Download presentation
Presentation is loading. Please wait.
Published byHarold Marsh Modified over 9 years ago
1
1 Long Term Monitoring JPSS Algorithm Team Presented by Date
2
2 OUTLINE Products (1 slide) Algorithm Cal/Val Timeline (1 slide) Monitoring Methods/Strategies (1-2 slides) Monitoring Tools (4-5 slides) Resources (1 slide) Further Enhancements and Schedules (1-2 slides) Summary (1 slide)
3
Products Provide a list of products and their specifications (spatial and temporal resolution, coverage). 3
4
Algorithm Cal/Val Timeline Four Phases of Cal/Val: 1.Pre-Launch; all time prior to launch – Algorithm verification, sensor testing, and validation preparation 2.Early Orbit Check-out (EOC) – System Calibration & Characterization 3.Intensive Cal/Val (ICV) – Algorithm Calibration & Validation 4.Long-Term Monitoring (LTM); through life of sensors after ICV (Validated) – Sensor Stability & Data Product Quality monitoring Algorithm Cal/Val Timeline 4 LTM Pre_Launch EOCICV Launch BetaProvisionalValidated
5
Monitoring Methods/Strategies Highlight/summarize monitoring methods/strategy of your products Identify monitoring tools that are needed and being developed 5
6
Monitoring Tools Describe and illustrate the monitoring tools that your team have or are developing Address the following: – Capabilities (in their final state) – Web-based/offline applications – Data Source, where/how these are obtained – Visualization software tools used for monitoring – Product performance measures – NRT monitoring capabilities 6
7
What computer resource are you using? Dependencies on data input Risk related to monitoring & mitigation External contributors 7 Resources
8
Planned further improvements/enhancements Planned LTM activities / milestones 8 Further Enhancements and Schedules
9
9 Summary
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.