Westfield Public Works Department Jeremy Lollar, Director June 8, 2015.

Similar presentations


Presentation on theme: "Westfield Public Works Department Jeremy Lollar, Director June 8, 2015."— Presentation transcript:

1 Westfield Public Works Department Jeremy Lollar, Director June 8, 2015

2 Primary Responsibilities Road Safety Road Maintenance Storm Water Maintenance and Repair Infrastructure Improvement (Capital Projects) Infrastructure Inspection Lending a Helping Hand

3 Road Safety Snow Removal Brickman Practical Property Group Pothole Repair FE Harding 108 tons of Asphalt placed (88 hot/20 cold) Federal HSIP Grant Highway Safety Improvement Program $1.5 Million awarded for ADA and intersection safety improvements

4 Road Maintenance Pothole repair Crack sealing Spring and Fall Seasons Night work Shoulder repair Infrared patching Resurfacing Highway Safety Improvement Program $1.5 Million awarded for intersection safety improvements

5 Storm Water Maintenance and Repair Erosion and encroachment inspection Culvert replacement and repair Sink hole repair Ditching and swale repair

6 Infrastructure Improvement 2015 Spring Resurfacing 156 th and Springmill Round-a-bout 191 st and Tomlinson Round-a-bout Grand Park Blvd. Extension 161 st and Oakridge Round-a-bout Mill Street Extension

7 Infrastructure Improvement 156 th and Springmill Round-a-bout

8 Infrastructure Improvement 191 st and Tomlinson Round-a-bout

9 Infrastructure Improvement Grand Park Blvd. Extension

10 Infrastructure Improvement 161 st and Oak Ridge Round-a-bout

11 Infrastructure Improvement Mill St. Extension

12 Lending a Helping Hand Grand Park Design and construction of the WYSI field additions Under-brush clearing in the wooded areas Rock pile removal and placement Shade sail installation