Report of co-conveners WG1/WG2 meetings between TP1 and TP2 Group Name: Technical Plenary #2 Source: Omar Elloumi, Alcatel-Lucent, omar.elloumi@alcatel-lucent.comomar.elloumi@alcatel-lucent.com Laurent Laporte, Sprint, laurent.laporte@sprint.com Meeting Date: 2012-12-10 Agenda Item: 7.2
2
Summary Working Groups 1 and 2 met jointly in the period between TP#1 and TP#2 – Fourteen meetings over eight weeks – Twenty eight hours of meeting time Work aimed at progressing three TRs – Benefits of oneM2M technology – Use Cases: a set of contributions are prepared for further consideration at TP2 WG1 meeting and possible inclusion in the draft TR – Architecture Review: two WG agreed contributions included in the draft TR Discussion around requirements based on several contributions © 2012 oneM2M Partners 2
3
Detailed report
4
Interim arrangements for document submission deadline Rationale: need to adapt document submission deadline to fit the tight schedule of the conference calls Document submission deadline is set for Friday 23:59 UTC for the conference calls taking place the week after Co-conveners suggested to utilise the discretion provided in Article 23 of the WPD to suggest that we operate with a slightly modified document contribution deadline until otherwise determined by the co-convened working group and only to apply in the interim period between TP#1 and TP#2. oneM2M-REQ-2012-0015R02: http://member.onem2m.org/Application/documentapp/dow nloadimmediate/default.aspx?docID=296 http://member.onem2m.org/Application/documentapp/dow nloadimmediate/default.aspx?docID=296
5
Working assumption A working assumption (based on 3GPP TS 21.801) for the use of normative and non normative verbs has been made to allow guiding contributions This working assumption is captured in the following contribution: oneM2M-REQ-2012-0044R01 http://member.onem2m.org/Application/documenta pp/downloadimmediate/default.aspx?docID=378 http://member.onem2m.org/Application/documenta pp/downloadimmediate/default.aspx?docID=378 Further guidance will need to be provided by the Steering Committee/Technical Plenary ad-hoc group per decision in Steering Committee meeting #4
6
Benefits of oneM2M TR “Benefits of oneM2M Technology” was decided to be transferred to the Steering Committee Marketing Group – Several iterations of the document have been presented/discussed. The technical content of this document is well progressed and will be presented at TP#2 for further feedback before a transfer to the SC oneM2M-REQ-2012-0019R09 : http://member.onem2m.org/Application/docume ntapp/downloadLatestRevision/?docId=434 http://member.onem2m.org/Application/docume ntapp/downloadLatestRevision/?docId=434 – The decision point for this transfer was the use of the words “cost” and “price” in the elucidation of motivating/compelling factors for utilizing oneM2M standards – Participants were uncomfortable with a technical working group utilizing these terms © 2012 oneM2M Partners 6
7
Use Case TR related contributions Discussed iterations of the following documents : – oneM2M-REQ-2012-0036R06 : Street light automation – oneM2M-REQ-2012-0030R3 : Smart grid – oneM2M-REQ-2012-0058 : Home energy management – oneM2M-REQ-2012-0059 : Plug-in electric vehicle – oneM2M-REQ-2012-0057: Healthcare gateway All above contributions are proposed for Beijing WG1 further discussion and agreement © 2012 oneM2M Partners 7
8
Architecture Part I TR Agreed to incorporate the following contributions into an annex of TR as per oneM2M-ARC-2012-0003 : – oneM2M-REQ-2012-0042R02: TIA architecture – oneM2M-REQ-2012-0037R01: ETSI architecture Discussed the following document: – oneM2M-REQ-2012-0053R01: security and device management for ETSI architecture – A revision of oneM2M-REQ-2012-0053R01 is expected for Beijing WG2 for further discussion and agreement Discussed oneM2M-ARC-2012-0002R01 which provides status of specification work in the SDOs Participants suggested the need to reassess the timelines for this TR (and possibly other related ones) © 2012 oneM2M Partners 8
9
Items for Decision TP to a agree to the working assumptions as per oneM2M-REQ-2012-0044R01 http://member.onem2m.org/Application/doc umentapp/downloadimmediate/default.aspx? docID=378 until a decision is made by the SC/TP http://member.onem2m.org/Application/doc umentapp/downloadimmediate/default.aspx? docID=378 © 2012 oneM2M Partners 9