Presentation is loading. Please wait.

Presentation is loading. Please wait.

EAST-ADL Domain-Model – Overview and Planning – Mark-Oliver Reiser (TUB) AMST Workshop Berlin, 24.-25.09.2012.

Similar presentations


Presentation on theme: "EAST-ADL Domain-Model – Overview and Planning – Mark-Oliver Reiser (TUB) AMST Workshop Berlin, 24.-25.09.2012."— Presentation transcript:

1 EAST-ADL Domain-Model – Overview and Planning – Mark-Oliver Reiser (TUB) AMST Workshop Berlin, 24.-25.09.2012

2 Content EAST-ADL Overview (key characteristics) Domain Model  Basic Structure  Core  Extensions Plans for Evolution & Versioning  EAST-ADL Association  Challenge: evolution and versioning!  Plans for next ~12 months, Version 2.1.11 How to contribute... 2

3 3 EAST-ADL Overview

4 Comprehensive Approach 4

5 Early Development Phases Analysis on two levels:  features  structural functional analysis Design  corresponds to other standards with early development coverage:  e.g. ISO26262 with Functional Safety Concept 5

6 Abstraction Layers 6 Features of the vehicle Vehicle Level Analysis Level Design Level Implementation Level Abstract functions Hardware topology, concrete functions, allocation to nodes Software Architecture as represented by AUTOSAR

7 7 Domain Model

8 Definition 8 EAST-ADL Domain Model = model in EnterpriseArchitect EAST-ADL Specification = textual description in Word UML2 Profile EAXML XSD Tool Implementations...

9 Structure 9

10 10 Core vs. Extensions. Extensions only point to Core and other extensions! Common principle for all extensions: 1 Extension Container + n supplmenetary elements.

11 Core 11

12 12 Planning

13 EAST-ADL Association before:  various research projects used & evolved EAST-ADL  ad-hoc synchronization now: EAST-ADL Association... 1.to coordinate efforts (not to do main actual work) 2.single point of entry for information 13 info@east-adl.info feedback@east-adl.info

14 Challenge! 14 new EAST-ADL Version EAST-ADL Model

15 Solution upcoming version 2.1.11 (or 2.2 ??)  stable release  intended for use for next 12-18 months  planned for end of Nov/Dec 2012 later changes:  take evolution into account  document how to translate to new version 15

16 Change „Process“ 16 Add new information as User Attributes. Define UML2 Profile based on EAST-ADL Profile. Modify tool-based EAST-ADL implementation (eg. MetaEdit+). Updated / Added Extension in domain model. Updated Core.

17 How to Contribute... 17 TODO


Download ppt "EAST-ADL Domain-Model – Overview and Planning – Mark-Oliver Reiser (TUB) AMST Workshop Berlin, 24.-25.09.2012."

Similar presentations


Ads by Google