Download presentation
Presentation is loading. Please wait.
Published byKerry Davis Modified over 9 years ago
1
The B uff
2
The Buffs
3
Agenda 1. Recent iteration and job done 2. What we are doing now
4
I1 I2 E1 C1 C2 Current situation Inception Elaboration Construction
5
Job done on the Construction iteration 1 Request real test data from Ms.Izel Ms. Izel provided us with DOC files the President’s Weekly Letter – March issues for testing. Held a system demonstration with Ms. Izel We get a lot of constructive feedbacks Tradeoffs: She is requesting even more functionality! And we are suffering! Installing the application on a test server http://web4.cs.ait.ac.th/pwlp/ Implementing another 2 use cases(prototype, design, code, test) “Maintain task” and “Maintain PWL” Refine/Start a bunch of documents
6
Construction iteration 2 Gantt Chart
7
What are we doing now?(C2) Take user feedbacks into consideration Fixing things according to Ms. Izel’s feedback Finishing up rest of the use cases Currently, it’s almost done. Another complete system demonstration with Ms.Izel Around this coming Friday Running full optioned system test Test according to a test scenario check list (Vilachith, Patra, Aye Aye) automated test by chaky Reports, Reports, Reports Why not agile?
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.