Download presentation
Presentation is loading. Please wait.
Published byJasper Hardy Modified over 9 years ago
1
Fermilab and Muons Booster, Proton Driver (MECO, PRISM/PRIME, …) David Neuffer Fermilab
2
2 Outline Fermilab: Protons and Muons Present Proton source: Booster Future Source : Proton Driver Possible configurations, intensities
3
3 Present Proton Source: 8 GeV Booster NOW: 400 MeV Linac 8 GeV Booster (C=454m) produces 80 bunches (53 MHz) Currently Limited by losses in Booster 5Hz, ~ 3 10 12 / pulse: ~1.5×10 20 p/year (0.02MW) 15Hz, 5 10 12 /pulse possible (0.1MW) (6 10 13 protons/s) NUMI, MiniBOONE, Tevatron p- source Tevatron, MiniBOONE will be completed… Capacity for other experiments … But 15Hz cycle limits applications Linac – 400MeV Booster – 8 GeV Main Injector, MiniBOONE
4
4 Proton Driver and Muon beams 8GeV Linac can produce streams of 1.5×10 14 8GeV protons at up to 10Hz > 10 22 protons/year Neutrino Physics: main goal But: Only 1/15 of these needed for Main Injector/NUMI Are there muon beam experiments that could use this intensity ?? Tertiary muon beams: P + X → π π → μ + ν 10 -1 μ/p → 10 21 μ/year or more (other experiments will also be possible)
5
5 Primary Parameter List (Foster, March 2005 reference)
6
6 Proton Driver Parameters 8 GeV Superconducting LINAC EnergyGeV8 Particle Type H- Ions, Protons, or Electrons Rep. RateHz2.5 to 10 Active Lengthm671 Beam CurrentmA25 Pulse Lengthmsec3 to 1 Beam IntensityP / pulse1.5E+14 (can also be H-, P, or e-) P/s1.5E+15 Linac Beam PowerMW avg.0.5 to 2 MW peak200 MAIN INJECTOR WITH 8 GeV LINAC MI Beam EnergyGeV120 MI Beam PowerMW2.0 MI Cycle Timesec1.5 filling time = 1msec MI Protons/cycle1.5E+14 5x design MI Protons/hrP / hr3.6E+17 H-minus Injectionturns90 MI Beam CurrentmA2250
7
7 Detailed source design does not exist Straw man design worked out for the front end of a factory, supported by MARS simulations (Brice, Geer, Paul, Taylor, Fermilab-Conf-04-196-E) Target + capture solenoid + drift (forward capture) 1.5 x 10 22 protons/year at 8 GeV yields ~3 x 10 21 muons/year. Charged particle spectra at end of decay channel Generic High intensity muon beam ~0.2 µ/p
8
8 LFV: A e A can use high intensity ExperimentI 0 /I m T [ns] T [ s] p [MeV] p /p A e A e eee e e 10 21 10 17 10 16 < 10 -10 n/a < 10 -4 < 100 n/a < 1000 > 1 n/a > 20 < 80 < 30 < 5 < 10 1…2 10 14 < 10 -4 100> 2030< 10 g -2 EDM 10 15 10 16 < 10 -7 < 10 -6 < 50 > 10 3 3100 <1000 < 2 Desirable Beam Characteristics But bunched beam is needed
9
9 MECO expt. (BNL-based proposal) Superconducting Production Solenoid (5.0 T – 2.5 T) Muon Stopping Target Muon Beam Stop Crystal Calorimeter Superconducting Transport Solenoid (2.5 T – 2.1 T) Superconducting Detector Solenoid (2.0 T – 1.0 T) Collimators Tracker Time structure
10
10 PRISM-PRIME (Y. Kuno et al.) High intensity pulsed proton beam (bunch length <10ns) 100-1000Hz bunches producing π —> μ bunches Phase rotation with rf field: Δp/p : ±20% ± 2% P = 68 MeV/c ±20%
11
11 Proton Beam requirements MECO experiment Requires pulses of ~8 GeV protons (<30ns long) every ~1μs (1.4μs) –Obtained by slow extraction of short bunches (in AGS) Design requires 4 10 13 p/s, 2 10 -3 captured μ’s/proton 10 5 μ/pulse (~5 10 7 p/pulse) ~8 10 17 μ/year from ~4 10 20 p/year PRISM-PRIME experiment Requires proton pulses (<10ns long) at 10 3 /s (~1ms) –4 10 14 p/s (50GeV) 10 -2 to 10 -3 μ’s/proton –Up to 10 22 p/year, > 10 19 μ/year Single-turn extraction of short bunches (<10ns) Up to 4 10 9 μ/pulse (~ 10 12 p/pulse) Both require pulsed beams, proton linac beam must be repackaged in an accumulator ring
12
12 Recycler as accumulator ring ? 8GeV Linac produces 1ms pulses at 10 Hz H - injection into Recycler 1ms fills circumference –(100 turns) Bunch beam into pattern required for expt. Harmonic 10 buncher for MECO, slow extraction Harmonic 100 buncher for PRIME, single bunch extraction CircumferenceC=2πR ave 3320m MomentumP8.89 GeV/c Rev. frequency, Period f0T0f0T0 89.8 kHz 11 μs Slip factorη=1/γ 2 - 1/γ t 2 0.0085 Tunesν x, ν y 25.4,24.4 But: Recycler circumference is large 100ms may be too short a time for bunching
