RAILROAD COMMISSION OF TEXAS Steven Rios Corpus Christi Area Manager September 2015
2
NEW PIPELINE CONSTRUCTION REQUIREMENTS
3
Session Overview Goals of this presentation is to: Clarify who the pipeline construction rules apply to Review what’s covered under the rules Provide information on Corrosion Control Requirements for cathodic protection
4
New Pipeline Construction Reports Applicability Gas Pipelines under 49 CFR 192 – Transmission – Gathering – Distribution/Mastermeter Liquid Pipeline under 49 CFR195 – Crude/Condensate – HVL Gas/Liquid under TAC – Offshore – Production
5
New Pipeline Construction Reports Requirements of the Rule Liquid, Gas Transmission or Gathering – PS-48 - Any construction totaling one or more miles (new or existing) Gas Distribution / Master Meter – PS-48 - New construction on natural gas distribution or master meter system of five miles or more LPG Distribution – PS-48 - New construction report for the initial construction of a new liquefied petroleum gas distribution system
6
Summary
7
New Pipeline Construction Reports Corrosion Control Requirements Liquids – New pipeline metallic systems, relocation or replacement of existing facilities, and the operation and maintenance of steel pipelines. Coatings shall be inspected with Holiday Detector Joints, fittings, and tie-ins shall be coated with materials compatible with the coatings on the pipe. Test lead wire material shall be compatible with the pipe coating and wire insulation.