07-Apr-2014-cesg-1 Gian Paolo Calzolari (AD) Gilles Moury (DAD) Fall 2014 Meeting London (United Kingdom) SPACE LINK SERVICES (SLS) AREA Gippo / Gilles.

Similar presentations


Presentation on theme: "07-Apr-2014-cesg-1 Gian Paolo Calzolari (AD) Gilles Moury (DAD) Fall 2014 Meeting London (United Kingdom) SPACE LINK SERVICES (SLS) AREA Gippo / Gilles."— Presentation transcript:

1 07-Apr-2014-cesg-1 Gian Paolo Calzolari (AD) Gilles Moury (DAD) Fall 2014 Meeting London (United Kingdom) SPACE LINK SERVICES (SLS) AREA Gippo / Gilles to update

2 07-Apr-2014-cesg-2 CURRENTLY ACTIVE WGs, BOFs & SIGs WITHIN AREA 1. RFM WGRadio Frequency & Modulation 2. C&S WGCoding & Synchronization 3. SLP WGSpace Link Protocols 4. NGU WGNext Generation Uplink ( No Meeting in London ) 5. MHDC WG Multi/Hyperspectral Data Compression 6. SDLS WG Space Data Link Security (Joint with SEA) 7. OPT WGOptical Communications SLS AREA REPORT

3 07-Apr-2014-cesg-3 SLS Area Report B. Meeting Demographics PlenaryC/SSLPRFMOpticalOPT+C&S+RFM+SLPSDLSMHDC ASI CNES32234323 CNSA2323221 CSA 1 DLR24226211 ESA69458633 INPE JAXA2 172 NASA567311543 RFSA3537231 UKSA1 1 11 Other* 1 1 TOTAL2429222441241410 *South Korea *1 NASA via telecon Meeting Duration0.51.5 3.50.522.5 Agency Diversity86878884

4 07-Apr-2014-cesg-4 SLS AREA REPORT Radio Frequency and Modulation (RFM) WG – Progress Summary 1. Recommendations on high rate telemetry and PN ranging (New) RIDs to RED recommendations 2.4.22A/B received under agency review 401.0-RP-24.1 disposed of; RECs ready for CCSDS publication Accompanying draft GREEN book discussed, finalization expected in 1-2 meetings (Spring-Fall 2015) 2. Recommendations on 26 GHz modulations for EESS (New) WHITE-2 recommendation 2.4.23 discussed, RED version expected in 2 meetings (Fall 2015) 3. Recommendation on 8 GHz modulation for EESS (Update including Higher Order Modulations) Work will resume when SFCG response is received (August 2015) and in synch with 26 GHz recommendation 4. Recommendation on modulation losses due to ranging signals (Update) RIDs to PINK recommendation 4.1.5 received under agency review 401.0-RP-24.1 disposed of; additional editorial discovered; REC ready for CCSDS publication 5. 5-years review of Bandwidth-efficient modulation GB (413.0-G-2) Some additions due to new/modified RECs identified; does not make sense to start review before Spring 2016 due to on-going work 6. PCOM GB (New) Draft book discussed. Finalization was expected by Fall 2015. Only CNES has resources to continue this work and therefore CNES is against freezing this work and resuming it later. ESA withdraws monitoring role in this project  only one Agency providing resources for this project.

5 07-Apr-2014-cesg-5 RFM WG Summary SLS AREA REPORT status:OKCAUTIONPROBLEM comment:Good progressPCOM Green Book RFM WG – Resolutions Recommendations on ranging Publish new issue of 401.0-B with - New GMSK+PN RNG recs 2.4.22A/B; - Revised rec 4.1.5. CESG position on PCOM Problem CESG consider that, if it is confirmed that only Agency works on this book, technical quality cannot be guaranteed. CMC to advise.

