Download presentation
Presentation is loading. Please wait.
Published byChristiana Watkins Modified over 9 years ago
1
SDSM&T Bookstore Web Order Space Fall Term 2011
2
Current Facility Actual Use: – Online order fulfillment (& everything else) Strategy/Goals: – Two-three day turnaround – Just-in-time order fulfillment – Flexible & safe space! Actual Use: – Online order fulfillment (& everything else) Strategy/Goals: – Two-three day turnaround – Just-in-time order fulfillment – Flexible & safe space!
3
Safety & Security Personnel Safety & Personal Property Security: – Safe/more efficient way to enter/exit receiving area – Safer roof access ladder area – Enhanced lighting – Employee personal space (coats/bags) Product & Equipment Safety: – Efficient storage for perishables/beverages (space and processing) – Equipment storage – cart, ladder, step stool, sign holder, plotter, hanger organizer – Packing material handling Personnel Safety & Personal Property Security: – Safe/more efficient way to enter/exit receiving area – Safer roof access ladder area – Enhanced lighting – Employee personal space (coats/bags) Product & Equipment Safety: – Efficient storage for perishables/beverages (space and processing) – Equipment storage – cart, ladder, step stool, sign holder, plotter, hanger organizer – Packing material handling
4
Efficiency & Flexibility of Use Areas to incorporate: – Better utilization of storage space – flexibility – Island-type workstation envisioned – Equipment storage area – Centralized Audio/Visual controls for displays – Bins for smaller inventory types – Well defined outgoing mail/packages area Reconfigurable space for: – Textbook reservation orders Mid-August to 1 st part of September Late-December to mid-January – Short term customer order storage Up to 7 days Areas to incorporate: – Better utilization of storage space – flexibility – Island-type workstation envisioned – Equipment storage area – Centralized Audio/Visual controls for displays – Bins for smaller inventory types – Well defined outgoing mail/packages area Reconfigurable space for: – Textbook reservation orders Mid-August to 1 st part of September Late-December to mid-January – Short term customer order storage Up to 7 days
5
Building Planning Rough floor plan is available – Verify accuracy with measurements Google Sketch-Up 3-D model is desired as part of project deliverables Equipment examples are available onsite Future development recommendations are desired – Increase of 50% in customers in short term – Interactions with adjacent areas – Cost estimates / prioritization desired Rough floor plan is available – Verify accuracy with measurements Google Sketch-Up 3-D model is desired as part of project deliverables Equipment examples are available onsite Future development recommendations are desired – Increase of 50% in customers in short term – Interactions with adjacent areas – Cost estimates / prioritization desired
6
Contact Information Marlin Kinzer4-2375 – Marlin.Kinzer@sdsmt.edu Bookstore Website: – http://www.sdsmtbookstore.com Marlin Kinzer4-2375 – Marlin.Kinzer@sdsmt.edu Bookstore Website: – http://www.sdsmtbookstore.com
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.