Download presentation
Presentation is loading. Please wait.
Published byWilliam Sutton Modified over 9 years ago
1
6 June 2002Andrea Bressan University-INFN Trieste1 COMPASS RICH-1 on behalf of the COMPASS RICH Group
2
6 June 2002Andrea Bressan University-INFN Trieste2 Plan of the talk COMPASS for pedestrians Rich-1 Parameters Detector Components Radiator Mirrors Quartz Windows Photon-Detectors Front-End electronics Performances in 2001-Run Conclusions and outlook
3
6 June 2002Andrea Bressan University-INFN Trieste3 COMPASS Program Nucleon structure Gluon polarization G(x) Flavour-dependent helicity functions q(x) Transverse-spin distribution functions T q(x) Spin-dependent fragmentation ( D q ) Spectroscopy Primakov reactions Polarizability of and K Glueballs and hybrids Charmed mesons and baryons Semileptonic decays HQET Observe double-charmed baryons
4
6 June 2002Andrea Bressan University-INFN Trieste4 G Measurements Single out g fusion graphs –Heavy quark lines (cc) –High transverse momentum Experimentally: –DIS + D 0 (e.g. via + +K - ) –DIS + D * ( +D 0 ) –DIS with high Pt hadrons Asymmetries measure G –A D A N ~ D A g G/G g N(p) hadrons
5
6 June 2002Andrea Bressan University-INFN Trieste5 Polarized beams and polarized nucleon targets hadron beams (up to 300 GeV energy) Particle identification Complex apparatus to allow a wide range of measurements High-rate capabilities Large dynamical range (angles and momenta) COMPASS Experiment
6
6 June 2002Andrea Bressan University-INFN Trieste6 2001 Apparatus Spectrometer Magnet 1 +tracking Spectrometer Magnet 2 RICH1 Polarised Target Calorimetry-1 Calorimetry Muon Wall SPS 160 GeV beam
7
6 June 2002Andrea Bressan University-INFN Trieste7 RICH-1 Parameters Main requests from the experiment: 1. /K separation up to ~ 60 GeV/c 2.Large angular acceptance: 250mrad 200mrad (V) 3.Minimize materials Design: Radiator: C 4 F 10, length: ~ 3m Mirrors: Spherical, focal length 3.3 m Reflectance > 80% for > 165nm Total surface Photon detectors: MWPC’s with CsI photocathodes, out of acceptance / total surface 5.3 m 2 Read-out electronics: Analog read-out/ 83 K channels average occupancy 5% max data rate 2.5 Gb/sec in spill Material Budget: Total22.5% of X 0 Mirrors 5.5% Radiator 10.5%
8
6 June 2002Andrea Bressan University-INFN Trieste8 Measured Parameters Contribution to n
9
6 June 2002Andrea Bressan University-INFN Trieste9 VESSEL O2O2 H2OH2O Excellent Gas Tightness of the Vessel 10 ppm Contamination of O 2 at 4m 3 /h 0.2 l/h at 1 mbar overpressure
10
6 June 2002Andrea Bressan University-INFN Trieste10 2001 Mirror Mounting Dedicated talk: S. Costa, ”The mirror system of COMPASS RICH-1”
11
6 June 2002Andrea Bressan University-INFN Trieste11 Mirror Wall-Checks —reflectance of 2 test mirrors measured after 2 year in RICH-1 vessel: —No degradation above 165 nm mirror n. 2 mirror n. 5 wave length reflectivity reflectivity 2000 2001 2002 2000 = immediately after coating 2000 2002 2001
12
6 June 2002Andrea Bressan University-INFN Trieste12 C 4 F 10 Gas RADIATOR pre-cleaning material loss: ~7% C 4 F 10 pre-cleaning (in liquid phase) and on-line monitoring of VUV light transmission measured through 5 cm of liquid (~ 7 m of gas, 1 bar) scaled to 5 m of gas (mean photon path in vessel) In 2001 radiator gas was a mixture C 4 F 10 : N 2 = 50 : 50 pre-cleaning material loss: up to 50% Dedicated talk: P. Fauland, ”The radiator gas and the gas system of COMPASS RICH-1”
