Download presentation
Presentation is loading. Please wait.
Published byDarcy Pierce Modified over 9 years ago
1
BAJA STATUS UPDATE November 9, 2011 FRAME & SUSPENSION Design Phase completed Analysis Phase 35% completed – Frame Design uploaded to PATRAN – Material Properties selected – Tubing Dimensions selected – Boundary Conditions established Upcoming Tasks – PATRAN FEA under multiple load cases
2
BAJA STATUS UPDATE November 9, 2011 GEARBOX Calculation Phase completed – Gears – Shafts – Bearings Design Phase 60% completed – Gear train design completed Upcoming Tasks – Packaging design in SolidWorks – SolidWorks FEA
3
GANTT CHART – 11/9/2011
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.