1 © 2006 OSIsoft, Inc. – Company Confidential Energy Management The Infrastructure Approach Dr. J. Patrick Kennedy, CEO and President
2
2 © 2007 OSIsoft, Inc. The Problem – Utility Side
3
3 © 2007 OSIsoft, Inc. The Problem – User Side Cost of Energy Going up –Not only actual, but built in (e.g. Recycle Pulp) Reliability Decreasing Unused Flexibility New Tariffs
4
4 © 2007 OSIsoft, Inc. Responses on the Horizon… Dynamic changes occurring in the market –Deregulation –Cap and Trade Certificates –Market Based Pricing Demand Response Time of Day LMP
5
5 © 2006 OSIsoft, Inc. – Company Confidential Case Study - Kodak
6
6 © 2007 OSIsoft, Inc. The Largest of Eastman Kodak’s Worldwide Manufacturing Sites Located in Rochester, New York Referred to as a “City Within a City” 1300 Acres (5,200,000 sq m) 150 Buildings Nearly 30 Miles of Roads Kodak Park
7
7 © 2007 OSIsoft, Inc. Facts and Figures >20,000,000 Square Feet (2,000,000 sq m) 11,000 Employees Operates Its Own Fire Department Operates Its Own Railroad Operates Its Own Water and Waste Water Treatment Plants Operates Two Power Plants
8
8 © 2007 OSIsoft, Inc. Kodak Park
9
9 © 2007 OSIsoft, Inc. Kodak Park Utilities Kodak Park Utilities Power Plants –2,000,000 Pound/Hour Steam Load –125 MW Electric Load –80,000 Ton Refrigeration Capacity –30,000,000 Gallons/Day Process Water Load –35,000 SCFM Compressed Air Load
10
10 © 2007 OSIsoft, Inc. Utility Metering 600 Electric Distribution Meters 600 Additional Distribution Meters for: Steam, Chilled Water, Brine, Compressed Air, Process Water, Nitrogen, Natural Gas, etc. Significant Metering Used within the Power Houses to Manage the Generation Side
11
11 © 2007 OSIsoft, Inc. Interfaces BAS –Rosemount - Fix 32 –Siemens - Apogee –Emerson - Delta V –SQL Based Historians DCS –Fisher Provox –Westinghouse WDPF –Westinghouse Ovation –Taylor Mod 300 –Emerson - Delta V
12
12 © 2007 OSIsoft, Inc. Nodal Power Markets
13
13 © 2007 OSIsoft, Inc. Goals Reduce utility costs at Kodak Park through improved demand side management Consolidation of the utilities data Create Awareness via the Web Grow a Culture of Energy Efficiency
14
14 © 2007 OSIsoft, Inc. Solution – Current status Over 100,000 PI Points currently established 23 ProcessBook / DataLink Users 150 Concurrent Web Users 180 + iView Pages 27 Interfaces installed
15
15 © 2007 OSIsoft, Inc.
16
16 © 2007 OSIsoft, Inc.
17
17 © 2007 OSIsoft, Inc.
18
18 © 2007 OSIsoft, Inc. Numerous water main breaks due to pressure control issues Increased visibility and easy access to this data has improved control and reduced the frequency of these “costly” water main breaks dramatically.
19
19 © 2007 OSIsoft, Inc. Expanded use of our Energy Information System has been an effective tool to help enable us to consolidate two High Purity Water Systems and a de-mineralized water system down to just one High Purity Water System.
20
20 © 2007 OSIsoft, Inc.
21
21 © 2007 OSIsoft, Inc.
22
22 © 2007 OSIsoft, Inc.
23
23 © 2007 OSIsoft, Inc.
24
24 © 2007 OSIsoft, Inc.
25
25 © 2007 OSIsoft, Inc.
26
26 © 2007 OSIsoft, Inc. Mini Projects Demand Side –Better correlation of MFG energy usage to production volumes –Identified opportunities in manufacturing to implement an energy conservation mode between product runs –Extended carbon recovery cycles
27
27 © 2007 OSIsoft, Inc. Mini Projects II –More effective utilization of labs with fume hoods –More effective “Time of Day” scheduling for lighting and HVAC –Temperature / HVAC fan set points –System is considered an essential tool during our energy savings workshops (Kaizens) –Heightened awareness of many end users
28
28 © 2007 OSIsoft, Inc. Mini Projects Generation side findings –Plant loading optimization –Boiler fan optimization –Exhaust head improvements –Better management of self generation vs. purchased power –Improved deaerator utilization
29
29 © 2007 OSIsoft, Inc. Harvest Time The Energy Information System (EIS) has been an essential tool to help us reach our goal of: “One Powerhouse for Kodak Park” Collectively these efforts have yielded savings into the millions of dollars.
30
30 © 2007 OSIsoft, Inc. Case Study – Codelco Five Operating Divisions (Chuquicamata, Radomiro Tomic, El Salvador, Andina, El Teniente), Each full mining/metallurgical complex (mining, concentrators, smelting, refining, leaching, solvent extraction, electrowinning, utilities, and maintenance)
31
31 © 2007 OSIsoft, Inc. Radomiro Tomic Architecture
32
32 © 2007 OSIsoft, Inc. Teniente Mine/Concentrator
33
33 © 2007 OSIsoft, Inc. Projects Water Management Environmental Regulation Asset Management Troubleshooting Operating Effectiveness Energy Management Inlet Vanes Utilities (Power, Steam, Air) Trading/Power Purchase
34
34 © 2007 OSIsoft, Inc. Lessons Learned No BIG BANG – 1000 little bangs Continuous Improvement Process Combined Capital and Intelligence Operation Infrastructure Approach – Remove Infrastructure from Projects Lowers the Cost of Curiosity