6 07-Apr-2014-cesg-6 RFM WG Issue The schedule for the Spring 2015 meeting at Caltech in Pasadena (March 2015) is problematic. Both chairman and vice-chairman of the RFM WG will have to attend ITU CPM-15 meeting in Geneva. The RFM WG current focus is on GMSK+PN ranging, and on 26 GHz modulations for EESS along with VCM/ACM. The latter is a joint activity with the C&S WG. NASA has proposed to make available facilities in Pasadena for both RFM and C&S WG meetings on May 5-7. Other dates were investigated but no other solution could be found. Opposition to splitting the SLS WGs meetings has been expressed by CNES delegates. The FSA delegates stated that this is inconvenient to them but will not oppose it (attendance will depend on agendas and on visas.) DLR delegates stated that there are no problems with the May dates. CNES offered to host the meeting in Toulouse in May. This will be investigated. Additionally, the CMC meeting is planned for May 18 so there is sufficient time to report back the progress to CMC. SLS AREA REPORT

7 07-Apr-2014-cesg-7 C&S: Coding & Synchronization WG - Working Group Summary progress (1 of 3) Uplink codes  Choice of new codes for the update of 231.0-B confirmed by WG: binary LDPC (64,128) and (256,512)  Good progress on the definition of start sequence and CLTU termination strategy for the new codes (to be completed by Spring 2015) Uplink codes Orange Book  WG comments provided before the meeting and resolved by NASA and DLR  New version to tackle the remaining comments to be provided by end of November, a resolution for publication will follow. Sliced data transfer in 131.0 Blue Book  Good progress in the definition of the new feature, with good agreement on the changes required in 131.0  Proposed pink sheet will be circulated to the WG for comments SLS AREA REPORT

8 07-Apr-2014-cesg-8 C&S: Coding & Synchronization WG - Working Group Summary progress (2 of 3) VCM Magenta Book  Good progress on the Magenta book for VCM  Structure of the book agreed at WG level (together with RFM WG).  A new version will be provided by February, for commenting and finally discussion at the Spring 2015 meeting. Architecture for high data rate coded QPSK modulation  WG confirmed inclusion of the relevant material in the Green Book 130.1-G  A new project for the formal justification of the work is still needed SLS AREA REPORT

9 07-Apr-2014-cesg-9 C&S: Coding & Synchronization WG - Working Group Summary progress (3 of 3) (Long) Erasures Codes  DLR Orange Book approved and published  A new project will be created for starting the work on a Blue Book for Erasure coding with NASA and DLR contributing Agencies.  SLS-C&S General Status SLS AREA REPORT status:OKCAUTIONPROBLEM comment:Good progress

10 07-Apr-2014-cesg-10 SLS Space Link Protocols (SLP) WG Goals: 1.Ensure consensus has been achieved within the WG to publish the updated TM, AOS, and TC Space Data Link protocols concurrent with SDLS blue book release. 2.Review updates required to CCSDS 130.2-G-2 Space Data Link Protocols to be in sync with emerging SDLS protocol blue book. 3.Review SDLS OCF type 2 report to determine when this report type should appear in AOS and TM. 4.Review the Unified Space Data Link Protocol GB with a focus on coming to a consensus on a concise and comprehensive set of requirements including the interfaces to the immediate lower and upper layers and determine if the proposed protocol satisfies the requirements. status:OKCAUTIONPROBLEM comment:Good progress SLS AREA REPORT

11 07-Apr-2014-cesg-11 SLP WG Summary Progress: Consensus was achieved in publishing the updates to the TM, AOS, and TC Space Data Link Protocol books in sync with the 1 st release of the SDLS blue book. Only small updates required by secretariat due to consistent use of transfer frame definition required. WG generated a summary of its comments back to the SLP WG for final review of CCSDS 130.2-G-2 Space Data Link Protocols update. To be published (closely) with release of SDLS and TM, AOS, TC updates above. A common definition for transfer frame was selected to be reflected in SANA and the link layer books. Consensus was achieved on the USLP requirements, features, and format was presented. Further progress was made on firming up the fundamental set of USLP requirements including the interface requirements both to the immediate lower and higher layers and determining if the protocol succeeds in providing the needed upgrades. SLS AREA REPORT

