Building Your LPFM Station Presented by John George
2
Your CP has arrived-What next? Review you construction budget Confirm tower location and locate a qualified tower crew to install your antenna Determine where you will purchase equipment Order equipment- Get delivery dates! Have a secure storage location for equipment as it arrives
5
Mounting the antenna on a support pole will improve your coverage 60" (152 cm) tower face: 36" (92 cm) min
6
Carefully wrap all connections with waterproofing tape carefully following the instructions from the manufacturer. Be sure to ground the transmission line properly to the tower in several locations
7
Examples of Installs Metal Pipe Wooden Pole
8
Use RG-6 cable to connect the antenna to the EAS receivers Properly ground your cable to a known ground. Consider using Polyphaser lightning protectors.
10
Some things that will bring your rack together neatly.
11
Don’t forget the rack screws Speakers to monitor your audio Rack mount power strips
12
Some things that will bring your rack together neatly. Properly terminated audio connectors If your budget permits, consider “Studio Hub” connectors for your rack interconnects
13
Only needed if you are using an external processor and composite I/O Some things that will bring your rack together neatly.
14
Questions? John George John.george@rfsouth.com 803.951.7443