HAH 2007/05/09 Connecting LOFAR to the GRID Hanno Holties, ASTRON IVOA - OGF Astro-RG Work Shop Manchester, 9th May 2007.

Similar presentations


Presentation on theme: "HAH 2007/05/09 Connecting LOFAR to the GRID Hanno Holties, ASTRON IVOA - OGF Astro-RG Work Shop Manchester, 9th May 2007."— Presentation transcript:

1 HAH 2007/05/09 Connecting LOFAR to the GRID Hanno Holties, ASTRON IVOA - OGF Astro-RG Work Shop Manchester, 9th May 2007

2 HAH 2007/05/09

3

4 First result: 96 LBA antennas Upto 400 m apart Dynamic range: ~1000:1 Cas A (strongest source) removed from image

5 HAH 2007/05/09 LOFAR operational model

6 HAH 2007/05/09 LOFAR Central systems Process ‘raw’ data Calibration Reduce in size Temporary Storage Raw data: 5 days Processed dataproducts: 1 month Push data to users Science centers subscribe & publish storage location LOFAR scheduler initiates …or interactive

7 HAH 2007/05/09 The LOFAR Network & GRID 700 Gbps dedicated fibre 2 Gbps lightpaths 20 Gbps lightpaths GRID Computing centers Science centers LOFAR instrument (Dutch part) International LOFAR stations Science center with local storage

8 HAH 2007/05/09 GRID utilization Long term storage In general at computing center Searchable database Data mining Virtual Observatory Offline processing Reprocessing Source extraction Differencing (search for variable or new sources)

9 HAH 2007/05/09 Storage requirements Required storage capacity depends on Datatype (timeseries, visibilities, images) Number of stations involved Required time, frequency, and spatial resolution Prognosis 1.8 PB/Yr

10 HAH 2007/05/09 Processing requirements In process of being defined Applications still being developed GRID awareness of scientists just starting Proximity to, and available bandwidth for, storage IO limited Operate on Multi-Terabyte datasets Mostly embarrassingly parallel Environment Application requirements HPC tuning requires system details Shield from scientist

11 HAH 2007/05/09 Where are we? Working group LOFAR & GRID Meets on monthly basis Users, RCG, SARA, NIKHEF, ASTRON/LOFAR EGEE Tutorial before the summer LOFAR VO (in GRID context) Group for each KSP (to become per science center) Resources at SARA; RCG to follow shortly Glite TAR-UI installed on storage frontend Some groups have started to get their feet wet Kapteyn Institute UvA Transients group

12 HAH 2007/05/09 eLOFAR: The extended LOFAR Interest from international partners in: Germany (www.lofar.de)www.lofar.de UK (www.lofar-uk.org)www.lofar-uk.org France Sweden Italy Poland Aiming to extend LOFAR with: International stations Science Centers. Computing centers

13 HAH 2007/05/09 LOFAR challenges for GRID Storage 20 Gbps sustainable bandwidth Multi-Petabyte growth per year Interactive databases Processing Operate on Multi-TB datasets Applications with varying requirements Usability Reliable facilities Technical details shielded from (general) user