Download presentation
Presentation is loading. Please wait.
Published byLeona Rose Modified over 9 years ago
1
High School Task Force DECATUR PUBLIC SCHOOLS 02/03/2009
2
The Need Physical Needs Summary Many building systems are at the end of their useful lives (piping, windows, doors, heating/cooling equipment). Many components of the building envelope are beyond their useful life, particularly at EHS. Many interior finishes are worn and should be replaced (there are some hazardous materials consequences). There are opportunities for increased energy savings. Most spaces lack air conditioning. In addition to addressing these physical needs is the need to alter spaces to accommodate changing educational programs. DPS #61 High School Task Force
3
ELECTRICAL SERVICE UPGRADE
4
UPGRADE ELECTRICAL DISTRIBUTION SYSTEM
6
TECHNOLOGY WIRING
7
HEATING AND COOLING SYSTEM UPGRADE
8
BLEACHER REPLACEMENT
9
ROOF REPLACEMENT
10
CHALK BOARD REPLACEMENT
11
CARPET REPLACEMENT
12
ASBESTOS ABATEMENT AND FLOORING REPLACEMENT
13
INTERIOR DOOR AND SECURITY LOCK REPLACEMENT
14
EXTERIOR DOOR AND LOCK REPLACEMENT
15
PROVIDE SECURE MAIN ENTRY
16
MAIN ENTRY EXTERIOR VIEW
17
LOCKER REPLACEMENT
18
WORN OUT LOCKERS
19
WORN OUT RESTROOM FIXTURES AND FINISHES
20
WINDOW UPGRADE
21
EHS CURTAIN WALL EXTERIOR VIEW
22
EHS CURTAIN WALL INTERIOR VIEW
23
WORN OUT AUDITORIUM SEATING
24
1958 EMERGENCY GENERATOR
25
The Need Possible Enhanced Programming AP Classes Gifted Program Night School Community Partnerships Decatur Technical Academy and DPS61 Foreign Language Colleges in our Building DPS #61 High School Task Force
26
The Need Possible Enhanced Programming (cont.) Small Learning Communities Local Business Student Mentors State of the Art Science Labs Clubs and Intramurals Extra Curricular Activities DPS #61 High School Task Force
27
High School Entrances DPS #61 High School Task Force
28
Interior Entrance
29
AuditoriumsPerforming Arts Center
30
LibrariesMulti-Media Center
31
Science Labs
32
Main Office
33
Family Consumer ScienceHome Economics
34
Art
35
Shower Rooms
36
Athletic Storage
37
Locker Room
38
Band RoomPerforming Arts Instruction
39
Wood ShopIndustrial Technologies
40
Storage
41
Offices
42
Computer Labs
43
CafeteriaFood Court
44
Decatur Area Technical Academy TECH ACADEMY ENROLLMENT HISTORY YearTotal YearTotal 1999-2000 3932004-2005 478 2000-2001 4492005-2006 519 2001-2002 3942006-2007 579 2002-2003 4142007-2008 639 2003-2004 4092008-2009 645 DPS #61 High School Task Force
45
Decatur Area Technical Academy TECH ACADEMY PROJECTED ENROLLMENT (based upon 4% growth) Year Total 2009-2010 670 2010-2011 697 2011-2012 725 2012-2013 755 2013-2014 784 2018-2019 950 DPS #61 High School Task Force
46
Decatur Area Technical Academy Main Entrance
47
Decatur Area Technical Academy Automotive Annex Entrance
48
Decatur Area Technical Academy Inside Main Entrance 21 st Century Entrance
49
Decatur Area Technical Academy DPS #61 High School Task Force 21 st Century Entrance
50
Decatur Area Technical Academy 21 st Century Classroom Typical Classroom
51
Decatur Area Technical Academy Health Occupation Classroom
52
Decatur Area Technical Academy Computer Repair Laboratory
53
DPS #61 High School Task Force
56
As the Teachers Requested it
57
As the Principal Ordered it
58
As the Central Office Designed it
59
As the Board of Education Approved it
60
As the Maintenance Department installed it
61
What the Students Wanted
62
Planning Process Discovery Visioning Build Solutions Selecting DPS #61 High School Task Force
63
Process Timeline Discovery February 25EHS Walk-Through March 16MHS Walk-Through April 7Tech Academy Walk- Through April 29Review Existing Building Conditions/ Educational Programs DPS #61 High School Task Force
64
Process Timeline Visioning May 18Visioning Workshop DPS #61 High School Task Force
65
Process Timeline Build Solutions June 11Develop Alternatives Renovate Existing Buildings DPS #61 High School Task Force
66
Process Timeline Selecting June 29Select Best Option Renovate Existing Buildings DPS #61 High School Task Force
67
Process Timeline Build Solutions July 20Develop Alternatives Consolidated High School/ Tech Academy DPS #61 High School Task Force
68
Process Timeline Selecting August 10 or 12Select Best Option Consolidated High School/ Tech Academy DPS #61 High School Task Force
69
Process Timeline Selecting August 31Options Forum Renovate or Build New DPS #61 High School Task Force
70
Process Timeline September 1 or 2Presentation Preparation DPS #61 High School Task Force
71
Process Timeline October 13Decatur Public School District #61 Board Meeting DPS #61 High School Task Force
72
Normal West High School
73
Mt. Zion High School
74
Mahomet High School
75
Blue Ridge High School
76
Glenwood High School
77
Pana High School
78
Effingham High School
79
Williamsville High School
80
Monticello High School
81
Beardstown High School
82
Maroa-Forsyth High School
83
Argenta High School
84
Normal Community High School
85
Marshall High School
86
Rochester High School
87
Riverton High School
88
Warrensburg High School
89
Bloomington High School
90
Washington High School - Planning
91
Meridian High School - Planning
92
Springfield High School - Planning
93
Champaign High School - Planning
94
Recap of Purpose DPS PK-12 ENROLLMENT HISTORY 20012002200320042005200620072008 PK 292384 398437460461500585 K-659505577 539551405051492749304837 7-8 17761703 166515591531139213681286 9-1225462546 249125482572245223922428 Total1056410210 994996849614923291909136 Annual Change N/A-354 -261-265-70-382-42-54 Annual % Change N/A-3% -3%-3%-1%-4%0%-1% *Green indicates an increase *Red indicates a decrease
95
DPS History and Averages YearReg EdSpedTotalAnnual Change 20012145 3852530-94 20022247 2732520-10 20032240 2512491-29 20042292 256254857 20052411702481-67 200622412112452-28 200722001922392-60 20082228200242836 *Green indicates an increase *Red indicates a decrease 3 Year Average Enrollment2424 3 Year Average Change-18 5 Year Average Enrollment2460 5 Year Average Change-13 8 Year Average Enrollment2480 8 Year Average Change-25
96
DPS High School Summary New Students 2007-2009 Coming From:2006-20072007-20082008-2009 Average Returning Students 39 28 28 32 Macon County 105 104 61 90 Outside Macon Co. 61 58 61 60 Outside Illinois 54 47 40 47 Other 19 19 15 18 Total: 2241 256 205246 High school enrollment has stabilized recently due to gaining an average of 246 students per year from outside districts. Recap of Purpose
97
Next Meeting February 25, 2009 at 6:30 p.m. EHS Walk-through and Meeting
98
Questions?
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.