NCAR Aviation: Past Queen Airs (2) 1960- 70’s DeHavilland Buffalo 1960’s
2
NCAR Aviation: Past cont’d Sabreliner ‘69-’93 Schweitzer Sailplane ‘80-90’s
3
NCAR Aviation: Past cont’d Beech King Air ‘82-’96 General Dynamics WB-57F ‘93-’97
4
NCAR Aviation: Present Lockheed Electra 1973-Present Lockheed C-130 1993-Present
5
Staff Capabilities Project engineeringProject engineering Worldwide field supportWorldwide field support In-field maintenanceIn-field maintenance Scientific researchScientific research Instrument R & DInstrument R & D Airframe modificationAirframe modification Shop fabricationShop fabrication Sheet metal fabricationSheet metal fabrication FAA DER approvalFAA DER approval TechniciansTechnicians Pilots or Co-pilotsPilots or Co-pilots Flight EngineersFlight Engineers MechanicsMechanics Scientists/Project ManagersScientists/Project Managers Engineers (aero, EE, software)Engineers (aero, EE, software)-------------- ~37 Total
6
Global Project Support Frequent Complexities: Remote locationsRemote locations Limited airport capabilitiesLimited airport capabilities Poor access to parts and servicesPoor access to parts and services Scientist(s) as “customers”Scientist(s) as “customers” 2-4 projects/year, each aircraft2-4 projects/year, each aircraft Any continentAny continent Unique payloadsUnique payloads
7
Project Preparation Utilize max floor space, volumeUtilize max floor space, volume Access to apertures, inlets criticalAccess to apertures, inlets critical Highly customizedHighly customized 3-12 week prep period3-12 week prep period Changing instruments, inletsChanging instruments, inlets
8
External Sensors Humidity sensor Wing tip particle probes Pod-mounted probes Shrouded air inlets
9
Maintenance Needs Needs Accommodation for low yearly flight hoursAccommodation for low yearly flight hours Capability for field serviceCapability for field service Cost-effectivenessCost-effectiveness Minimized down time for inspectionMinimized down time for inspection
10
Maintenance Practices Current Practices Progressive (quarterly) maintenance plansProgressive (quarterly) maintenance plans Maintain store of spare parts & spare aircraftMaintain store of spare parts & spare aircraft Flyaway kit for deploymentsFlyaway kit for deployments Staffing: 6 A&P mechanics plus Maintenance ChiefStaffing: 6 A&P mechanics plus Maintenance Chief UCAR Staff FunctionsVendor Functions Quarterly maintenance Routine airframe inspec. AD’s and Svc Bulletins Unscheduled maint. Engine/prop exchanges Major engine repairs OverhaulsC-checks Avionics support
11
Special Repair Capabilities Fabrication and replacement of WB-57F wing spar.