13
13 Space Charge Difficulty Space Charge tune shift: Parameters: N tot =1.5 10 14,ε N =20π mm-mrad MECO: 30ns/1μs : B F = 0.03 → δν = 4 : too large Reduce N to 1.5 10 13 → δν = 0.4 PRISM/PRIME 10ns bunches, 100/ring B F = 0.1 → δν =1.2: too large (but closer) Use larger ε N, smaller N tot, N tot 1 10 14 OK Smaller circumference proton ring could be better
14
14 Recycler – Bunching for ~MECO Harmonic 10 buncher (0.9MHz) Barrierbucket rf Bunch for ~1s (V rf ramps to ~30kV) Bunch lengths reduced to ~50ns rms (MECO wants ~30ns full width.) Could then extract bunches in slow extraction over ~1s OK for 10 13 protons/s
15
15 Recycler – Bunching (~for PRISM) Harmonic 100 buncher (9MHz) Bunch for 0.1s (V rf ramps to 140kV) Bunch lengths reduced to ~5ns rms (Prism wants < 10ns full width.) Could then extract bunches one at a time over ~0.1s Uses 1/2 the possible linac pulses (500 bunches/s for PRISM) (100 at 5Hz) ~5 10 14 p/s possible
16
16 Other potential proton storage schemes Accumulator or Debuncher (C= ~454m) after 2010… Large aperture machines t 5 Difficult to inject H - (must bend beam from Linac) (B ~600m) Could take debunched protons from Recycler or Main Injector(in ~450m chunks) Bunch into pattern needed for experiments Bunching easier than Recycler New 8 GeV Storage Ring ??
17
17 New 8 GeV Accumulator/buncher/stretcher FFAG Type: FODO racetrack, Superferric arcs nonscaling H - injection into NewRing (10Hz) 700 turns δν = 0.4 at B F =0.15 (σ=1.5ns) Harmonic 42 buncher for PRISM, single bunch extraction (40ns spacing) Slow extraction, single bunch extraction modes CircumferenceC=2πR ave ~454m MomentumP8.89 GeV/c rf frequency, Voltage h=42 V 0 26 MHz 1MV Slip factorη=1/γ 2 - 1/γ t 2 -0.02 Tunesν x, ν y 6, 8 aperturea, b~3,2cm
18
18 Proton Linac (H - ) NewRing (P)
19
19 Fermilab – w/o SRF linac proton driver Upgrade: Linac 8 GeV Booster From 5Hz ~ 3 10 12 / pulse 15Hz, 5 10 12 /pulse possible (0.1MW) (6 10 13 protons/s) Single turn extraction is 1.5 s onto production target (~ MiniBOONE), then e target Adapt to e conversion experiment Not very well suited to ~1 s µ-decay Most ’s decay before end of injection pulse ~1/3 of full pulse probably useful CircumferenceC=2πR ave ~454m MomentumP8.89 GeV/c rf frequencyh=8453 MHz Slip factorη=1/γ 2 - 1/γ t 2 -0.022 Tunesν x, ν y 6.6, 6.8 aperturea, b~3,2cm
20
20 Fermilab - Beam from Booster For pulsed experiments, need a storage ring Could use Accumulator, Debuncher (450m circ.)? Scenario: Transfer into ring, bunch, extract short bunches onto targets ~80bunches, 15 Hz = 1200Hz (~PRISM) (6×10 10 p/bunch) For ~MECO, bunch into single bunch? (<100ns out of 1.5µs) –Slow extraction Possible Long-term Future: New 8 GeV Booster With 1 GeV linac ?? larger apertures, larger injection energies, deeper tunnel (5 10 13 / pulse ??) (1MW ??) With new storage ring
21
21 Summary Muon Beams at Fermilab could be developed Potential muon beam facilities could be constructed ~MECO or PRISM, etc. … could be hosted More Detailed design needed Proton Collection –Recycler …. –New Stretcher/Buncher ring ?? Beam line(s) Experimental area(s)
22
22 References W. Foster et al., Proton Driver http://tdserver1.fnal.gov/project/8GeVLinac/DesignStudy/ W. Molson, “The MECO Experiment to Search for - N e - N with 10 -17 Sensitivity”, U. Va. Seminar, June 2004 ‘RSVP’ Rare Symmetry Violating Processes (MECO- KOPIO) NSF proposal, October 1999. PRISM Working group “An Experimental Search for the μ − −e − Conversion Process at an Ultimate Sensitivity of the Order of 10 −18 with PRISM”, The Prime Working Group, Jan. 1, 2003. R. Ray & D. Roberts, Proton Driver physics study
23
23 PRISM rf-rotation P = 68 MeV/c ±20% t = ±12ns (5ns rms) PµPµ p=±1.9% p=±3.4% 5-turns, 38% beam decay6-turns, 44% decay
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.