Presentation is loading. Please wait.

Presentation is loading. Please wait.

Visit Gangway FromLHBIEP__0181 by Andre Coin ~ 2600 GANGWAY POSITION.

Similar presentations


Presentation on theme: "Visit Gangway FromLHBIEP__0181 by Andre Coin ~ 2600 GANGWAY POSITION."— Presentation transcript:

1 Visit Gangway Juan.herranz.alvarez@cern.ch17/09/08 FromLHBIEP__0181 by Andre Coin ~ 2600 GANGWAY POSITION

2 Visit Gangway Juan.herranz.alvarez@cern.ch17/09/08 FromLHBIEP__0181 by Andre Coin GANGWAY POSITION

3 Visit Gangway Juan.herranz.alvarez@cern.ch17/09/08 INSTALLATION PROCEDURE The following list shows the proposed installation procedure, tools, access devices and timing once the gangway and stairs have been upgraded and the supports manufactured. 1.- Draw the supports positions in the wall using a lifting platform and an optical level by two persons. 2 hours. 2.- Drilling top anchors holes for each support using a lifting platform, drilling machine and vacuum machine, works must be done by two persons. 2 hours. 3.- Pre-installation and alignment supports, supports will be lift up by the cavern crane, access to the anchors will be done by lifting platform, works to be done by 2 persons plus 2 crane drivers. 4 hours. 4.- Once the supports alignment drilling bottom holes and anchoring each support, access by the lifting platform, 2 persons. 2 hours. 5.- Lift up the gangway by the cavern crane and placing it over the supports, adjustment tasks and bolted operation access by the lifting platform, 2 persons plus two crane drivers. 8 hours. 6.- Once the gangway is properly bolted to the wall supports lift up the stairs by the caver crane and bolted to the gangway access by the lifting platform, 2 persons plus two crane drivers. 8 hours. The works for the gangway and stairs upgrade as add cross beams, barriers modification and painting will be done in surface, works could be done by 2 persons and some supports from 2 crane drivers during the handling operations. 24 hours.

4 Visit Gangway Juan.herranz.alvarez@cern.ch17/09/08 INSTALLATION SCHEDULE The following table shows a first proposal for manufacturing, upgrade and installation for the new Gangway. Supports manufacturing:2 days in August or September Gangway and stairs upgrade:3 days in August or September Installation in the cavern:3 days in September or October * (*) Dates should be decided in agreement with the LHC shutdowns and other LHCb works.

5 Visit Gangway Juan.herranz.alvarez@cern.ch17/09/08 MORE INFO

6 Visit Gangway Juan.herranz.alvarez@cern.ch17/09/08 MORE INFO CATIA Engineering Drawing Performed by Andre COIN


Download ppt "Visit Gangway FromLHBIEP__0181 by Andre Coin ~ 2600 GANGWAY POSITION."

Similar presentations


Ads by Google