Company LOGO Introduction To An Example Project Prepared by: Alaa El Shorafa Munther Abdel-Hadi Ahmed El Zinati Shukri El Zaza Dr. Kamaleen Sha’th Supervision : Dr. Kamaleen Sha’th Prepared by: Alaa El Shorafa Munther Abdel-Hadi Ahmed El Zinati Shukri El Zaza Dr. Kamaleen Sha’th Supervision : Dr. Kamaleen Sha’th Chapter 4
2
Company LOGO Chapter 42 Introduction This chapter introduces an example practical implications of concepts and procedures described in the chapters that follow.
3
Company LOGO Chapter 43 Introduction Chapter Objective: 1.Technical description of the project and its life cycle. 2.Actual professional construction managment proposal followed by a copy of the procedure outline.
4
Company LOGO Chapter 44 3. Ways in which the owner may construct the project, including the use of a single general contractor, a design construct firm or a developer. 4. Alternate ways to provide for overall managment, contract administration and quality control. Introduction
5
Company LOGO Chapter 45 1-1 Project Technical Description The Easy way Food Company wants to build a new warehouse with 150,000 ft2 =13500m2 that will provide storage for grocery and non-food items. Objective 1
6
Company LOGO Chapter 46 The work included mainly: The concrete work The Steel works The required utilities Objective 1
7
Company LOGO Chapter 47 Objective 1
8
Company LOGO Chapter 48 1-2 Project Life Cycle A.Concept and feasibility study B.Engineering & Design C.Procurement D.Construction E.Start-up & Implementation Objective 1
9
Company LOGO Chapter 49 A. Concept & Feasibility Study In this phase the Design & Construction Dept. Based upon the requirement of the Operating Division did the following: Initial Feasibility study; Conceptual drawings Objective 1
10
Company LOGO Chapter 410 Alternate design-construct schedule Sequantial schedule (traditional approach), if time available 12 months or more. Phased schedule, if time only 10 months available for desgin & construction. Objective 1
11
Company LOGO Chapter 411 Sequantial schedule This mothed include : Plans and specifications prepared by local Arch. Constuction performed under a single lump-sum contract Barring changes after award The cost of project be fully known before constrcution begins Objective 1
12
Company LOGO Chapter 412 Objective 1
13
Company LOGO Chapter 413 Owner’ Options for the phased Schedule 1.Turnkey 2.Traditional with a negotiated construction contract 3.Professional construction management Objective 1
14
Company LOGO Chapter 414 Owner’s Selection The owner selected the professional construction approach based on the following: Capabilities of the firm in the area Easy way's own internal qualifications and objectives Objective 1
15
Company LOGO Chapter 415 B. Engineering & Design In this phase the CMC ( Construction Management & control, Inc.) Prepared procedure outline spelling out the relationship between the owner, architect and construction management Developed procurement schedule Finalized the bid packages Objective 1
16
Company LOGO Chapter 416 Developed CPM control schedule. Prepared fair-cost estimate. Set up the project control system. Objective 1
17
Company LOGO Chapter 417 Several value-engineering alternates were reviewed. Some of these alternate are chosen and included in the final plan a specification. Other included as alternate in the bidding documents to enable the contractors to determine the least costly solution. Objective 1
18
Company LOGO Chapter 418 C. Procurement In this approach CMC acting as an a gent to the owner. Procurement overlapped both design and construction. Objective 1
19
Company LOGO Chapter 419 For this project 10 contractors were chosen: Site earthwork Foundation & slab concrete Structural steel Pre-cast concrete walls Fire protection Plumbing, heating, Ventilating and air conditioning Electrical Roofing Special floors Building Finish Objective 1
20
Company LOGO Chapter 420 D. Construction This phase including Awarding the contract Appointed the required clerk typist Initial layout handled by surveyor Testing as the soil The A/E visit the work site frequently Contractor were directed through the job-site office Objective 1
21
Company LOGO Chapter 421 F. Start up& Implementation CMC responsible was lie on Makes the owner familiarize with operating equipment. Trouble shooting through the start up phase. Objective 1
22
Company LOGO Chapter 422 2-1 The Successful Proposal The owner requested proposal from two general contractors Technical & financial evaluation took place by the owner to choose one of them Objective 2
23
Company LOGO Chapter 423 The successful proposal consists the following items: A.A letter outlines the Proposed services and quotes a fixed fee for the home office services B.Preliminary schedule C.Estimate of construction management costs D.Project organization chart E.Preliminary CPM diagram Objective 2
24
Company LOGO Chapter 424 A. Proposed Serives: The proposal shows the CMC will provide the following services: 1.Prepare control schedule (showing bid package duration) 2.Develop bids packages 3.Prepare bidder list 4.Prepare cost estimate Objective 2
25
Company LOGO Chapter 425 5.Receive, review and evaluate bids 6.Manage, coordinate and inspect the work Coordination of the contracts Monitoring the schedule of individual phases Making recommendation for adjusting the work Preparing progress reports Objective 2
26
Company LOGO Chapter 426 Reviewing the progress payment Obtaining the required shop drawing and forwarding them to the A/E for approval Inspecting the quality of material and workmanship 7. Provide home-office support (Will be utilized on as required basis) Objective 2
