Presentation is loading. Please wait.

Presentation is loading. Please wait.

IMPACT Survey. Survey Results 198 Schools 81.5% participated SW RegionNW RegionSC RegionNC Region SE RegionNE Region BuncombeAsheAnsonChapel HillCravenCurrituck.

Similar presentations


Presentation on theme: "IMPACT Survey. Survey Results 198 Schools 81.5% participated SW RegionNW RegionSC RegionNC Region SE RegionNE Region BuncombeAsheAnsonChapel HillCravenCurrituck."— Presentation transcript:

1 IMPACT Survey

2 Survey Results 198 Schools 81.5% participated SW RegionNW RegionSC RegionNC Region SE RegionNE Region BuncombeAsheAnsonChapel HillCravenCurrituck BurkeCaldwellCabarrusChatmanDuplin Edenton- Chowan MaconDavidsonClevelandGuilfordJonesPerquimans Swain Thomasville CityCumberland Nash-Rocky MountLenoir Transylvania RobesonOrangePamlico Yancey UnionWakePender Wayne Wilson

3 Student Population 0% 10% 20% 30% 40% 50% 60 60% 100-300300-500500-700above 700

4 Personnel Instructional Technology Facilitator 0% 5% 10% 15% 20% 25% 30% 35% 40% 45% 50% Full timePart TimeNo

5 Personnel Media Assistants 0% 10% 20% 30% 40% 50% 60% 70% 80% Full TimePart TimeNo

6 Funding for Instructional Technology Facilitator Funding 0% 5% 10% 15% 20% 25% 30% FederalStateLocalTitle One State, Local Teacher allocation FederalStateLocalTitle One Combine and Federal State, Local Teacher allocation

7 Funding for Media Assistant Funding of Media Assistant 0% 10% 20% 30% 40% 50% 60% FederalStateLocalCombine State and Local

8 Ideas for Flexibility Ways to be Flexible 0% 5% 10% 15% 20% 25% 30% Use Teacher Assistants or Tutors VolunteersIncrease Specials Rotation Decrease Specials Rotations Add Guidance to Rotation Use Classroom Teacher Assistants

9 Collaborative Planning Planning Time 0% 5% 10% 15% 20% 25% 30% 35% 40% 1 hour a week1 hour a month1 hour each 9 weeks 1/2 day each 9 weeks Grade Level Meetings, when necessary no established time

10 Elephant in the Living Room Obstacles 0% 5% 10% 15% 20% 25% 30% 35% 40% 45% Adequate Personnel Creating Teacher Buy-in SchedulingFundingAdministrative Support

11 Change can be difficult Teacher Buy In Adequate Personnel –Media Coordinator –Media Assistant –Instructional Technology Facilitator Collaborative Planning is key Scheduling IMPACT


Download ppt "IMPACT Survey. Survey Results 198 Schools 81.5% participated SW RegionNW RegionSC RegionNC Region SE RegionNE Region BuncombeAsheAnsonChapel HillCravenCurrituck."

Similar presentations


Ads by Google