Presentation is loading. Please wait.

Presentation is loading. Please wait.

EUCLIPSE EU Cloud Intercomparison, Process Study and Evaluation Project A.P. Siebesma, S. Bony, M. Webb, B. Stevens, F. Selten, R. Neggers, J. Quaas, I.

Similar presentations


Presentation on theme: "EUCLIPSE EU Cloud Intercomparison, Process Study and Evaluation Project A.P. Siebesma, S. Bony, M. Webb, B. Stevens, F. Selten, R. Neggers, J. Quaas, I."— Presentation transcript:

1 EUCLIPSE EU Cloud Intercomparison, Process Study and Evaluation Project A.P. Siebesma, S. Bony, M. Webb, B. Stevens, F. Selten, R. Neggers, J. Quaas, I. Sandu, M. Ringer, Bodas-Salcedo, H. Chepfer, E. Guilyardi, F. Hourdin, J-L. Dufresne, G. Tselioudis, A. Romanou, T. Palmer, M. Rodwell, A. Weisheimer, S.R. de Roode, H. Jonker, I. Beau, G. Bellon, D. Bouniol, F. Bouysell, M Deque, H. Douville. F. Guichard, G. Svensson, M. Tjernstrom, U. Lohmann, H. Pawslowska, J. Teixeira, M. Lautenschlager, S. Kindermann

2 What is EUCLIPSE? A (likely) European Commission (EC) sponsored collaborative project Plans are build on the CFMIP2/GCSS proposals View it as capacity building around the CFMIP2/GCSS plans Starting date : Fall 2009/Early 2010 Duration: 4 years.

3 Budget Total Budget: 5 Million Euro Eu Sponsored: 3.5 Million Euro Involved Institutes:1.5 Million Euro Mainly used to hire personel: 42 man year total

4 Involved Institutes

5 TOPICS

6 WP1: Evaluation techniques and climate model experiments Largely overlapping CFMIP2/GCSS Extra resources for data hosting and dissemination (DKRZ) Led by: George Tselioudis (Athens)

7 WP2: Climate Model Evaluation and Analysis Extra: cloud aerosol evaluation subproject (Quaas MPI Hamburg) subproject on evaluation of polar clouds (Svensson, Stockholm) Led by: Sandrine Bony (IPSL)

8 WP3: Process Evaluation Analysis Largely overlapping with present activities discussed in this workshop Some extra emphasis on ESM evaluation on specific locations: Cloudnet, ARM AMMA,GPCI Led by: Stephan de Roode (TU Delft)

9 WP4: Metrics and diagnostics for narrowing uncertainties in clolud climate feedback Extra: NWP related activities to identify cloud representation biases: Initial tendency techniques. Transpose-AMIP type of experiments. model experiments nudged to reanalysis data. Led by: Bjorn Stevens (MPI Hamburg)

10 Outreach Activities 1 or 2 Summerschools Outreach of model and observational data. Publications, Websites, Brochures etc……

11 Conclusions View EUCLIPSE as a “funded organic outflow” of CFMIP2 that will increase capacity to enlarge the chances of success for the CFMIP2/GCSS plans! (like EUROCS vs GCSS in the past)

12 TOPICS


Download ppt "EUCLIPSE EU Cloud Intercomparison, Process Study and Evaluation Project A.P. Siebesma, S. Bony, M. Webb, B. Stevens, F. Selten, R. Neggers, J. Quaas, I."

Similar presentations


Ads by Google