27
Company LOGO Chapter 427 B. Preliminary Schedule Objective 2 Fig.(4-4)
28
Company LOGO Chapter 428 B. Preliminary Construction Cost Estimate Objective 2 Fig.(4-5)
29
Company LOGO Chapter 429 C. Estimate of Construction Management Costs Filed Cost Fixed fee ffice overhead profit Objective 2
30
Company LOGO Chapter 430 Objective 2 Fig.(4-6)
31
Company LOGO Chapter 431 Fig.(4-7) D. Project organization chart Objective 2
32
Company LOGO Chapter 432 Objective 2 Fig.(4-8) E. Preliminary CPM Schedule
33
Company LOGO Chapter 433 2-2 The Procedure Outline It illustrates the duties and responsibilities during planning, procurement and construction phases as follows: Objective 2
34
Company LOGO Chapter 434 2.2.1. General A.Purpose: establishing procedures for performance by professional construction management B.Names & Addresses of the Key Personnel Owner Construction Manager Architect C. Correspondence Objective 2
35
Company LOGO Chapter 435 D- Report to owner which includes: 1.Monthly progress report: this report covering significant phases of monthly activity. 2.Weekly field activity report: this report discuss weekly field activity. 3.Weekly force report: this report listing number of CM and contractor personal on the job. 4.Contract status report (monthly contact status report). Objective 2
36
Company LOGO Chapter 436 2.2.2. Relationships with architects and owner The following items are listed to clarify the relationships and responsibilities Special conditions and general conditions. Drawing and specifications Substitution policy Shop drawings Modification and changes Objective 2
37
Company LOGO Chapter 437 Building permit( the architect will contact the proper authorities to obtain the building permit. Surveying and testing laboratories Proposed bid package Approval bid list Approval bid document On site inspection Plan interpretation Objective 2
38
Company LOGO Chapter 438 2.2.3. Home office responsibilities CM will be responsible for the followings: Overall job schedule Fair cost estimates General home- office- supervision which include: Developing a detailed scope and bidding document Evaluate bids preparing recommendation to award the contract Monthly progress report Objective 2
39
Company LOGO Chapter 439 2.2.4. Field responsibilities The field construction manager responsibilities include but not limited to the following: Assist in evaluation of bids Manage, coordinate, and inspect al work performed by contracts. Administer and direct the testing lab and surveying contacts jointly with the architect Objective 2
40
Company LOGO Chapter 440 2.2.5.Reports and correspondence summary Objective 2
41
Company LOGO Chapter 441 Objective 3 Alternate way for Construction the Project Easy way can choose between : A. A cost-plus a fee B. Fixed Price C. Guaranteed maximum contract D. Design-Construct E.Developer
42
Company LOGO Chapter 442 3.A- Fixed Price Contract Separate contract would be negotiated with the A/E for completion the conceptual and detail design. Contractor will be selected in accordance with the procedure adopted by Esay way Co. The successful general contractor will usually plan to perform most of the work Objective 3
43
Company LOGO Chapter 443 3.B- Guaranteed Maximum Price Used when shortest schedule are economically imprtantant The owner supplies the contractor with the conceptual plans and specifications Objective 3
44
Company LOGO Chapter 444 A negotiated GMP is developed which often includes a fixed fee for home- office services and profit. Used when shortest schedule are economically imprtantant. The owner supplies the contractor with the conceptual plans and specifications. Objective 3
45
Company LOGO Chapter 445 3.C- Cost-Plus-Fixed Fee Used when the project scope is not fully developed and the overall minimum schedule is important. The contractor will reimburse the field cost and negotiated a fixed fee for home office cost and profit. Objective 3
46
Company LOGO Chapter 446 The owner has maximum opportunity to participate in the management of the project The owner assumed all of the price risk Objective 3
47
Company LOGO Chapter 447 3.D-Design-Construct Used when the initial project scope must be sufficiently clear so that both parties understand their responsibilities and risks A single firm provide both design and construction work Phased program used in order to achieve earliest completion Objective 3
48
Company LOGO Chapter 448 3.E- Developer Combine skills of construction manager, design contractor and real state investor The developer will normally own or control a parcel of land Easy way could also contract with a developer to build a warehouse based upon their design criteria Objective 3
49
Company LOGO Chapter 449 It would be then lease the facility for an extended period of time or to purchase In recent years developers has proven to be extremely marketing, cost conscious. Operationally many developer will hire contractors to manage the construction manager. The developer will be very active in performing value engineering studies, managing the design work. Objective 3
50
Company LOGO Chapter 450 Management, field administration, and quality control Many repeat owners have their own staff to provide these services. Others will delegate the responsibility to the architect, engineer, or to construction manager. Objective 4
51
Company LOGO Chapter 451 Summary The example project describes in this chapter establishes a common data base for estimates, schedule, reports, procedures and other tools.
52
Company LOGO Thank you