Channel Old Bridge Remnants
6
Rocky Creek Old ChannelNew Channel
7
WTA Executive Board Crossing Rocky Creek 2004
8
New Bridge Location 300’ West of Original Bridge Site
9
Do the parts fit together? Practice Assembly Fiberglass Structural Components
10
Rocky I Girders Placed by Helicopter
11
Rocky I Looking Northwest
12
Rocky I Completed “Don’t try to fool Mother Nature”
13
Rocky Creek Bridge Made possible with a grant from: The Spring Family Trust For Trails