Presentation is loading. Please wait.

Presentation is loading. Please wait.

1 Regional Integration Across Jurisdictions and Modes: San Diego IMTMS ITS America 2007 Annual Meeting Palm Springs, CA Session 9 - June 4, 2007.

Similar presentations


Presentation on theme: "1 Regional Integration Across Jurisdictions and Modes: San Diego IMTMS ITS America 2007 Annual Meeting Palm Springs, CA Session 9 - June 4, 2007."— Presentation transcript:

1 1 Regional Integration Across Jurisdictions and Modes: San Diego IMTMS ITS America 2007 Annual Meeting Palm Springs, CA Session 9 - June 4, 2007

2 2 IMTMS Project Stakeholders San Diego Association of Governments Caltrans District 11 California Highway Patrol City of San Diego San Diego Transit North County Transit District Plus 17 other San Diego Cities

3 3 What is IMTMS? CMS CCTV CMS CCTV VDS Caltrans ATMS Regional Arterial Management System (RAMS) CHP CAD Advanced Traveler Information System (ATIS) – San Diego 511 Transit Management & FSP/TMT Automatic Vehicle Loc. System Regional Network SANDAG project that is the foundation for center- to-center transportation information exchange throughout the San Diego Region. w Links the four primary transportation systems through a regional open systems network w Shares information with regional partner agencies via common web application and standard web services data interfaces.

4 4 IMTMS Data Providers - Freeways Caltrans District 11 ATMS w70 CCTV Cameras w33 DMS w1100 VDS w260 Ramp Meters

5 5 IMTMS Data Providers - Transit San Diego Transit, North County Transit wOrbital System w500+ buses tracked w200 bus lines

6 6 IMTMS Data Providers - Arterials Regional Arterial Management Systems (RAMS) wQuicNET/4 wCity of San Diego –1200+ Signals w2000+ Signals Countywide

7 7 IMTMS Data Providers - CHP w70-80 Incidents/day w35-40 injuries/day

8 8 IMTMS Three Tier Software Architecture

9 9 Three Tiers Tier 1 – Agency Tier wInterfaces to Level 1 Agencies wWeb Services for each Agency –Data in XML format –NTCIP2306/TMDD2.1 Tier 2 – Services Tier wTwo Layers –Internal Layer –External Layer wInternal Layer –Data cached in Memory –Data “Massaged” (GUI) wExternal Layer –Data “Massaged” (Agency Data Feeds) Tier 3 – Presentation Tier wServlet Layer –Real time Updates (Event, CMS, CCTV, Traffic, Bus,) –Map (Map Images are generated) wGUI Layer –Popup Windows for User Interfaces

10 10 IMTMS Network Baxall H.261 Encoders (~70) CCTV Cameras (~70) Axis 2400 MJPEG Encoders (4 channel) Baxall H.261 Decoders (~32-40) (4-channel) 8 Channels for 511 TMC Video Wall ATMS Workstations/ other Displays IMTMS Map Servers IAI Servers ISP/511 Server WWW/ VPN SANDAG Displays ATMS ADS RTMS/ CHP ADS TDB Server ATMS 2005 Servers ATMS CCTV Select & Control Commands T-1/T-3 SANDAG 511 Snapshot Server Axis 292 Decoder Regional Partners Caltrans D11 TOSNET- GB Ethernet Network

11 11 SANDAG 511 Conceptual Data Flow Model 6 ATIMS _________ IMTMS Agency Interface Server ATIS 511 --------------- Data Management & Information Production Services SANDAG 511 Business Services 1 2 4 5 3 XML 7 Baseline Services Adjacent Region & Adjacent States 511 Services 8 IMTMS NETWORK

12 12 IMTMS Agency Login Screen

13 13 IMTMS High Level Map

14 14 IMTMS Map CCTV viewing

15 15 IMTMS Speed and Incident Data

16 16 IMTMS Event Summary

17 17 IMTMS Event Detail

18 18 IMTMS RIWS Real-Time Bus Data

19 19 IMTMS RIWS Bus AVL Data Bus Locations

20 20 IMTMS RIWS Bus AVL Data Dialogs

21 21 IMTMS RIWS Event Creation Dialog

22 22 IMTMS RIWS CMS Control/Viewing

23 23 IMTMS RIWS CCTV Control/Viewing

24 24 Agency User - South Bay Expressway TMS State Route 125 w12.5-Miles from SR-905 to SR-54 w14 CCTV Cameras w2 Changeable message signs w31 Traffic Monitoring Stations

25 25 SANDAG Transportation Displays

26 26 Contact Information Dan Lukasik, P.E. Divisional Vice President Delcan Corporation E-mail: d.lukasik@delcan.comd.lukasik@delcan.com Phone: (714) 562-5725 Derek Pines, Project Manager Delcan Corporation E-mail: d.pines@delcan.comd.pines@delcan.com Phone: (714) 562 5725 Peter Thompson Project Manager – SANDAG E-mail: pth@sandag.orgpth@sandag.org Phone: (619) 699-4813 Dan Lukasik, P.E. Divisional Vice President Delcan Corporation E-mail: d.lukasik@delcan.comd.lukasik@delcan.com Phone: (714) 562-5725 Derek Pines, Project Manager Delcan Corporation E-mail: d.pines@delcan.comd.pines@delcan.com Phone: (714) 562 5725 Peter Thompson Project Manager – SANDAG E-mail: pth@sandag.orgpth@sandag.org Phone: (619) 699-4813


Download ppt "1 Regional Integration Across Jurisdictions and Modes: San Diego IMTMS ITS America 2007 Annual Meeting Palm Springs, CA Session 9 - June 4, 2007."

Similar presentations


Ads by Google