SOLAR PARK – ROMANIA Photovoltaic Project Stage : Ready to Build 6,174 MWp November 2013 EXPERT GROUP CONSULTING
2
Ready to build project Term Sheet signed and Contract negotiation on-going with EPC co. for plant construction Contract signed for underground medium voltage line Contract for Grid Connection signed in 2013 Surveillance (“Dispecerizare”) required by Transelectrica: calendar and very low cost secure
3
The project is located in the south part of Romania, in an area with a high solar irradiation potential, 70 km North from Bucharest, near Targoviste City (2 km from the City), in an industrial area, near a large modernized Transelectrica station (aprox. 1,5 Km); Excellent road infrastructure for construction and general access to the Park. The area is not crowded and suitable for solar PV developments not having influence by wind parks, with a very good stability of the grid; The land was removed from the agricultural circuit, and is now located in intra muros area - according to the new requirements of the legislation. The total surface of the land is 12 ha and is owned by the company.
6
ATR obtained from Transelectrica on April 25th 2013 Building Authorizations: ◦ For Park construction obtained on May 31st 2013 ◦ For Transelectrica Station and Underground Medium voltage Line obtained on June 6th 2013 ANRE: ◦ Set-up Authorization: Approved by ANRE on May 31st 2013 Legal Due Diligence Report issued by a very reputable law firm: available. Transelectrica – Grid Connection Contract– signed
7
The connection to the Grid made directly to Station 20kV Electrica Targoviste owned by Transelectrica. To execute the Grid Connection was necessary: ◦ To install one cell (20kV) in Station Electrica Targoviste ◦ To construct the underground medium voltage cables approx. 1,5 km in length * ◦ To construct underground optic fiber for Transelectrica surveillance (dispecerizare) *
8
Installed capacity: 6,174 MWp Total energy production: 8,390 MWh/a Energy Yield: 1360 kWh/kWp Capacity factor: 15,5% Technical Project and Detailed Design in compliance with Romanian legislation : finalized.
9
Negotiations for taking over all the company shares for a very attractive price : 120,000 €/Mwp; Legal asistance during negociation process and up to the completed transaction status; Legal due diligence report on Solar Park Project; Briefing on the legal framework governing the development of photovoltaic projects in ROMANIA, including authorization process; Legal assistance regarding EU legislation on green energy production and its benefits;
10
Liliana Todiras Project Manager P: +4 0722 378 457 F : +4 0233 220 402 84 Traian Blvd. Neamt County Piatra Neamt 610142 Romania liliana.todiras@yahoo.com liliana.todiras@tanasasiasociatii.ro