1 ROADS Services Training Group LOCAL AUTHORITY ROADS CONFERENCE 2015 Reforms, Challenges and Safety Treacys West County Hotel, Ennis, May 2015.
2
Reforms, Challenges and Safety Guidelines for the Backfilling and Reinstating of Openings on Public Roads “The Purple Book” Brendan Jennings Senior Engineer Cavan County Council
3
Specification and Drawings Previous version was comprehensive and robust document How do we make them better What do the users need What is best practice in other countries Other specifications and standards have changed, NRA etc. New technology and construction methods Consistent approach Buy-in from all users
4
Specification Chapter 6 of the Purple Book To be read in conjunction with Chapter 7 – Drawings Main headings similar to previous version Reordered to match the sequence of works on site 11 sections in chapter 6 New sections introduced
5
Specification - Layout 1) Introduction 2) Definitions 3) Pre-works Investigations 4) Identification Markers 5) General Construction Requirements 6) Backfilling of Openings 7) Compaction 8) Joints, Bonding and Sealing 9) Road Assets & Equipment 10) Quality Control 11) Alternative Methods
6
Introduction & Definitions Introduction Can’t cover every scenario Prior written approval of Road Authority Definitions Intervention Temporary Reinstatement Permanent Reinstatement Immediate Permanent Reinstatement
7
Pre-Works Investigations New section Encourages proper planning of the works Identification of services Coordination with other stakeholders Health & Safety element Guides the user to collate the information needed for the application Agree works with Road Authority Reduce costs in long term
8
Identification Markers
9
General Construction Requirements National Roads - NRA Spec Materials - NRA Spec for Roadworks Location of trench / avoidance of services Cutting the road Excavation works
10
General Construction Requirements Excavating around trees Availability & use of steel plates Site Management & Storage Rubber tyred/tracked excavators
11
Backfilling & Compaction Backfill Material Compaction equipment Use of compaction equipment Lift thickness for bound/unbound materials Compaction requirements Influences long term performance
12
Joints Bond coat – Cl900 Vertical faces of joints For both temp & permanent reinstatement Over banding – skid resistance
13
Joints – Bad Example
14
Joints – Good Example
15
Road Assets Road Markings & Road Studs Specialist / Ornamental Surfaces Traffic Sensors / Loops Street Furniture Manhole covers & other ironwork
16
Quality Control Defects – e.g. Edge depression, ravelling, rutting, potholes, joint sealing Defects as per PSCI Surveys Intervention limits
17
Alternative Methods Trenchless pipe laying Micro trenching Protection of existing and new service Mixed opinion Not exclude advancement in technology Control with Road Authority
18
Drawings Chapter 7 of Purple Book General reinstatement notes General arrangement drawings plus 14 standard drawings Read in conjunction with Chapter 6 – Specification Some similarity to previous version Series of notes with each drawing
19
General Arrangement Drawings Plan view of potential layouts with resultant reinstatement requirements Layouts for roads & footpaths Longitudinal, Transverse Concrete, asphalt concrete and modular paving situations Management of trim lines Additional reinstatement Existing joints, kerbs, ironwork
20
General Arrangement Drawings
23
Standard Drawings – Part 1 1) Permanent & Immediate Permanent Reinstatement - Transverse Openings in Roadways 2) Temporary Reinstatement - Transverse Openings in Roadways (Subject to Specific Permission of the Road Authority) 3) Temporary Reinstatement - Longitudinal Openings in Lightly Trafficked Rural Roads 4) Temporary Reinstatement - Longitudinal Openings in Roadways 5) Permanent & Immediate Permanent Reinstatement - Longitudinal Openings in Roadways 6) Permanent & Immediate Permanent Reinstatement - Longitudinal Openings in Roadways at Heavy Duty Locations 7) Permanent & Immediate Permanent Reinstatement - Longitudinal Openings in Rural Roadways with Surface Dressing
24
Standard Drawings – Part 2 8) Permanent & Immediate Permanent Reinstatement - Concrete Roadways 9) Permanent & Immediate Permanent Reinstatement - Roadways with Precast Concrete Paving Blocks 10) Temporary Reinstatement - Footways – (Subject to Specific Permission of the Road Authority) 11) Permanent & Immediate Permanent Reinstatement - Asphalt Concrete (Bituminous Macadam) Footways 12) Permanent & Immediate Permanent Reinstatement - Concrete Footways 13) Permanent & Immediate Permanent Reinstatement - Precast Concrete Paving Block / Concrete Slab Footways 14) Permanent Reinstatement - Grass Verges, Medians, Fields and Lawns
25
Transverse Openings
26
Longitudinal Openings
27
Surface Dressed Roads
28
Concrete Roads
29
Paved Footways
30
Drawings Notes
31
Conclusion Improve on current standards Consistent implementation Better compliance Reduced costs Scope to embrace new technology
32
Conclusion