12 07-Apr-2014-cesg-12 SLS AREA REPORT SLS-SLP WG (cnt’d) Planning: Expect joint publication of TM/TC/AOS and SDLS protocols by 1Q/2015. Before at Spring 2015 meeting: Issue refined USLP requirements within 2 nd draft USLP GB. Issue 1 st draft version of USLP White Book. Issue updated version of CCSDS 130.2-G-2 Space Data Link Protocols GB. Resolutions: Request that the Area Director forward to CESG a resolution to publish the updated TM, TC, AOS Space Link Protocols based upon both approved SDLS changes and the already CMC approved changes accumulated over the years. Note: pending slight updates to the link layer documents due to the agreement on transfer frame definition.

13 07-Apr-2014-cesg-13 Next Generation Uplink (NGU) Goal: Publish the NGU Green Book on functionality, performance, application profiles, trade offs, etc. for Next Generation Uplink status:OKCAUTIONPROBLEM comment:Book Published WG Closed SLS AREA REPORT NGU WG Summary Progress CCSDS 230.2-G-1 “Next Generation Uplink. Green Book. Issue 1” published July 2014. CMC-P-2014-10-004 Completion of the Next Generation Uplink (NGU) WG Approved.

14 07-Apr-2014-cesg-14 Multispectral & Hyperspectral Data Compression (MHDC) WG 1.New 122.1-B: Spectral pre-processing transform stage to extend 122.0-B to support multispectral & hyperspectral images Achieved consensus on several features of the emerging standard that had previously been under debate Established low-complexity approach for a bit-accurate “default” method of implementing one of the supported transforms, and plans to finalize the details of this approach Cross-verification of transform specifications approaching completion 2.New 120.2-G Lossless Multispectral & Hyperspectral Image Compression Green Book: Text produced for all sections that were previously incomplete; reviewed remarks on this new text. Reviewers assigned to resolve remaining issues identified. 3.CCSDS-120.1-G “Image Data Compression”: handful of corrections identified  WG Resolves to update the book Working Group Status: Active X Idle ____ status:OKCAUTIONPROBLEM comment:Good progress SLS AREA REPORT

15 07-Apr-2014-cesg-15 SLS AREA REPORT MHDC WG (con’t) Problems and Issues: None Planning : 122.1-B: Cross-verification of transform stage expected January 2015. Complete cross-verification expected June 2015. Issue 2 of 122.0-B Image Data Compression: essentially complete. WG will hold onto current draft in case further issues are identified as necessary to support the emerging 122.1-B. 120.2-G Lossless Multispectral & Hyperspectral Image Compression: Reviewers assigned to resolve remaining issues identified and produce revised text and, consolidation these inputs. Expect to be ready for publication Poll shortly after next meeting. Planning : Future Work Green Book for new CCSDS-122.1-B Near-Lossless extension of CCSDS-123.0-B “Lossless Multispectral & Hyperspectral Image Compression” Leverages existing CCSDS-123.0-B standard to provide a very low complexity compressor for missions in need of lossy but high fidelity compression Reconfirmation reviews: CCSDS-121.0-B-2: May 2017 CCSDS-123.0-B-1: May 2017 CCSDS-120.0-G-3: April 2018

16 07-Apr-2014-cesg-16 Space Data Link Security (SDLS) WG Working Group Status: Active - Progress report: 1.SDLS core protocol SDLS red-4 book: includes all RIDs dispositions from Agency Review-3. Final version delivered to CCSDS editor. Awaiting completion of interoperability testing Interoperability testing: performed between CNES and ESA independent implementations. 80% complete. Missing testing of SDLS over AOS to be prototyped by CNES and NASA. SDLS core protocol green book : review of existing text. Still a few missing subsections that should be completed before next meeting. 2.SDLS extended procedures Agreed on formatting rules for SDLS directives and reports messages Agreed on Monitoring & Control service directives & reports Agreed on content of CLSR (Type-2 OCF) for real-time reporting of SDLS Agreed on the level of details of extended procedures services A baseline configuration will be specified to allow interoperability at bit level for extended procedures. SLS AREA REPORT

