Download presentation
Presentation is loading. Please wait.
Published byBaldric Richard Modified over 9 years ago
1
Development Requirement/Tools Brown Bag Luncheon Series Site Due Diligence Jarrod Likar and Tim McDonough
2
SITE SELECTION Terrain/Location Roads Drainage Water/Wastewater Private Utilities
3
TERRAIN/LOCATION Environmental Clearance Specific Area Plans Arroyos/LEE Lines
4
Environmental Site Assessment Defined by 3 Phases Phase 1 – Site and Document Review (Arch – Bio) Phase 2 – Site Investigation (Testing) Phase 3 – Remediation
5
Environmental Clearance
6
Specific Area Plan
7
Arroyos/LEE Lines
8
ROADS Survey the area Long Range Plan –MRCOG/MPO Adequate for intended use? –Volume / Size / Access Control Owner –City, County, NMDOT TIA (Traffic Impact Analysis)
9
Specific Area Plan
10
ROADS Survey the area Long Range Plan –MRCOG/MPO Adequate for intended use? –Volume / Size / Access Control Owner –City, County, NMDOT TIA (Traffic Impact Analysis)
11
TRAFFIC IMPACT ANALYSIS Always required by the City Estimates volumes and timing of new traffic Recommends improvements to meet traffic conditions –Signals, Additional lanes, Access limitations Based on existing projections and intended future use
13
DRAINAGE Historic vs. Developed On-Site vs. Off-Site A significant issue for most large sites Must allow off-site flows through site Often limited to Historic Flows Based on 100 year event (1%)
14
DRAINAGE Storm Sewers?? Arroyos?? –COE 404 Permit –CLOMR/LOMR On-Site Ponding/Regional –Detention / Retention Percolation/Evaporation/Transpiration
17
DRAINAGE Watershed Management Plans Facility Plans Drainage Management Plans Individual Grading and Drainage Plans
18
WATERSHED MANAGEMENT PLANS Venada WMP Montoyas WMP –Lomitas Negras WMP La Barranca WMP Black WMP Calabacillas WMP (Pending)
20
FACILITY PLANS
21
DRAINAGE MANAGEMENT PLAN
22
INDIVIDUAL GRADING AND DRAINAGE PLAN
23
WATER Flow / Pressure /Volume –Flow – Pipe Size –Pressure – Elevation –Volume – Storage/Production Fire Protection Statement of W & WW Availability –Hydraulic model Off-Site Improvements
24
WASTEWATER Collection & Treatment –Collection – Pipe Size –Treatment – Capacity of Treatment Facility Pretreatment Requirements Off-site Improvements
25
ELECTRICITY - PNM Where is access? –Transmission / Distribution Requirements –Voltage / Phase / KVA Required Upgrades –Transformers / Substation –Offsite access & Easements All Distribution Lines Underground
26
NATURAL GAS - NMGCo Where is access? –Transmission / Distribution Requirements –Volume Required Upgrades –Pressure Reducing Station –Offsite access & Easements
27
COMMUNICATIONS QWEST – CABLE ONE Where is access? Requirements Required Upgrades Options
28
REQUEST A DESIGN REVIEW COMMITTEE MEETING All Departments / Utilities are represented Ask Specific Questions
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.