Download presentation
Presentation is loading. Please wait.
Published byClement Barton Modified over 9 years ago
1
Westfield Public Works Department Jeremy Lollar, Director June 8, 2015
2
Primary Responsibilities Road Safety Road Maintenance Storm Water Maintenance and Repair Infrastructure Improvement (Capital Projects) Infrastructure Inspection Lending a Helping Hand
3
Road Safety Snow Removal Brickman Practical Property Group Pothole Repair FE Harding 108 tons of Asphalt placed (88 hot/20 cold) Federal HSIP Grant Highway Safety Improvement Program $1.5 Million awarded for ADA and intersection safety improvements
4
Road Maintenance Pothole repair Crack sealing Spring and Fall Seasons Night work Shoulder repair Infrared patching Resurfacing Highway Safety Improvement Program $1.5 Million awarded for intersection safety improvements
5
Storm Water Maintenance and Repair Erosion and encroachment inspection Culvert replacement and repair Sink hole repair Ditching and swale repair
6
Infrastructure Improvement 2015 Spring Resurfacing 156 th and Springmill Round-a-bout 191 st and Tomlinson Round-a-bout Grand Park Blvd. Extension 161 st and Oakridge Round-a-bout Mill Street Extension
7
Infrastructure Improvement 156 th and Springmill Round-a-bout
8
Infrastructure Improvement 191 st and Tomlinson Round-a-bout
9
Infrastructure Improvement Grand Park Blvd. Extension
10
Infrastructure Improvement 161 st and Oak Ridge Round-a-bout
11
Infrastructure Improvement Mill St. Extension
12
Lending a Helping Hand Grand Park Design and construction of the WYSI field additions Under-brush clearing in the wooded areas Rock pile removal and placement Shade sail installation
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.