13
6 June 2002Andrea Bressan University-INFN Trieste13 RADIATOR GAS, 2002 MATERIAL new C 4 F 10 delivery, 570 Kg better quality, polluting contamination: mainly water new pre-cleaning installation: cleaning in gas phase raw material
14
6 June 2002Andrea Bressan University-INFN Trieste14 Photon Detectors Basic Design from RD26
15
6 June 2002Andrea Bressan University-INFN Trieste15 Quartz Window
16
6 June 2002Andrea Bressan University-INFN Trieste16 Problems with PDs PDs electrical instability at high beam rate (6 over 8 PDs operated at 100-150 V lower than the 2100 V nominal HV) Actions taken: hunting the technical problem: local wire defects 4 refurbished wire planes 2 new wire planes (wire LUMAMETALL OSRAM) Status: PDs mounted again on RICH-1 vessel wire defect, diameter 20 m Setup for anode wire alignment and soldering Detected Spark
17
6 June 2002Andrea Bressan University-INFN Trieste17 Photon Detector Mounting CsI Deposit on PCB PCB Transport System PCB Transport System PCB Mounting Photon Detector Mounting Final Installation
18
6 June 2002Andrea Bressan University-INFN Trieste18 RICH-1 – READ-OUT analogic read-out system, 84,000 channels with local intelligence (DSP, FPGA in FE BORA board) working dead time: limited to 500 ns / event up to trigger rates of 75 KHz average noise level: ~ 2000 e -, non homogeneous (2001) reinforced ground lines (2002), noise level: ~ 1100 e - Front End BORA boards mounted on photon detector PC resident control board DOLINA Dedicated talk: M.L. Crespo, ”The COMPASS RICH-1 Read-Out System”
19
6 June 2002Andrea Bressan University-INFN Trieste19 Noise Reduction Sigma Run 2001 =2100 e - Run 2002 =1100 e - Noise sigma for each pad 2001 Run The shape of the PCB support Is reproduced Noise sigma for each pad 2002 Run The shape of the PCB support Absent
20
6 June 2002Andrea Bressan University-INFN Trieste20 2001 Data Analysis Abrided from the Dedicated Poster: P. Schiavon et al, ”RICHONE: a software package for the reduction of COMPASS RICH-1 data”
21
6 June 2002Andrea Bressan University-INFN Trieste21 Integrated EVENTS Photon detector (Up) Photon detector (Down) Beam halo
22
6 June 2002Andrea Bressan University-INFN Trieste22 Reconstructed RING “Ring event” The cross indicates the track “image ” The blue dots are the pads The black dots are the selected clusters
23
6 June 2002Andrea Bressan University-INFN Trieste23 Cherenkov ANGLE (a)Cherenkov angle of photons of the Rich (b)Cherenkov angle of the ring for > 60 GeV particles Superimposed (yellow) out of time signals ring all photons (b)(a)
24
6 June 2002Andrea Bressan University-INFN Trieste24 (a)Cherenkov angle of Reconstructed Ring (b)Number of Photons of the Reconstructed Ring Superimposed (yellow) out of time signals Number of Photons photns ring 11.7 photons13.0 photons all (a)(b)
25
6 June 2002Andrea Bressan University-INFN Trieste25 Conclusions and Outlook 2001 Run: –All important staffs on the floor –50% of Radiator Gas in –Front End electronics working satisfactory –Noise figure higher than expected –Electrical Instabilities from PDs 2002 Run: New Staffs –Cooling system for the front-end electronics –Fast Radiator Gas mixing in the vessel –Improved noise –Refurbished and rewired PDs –Full radiator GAS 2002 Run: Still Missing Staffs –Vessel thermalisation
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.