Download presentation
Presentation is loading. Please wait.
Published byChristiana Briggs Modified over 9 years ago
1
Western Regional Air Partnership Air Managers Committee ~ Implementation Work Group 308 Regional Haze SIP/TIP Development Guides Corky Martinkovic, AzDEQ Ray Mohr, CoDEQ IWG Meeting ~ Tempe, Arizona December 14-15, 2004
2
Three Guides for 308 SIP/TIP Development Road Map – a process guide that takes the developer through the general tasks needed to meet the rule requirements Relationship Table – a nexus guide that allows the developer to see how WRAP work products (detailed in the WRAP Work Plan) serve the processes outlined in the Road Map Resource Matrix – a resource guide that outlines SIP components (from the WRAP Strategic Plan), approvability criteria, any suggested language, and links to WRAP work products and rule processes
4
IWG on www.wrapair.org www.wrapair.org Guides location on IWG document page
5
Suggested Additions Within (Final) Documents Box: Current WRAP Work Plan (link) Current WRAP Strategic Plan (link) 308 SIP/TIP Road Map 308 SIP/TIP Relationship Table (sorted by Road Map) (sorted by Road Map) 308 SIP/TIP Relationship Table (sorted by Work Product code) (sorted by Work Product code) 308 SIP/TIP Resource Matrix
6
In addition… 308 SIP/TIP Table of Contents (suggested structure) 308 SIP/TIP Table of Contents for Technical Support Document (suggested structure) 308 SIP/TIP Technical Support Document (link) Interactive BLOG for SIP Developers (link)
7
And, for example… WP Product Code / 308 SIP/TIP Product / Status / Link: AoH1 / Attribution of Haze Report / Phase I Draft www.wrapair.org/forums/aoh/docs AMR2 / Causes of Haze Report / Phase I Final www.wrapair.org/forums/aamrf/projects/haze/index SS1 / Identification of BART-eligible Sources Report / Draft www.wrapair.org/forums/ssjf/docs TW1 / TEISS / Final www.wrapair.org/forums/tddwg/docswww.wrapair.org/forums/tddwg/docs (etc.) www.wrapair.org/forums/tddwg/docs
8
Next Steps Develop a structure, represented initially by a table of contents, for the SIP/TIP Develop where possible template language and “locators” for Appendix documents and TSD references (i.e., 309 STIP) Develop guides for states completing 309(g) SIPs and 309 SIP revisions
9
Continue to clarify issues… For example, issues for the 309(g) SIPs: – Will WRAP update C1A data; use 309 data? – How will 309 “credit” be determined? – Sufficient time to determine if a 309(g) strategy is compatible with a 309 strategy? – How to interface with 309 trading program, BART, and NOx/PM strategies?
10
Ask questions… How do 308 SIPs address the Clean Air Corridor established by the GCVTC for the 309 SIPs? Does the WRAP Work Plan (and Strategic Plan) along with the work of the forums and committees meet the needs of the SIP Development Process? What do states need to complete without the assistance of WRAP? Or with FLMs? Feds?