Download presentation
Presentation is loading. Please wait.
Published byJocelin Douglas Modified over 9 years ago
1
Interoperability event proposal Group Name: WG TST Source: Sookhyun Jeon, TTA, shjeon@tta.or.kr Laurent Velez, ETSI, laurent.velez@etsi.org Meeting Date: 2015-02-25
2
Goals Purpose: – Now oneM2M Rel-1 has been published, it is essential to validate the produced standards, in order to eliminate any ambiguity and potential issues. – It is also important for industry that oneM2M provides them an opportunity to confirm their understanding of the oneM2M standards. It gives confidence to go to the market. – Interoperability events give a chance to companies to meet each other in a “neutral” environment, to debug their implementations. – For WG TST, it is a good way to validate the test specifications that have been produced or at least to find any potential issues.
3
When ? Things needed: – Test specifications would need to be in stable draft status. – oneM2M devices and platforms would need to be available (even prototypes) – It needs many implementations in order to get relevant interop testing. – Need to find a good timeframe in order to get the maximum number of oneM2M implentations. It seems that « Autumn 2015 » gathers all these criteria.
4
Scope The scope of the event could be to test the oneM2M primitives communications, for managing the main oneM2M resources. It is the basis for validating the rel-1, before going to something more focused. Test Specifications: – TS-0013: Interoperability testing over HTTP – TS-00XX: Interoperability testing over CoAP
5
Organization TTA and ETSI propose to co-organize the first oneM2M interoperability event, based on their experience from similar events and testing best practice. In order to get a synergy with the oneM2M community and to avoid additional travels, the proposal is to co-locate the Interop test event at the TP#19 in Sophia-Antipolis. The participation will be free of charge and open to all (oneM2M members or not) The company test results will be confidential, participants will need to sign Non-Disclosure Agreement (NDA). The anonymous technical issues will be gathered in a report produced by TTA and ETSI, and provided to WG TST and the WGs for further standardization considerations.
6
Date Options In parallel of the TP#19 in Sophia-Antipolis, 3 days of testing, during TP week (7 to 11 September 2015) The week after TP#19 from Monday 14 to Wednesday 16 Sept 2015 On the week-end after TP#19, but the problem is that ETSI premises are closed on week-end. We have to find an hotel or some facilities to host the test event.
7
How to organise Interop event? 7 Event co-ordination – Registration – Event Promotion – Legal Aspects – Logistics Technical co-ordination Test plan Test Infrastructure Test tools Test Scheduling Test Session Reporting Final technical report
8
Registration 8 Attendance is free of charge but registration is mandatory Companies to register on the web event, indicating the number of participants ( importants for logistics) Companies to fill an oneline form indicating which products types they will test and which « features » are supported (CoAP, HTTP, …) – This is very important for preparing the event especially for scheduling the test sessions. Registration will be confirmed when NDA will be signed by the company
9
Example of Test Network 9
10
Example of a Test Session Scheduling 10
11
Event WIKI A WIKI could be put in place to enhance the exchange of communication and information in the preparation phase and during a Interop event The following information is available – Testing Information Test Specs / Base Specs Testing conventions Equipment parameters – Network Information Any info related to the test infrastructure – Minutes of Wrap Up Sessions Feedback to Standard 11
12
Test Reporting Tool The Test session Reporting (TRT) tool collects test data during testing events – Registration of individual users with distinct access rights, as well as companies and products – Creation of test session reports to capture test execution results and comments – Real-time result summaries of all recorded test sessions – Useful tool for wrap-up sessions – Facilitation for efficient test reporting – Provision of anonymised, statistical results for each test configuration Overall Result / Result per Test group / Result per specific test Technical background – Accessible via internet – Secure web-based access 12
13
Test tools When applicable, the organizers would provide needed test equipments and testing tools.
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.