Update to Loxahatchee River Coordinating Council L-8 Reservoir Water Quality Flow-way 1 Water Delivery Test G-92 Structure Replacement September 29, 2008.

Similar presentations


Presentation on theme: "Update to Loxahatchee River Coordinating Council L-8 Reservoir Water Quality Flow-way 1 Water Delivery Test G-92 Structure Replacement September 29, 2008."— Presentation transcript:

1 Update to Loxahatchee River Coordinating Council L-8 Reservoir Water Quality Flow-way 1 Water Delivery Test G-92 Structure Replacement September 29, 2008 L-8 Reservoir Water Quality Flow-way 1 Water Delivery Test G-92 Structure Replacement September 29, 2008

2 L-8 Reservoir – August 2007

3 Parameters (Cell 3) Sampling Depth 0.5 m6.5 m12.5m Temperature27.723.421.9 D.O.8.836.794.39 Specific Conductance 285328172816 pH8.38.17.8 TSS<3 TDS164916441328 TKN.81.97.87 Tot. Kjeldahl N0.810.970.87 Nitrate/Nitrite<0.0050.1230.130 Ammonia<0.005 Total Phosphorus0.0060.0080.023 Ortho-Phosphorus0.0060.0020.005 Chlorides442614633 Sulfate165229236

4 Parameters (Cell 6) Sampling Depth 0.5 m6.5 m12.5m Temperature27.923.422.3 D.O.107.365.01 Specific Conductance 380138093835 pH7.97.77.6 TSS53<3 TDS227522472317 TKN1.121.071.15 Tot. Kjeldahl N1.00.860.84 Nitrate/Nitrite0.1180.2060.308 Ammonia<0.0050.009<0.005 Total Phosphorus0.0100.0180.022 Ortho-Phosphorus<0.002 Chlorides943895914 Sulfate347329334

5 Results Similar to historical for WY 05 – WY 08 Lower concentrations of nutrients in cells than in either L-8 or M-Canal No metals exceeded WQ criteria Class I/III criteria exceeded for: Specific conductance, TDS, Chlorides and Gross Alpha Levels comparable to current cell historical levels – levels of parameters in exceedence are expected to decrease as reservoir is operated Similar to historical for WY 05 – WY 08 Lower concentrations of nutrients in cells than in either L-8 or M-Canal No metals exceeded WQ criteria Class I/III criteria exceeded for: Specific conductance, TDS, Chlorides and Gross Alpha Levels comparable to current cell historical levels – levels of parameters in exceedence are expected to decrease as reservoir is operated

6 SiteUnitnAverageMinimumMaximum L8MZBN µS/cm 20768489978 L8MZBS µS/cm 20569480695 Mixing Zone Boundaries

7 FLOW-WAY 1 TEST PURPOSE: To test water delivery from the regional water system to the Loxahatchee River Basin using the existing infrastructure TEST DATE - July 1 – July 3, 2008 PURPOSE: To test water delivery from the regional water system to the Loxahatchee River Basin using the existing infrastructure TEST DATE - July 1 – July 3, 2008

8 M Canal Widening Control #2 Pump Station G-161 Northlake Bridge G-160 Flow-way #1 Grassy Waters Preserve – M Canal

9 TEST CRITERIA Establish baseline stages/flow rating curves Control GWP releases to limit effect on apple snails Release ~150 cfs at Control 2, 100 cfs at G-161, 100 cfs to NWFLR Maintain appropriate stages at GWP, G-161 and G-160 Ensure coordination with stakeholders Measure water flow at critical locations Obtain water quality samples during test Establish baseline stages/flow rating curves Control GWP releases to limit effect on apple snails Release ~150 cfs at Control 2, 100 cfs at G-161, 100 cfs to NWFLR Maintain appropriate stages at GWP, G-161 and G-160 Ensure coordination with stakeholders Measure water flow at critical locations Obtain water quality samples during test

10

11 RESULTS DATECalculated Daily average flow (cfs) CTRL 2G- 161 G-160G-92Lainhart Dam 7/1/081474173110128 7/2/0814791160138200 7/3/081435020671215

12 DATEFlow Station Ctrl 2G-161G-160E. Perimeter Canal 7/2/08150-10035 7/3/08-9580- Measured Flows

13 Measured Avg. Daily Water Levels DATEStage Elevation (feet NGVD) GWP (G- 161 HW) G-161 TWG-160 HW 7/1/0818.1816.1415.03 7/2/0818.0417.1215.13 7/3/0818.1517.1014.98

14 Conclusions Confirmed that if replacement water is available, structures can be operated to deliver flow Confirmed 150 cfs at control 2, but only 35 cfs at E. perimeter canal G-161 operated to deliver 100 cfs to C-18 Flow to NWFLR exceeded 100 cfs during test period Each structure is critical and operation must be synchronized to achieve results Measured flows agreed with estimated Confirmed that if replacement water is available, structures can be operated to deliver flow Confirmed 150 cfs at control 2, but only 35 cfs at E. perimeter canal G-161 operated to deliver 100 cfs to C-18 Flow to NWFLR exceeded 100 cfs during test period Each structure is critical and operation must be synchronized to achieve results Measured flows agreed with estimated

15 G-92 Structure Replacement

16 G-92 Structure Proposed Design & Location  New in-kind (single barrel, box culvert) will be installed to maintain flood protection and conveyance  Located adjacent to existing structure  Existing structure to be demolished  New in-kind (single barrel, box culvert) will be installed to maintain flood protection and conveyance  Located adjacent to existing structure  Existing structure to be demolished

17 G-92 Structure Background  Structure supplies water from the C-18 canal to the Loxahatchee River via the South Indian River Drainage District canal C-14  Erosion and structure deterioration has limited structure capacity  Failure of the existing structure became critical during 2004 hurricane season  Structure supplies water from the C-18 canal to the Loxahatchee River via the South Indian River Drainage District canal C-14  Erosion and structure deterioration has limited structure capacity  Failure of the existing structure became critical during 2004 hurricane season

18 G-92 Structure Benefits of New Structure Reliability Extended service life Remote operation Public safety Flood protection Water delivery Reliability Extended service life Remote operation Public safety Flood protection Water delivery

19 G-92 Structure Operation New structure will not deviate from existing operational criteria. Remote operation through telemetry New structure will not deviate from existing operational criteria. Remote operation through telemetry

20 G-92 Structure Replacement Schedule Bid opening scheduled for September 29, 2008 at 2:30 p.m. Construction start – late November to early December 2008 Construction time frame - 300 days Bid opening scheduled for September 29, 2008 at 2:30 p.m. Construction start – late November to early December 2008 Construction time frame - 300 days