17 07-Apr-2014-cesg-17 SLS AREA REPORT Space Data Link Security (SDLS) protocol (cont’d) Problems and Issues: None : interoperability testing for core protocol performed for TM and TC by ESA and CNES. NASA committed resources to “SDLS over AOS” prototyping allowing interoperability testing with CNES implementation. status:OKCAUTIONPROBLEM comment:Good progress Planning: SDLS core protocol: Red-4 finalized – ready for publication as Blue Book Interoperability testing: complete 80% - awaiting testing over AOS - target completion date: Feb2015 Blue book publication: target 1Q2015 once interoperability testing completed SDLS extended procedures: White book V1 completed : spring 2015 Red book 1 (including baseline configuration): Spring 2016

18 07-Apr-2014-cesg-18 SLS-OPT: Optical Communications Working Group (1 of 5) Problem and Issues: status:OKCAUTIONPROBLEM comment:Good Progress overall, especially on the Green Book for Real-Time Weather and Atmospheric Data Blue Books Issue: NASA stated that the current plans are unacceptable. ESA/DLR considers this a change from previous agreement. SLS AREA REPORT Planning: The schedule for the Blue Books were adjusted to match the current productivity of the working group It was reported in the spring that the Working Group thought the original schedules were too optimistic. However, ESA/DLR input delivered. The Optical Communications Working Group holds monthly video teleconference meetings Planning for Spring 2015 Face-to-Face Meeting: Review of the two proposed Draft 1 Blue Books with updated technical information

19 07-Apr-2014-cesg-19 SLS-OPT: Optical Communications Working Group (2 of 5) SLS AREA REPORT Summary of Progress: Reached an agreement that the comments on the first draft of the Green Book on Real-Time Weather and Atmospheric Data are due on 8 January 2015 DLR/IKN (Dirk Giggenbach) has agreed to be the “leader” in developing the Low Complexity On-Off Keying proposal for the Blue Books. The new schedules for the two Blue Books and two Green Books have the following dates for submission to the Area Director for approval: Green Book on Real-Time Weather and Atmospheric Data: 30 November 2015 All other books for approved CWE Projects: 28 February 2016

20 07-Apr-2014-cesg-20 SLS-OPT: Optical Communications Working Group (3 of 5) SLS AREA REPORT OPT Blue Books Issue (chart 1 of 3): BACKGROUND: There are two Approved CWE Projects for Blue Books Optical Communications Physical Layer Blue Book, and Optical Communications Coding & Synchronization Blue Book Within each book, THREE “sections” - section 1, 2 and 3 may contain ore or more options – are expected: (1)High Data Rate (2)High Photon Efficiency (3)Low Implementation Complexity For the “High Data Rate” section two options are currently proposed a)Option 1: ESA / DLR proposal b)Option 2: NASA proposal The Working Group reached no consensus on selecting only one of those two as unique CCSDS option for the High Data Rate scenario. NASA, ESA/DLR, and CNES positions are presented in the next two slides.

21 07-Apr-2014-cesg-21 SLS-OPT: Optical Communications Working Group (4 of 5) SLS AREA REPORT OPT Blue Books Issue (chart 2 of 3): NASA POSITION NASA stated that there should be a single “CCSDS recommendation ” for High Data Rate. Not an ESA / DLR recommendation and separate a NASA recommendation The recommendation should support space-to-space, space-to-air, and space- to-ground links NASA is willing to make changes to the NASA proposal based on technical merit so that it can become the single CCSDS recommendation. NASA also stated that acceptable options are: to release the Blue Books with only TWO sections for High Photon Efficiency and Low Implementation Complexity (i.e. without the High Data Rate section). to release TWO Blue Books: one just for High Photon Efficiency and a separate Blue Book just for Low Implementation Complexity while this issue is worked. To release TWO CCSDS Orange Books with High Data Rate a. High Data Rate with ESA / DLR proposal b. High Data Rate with NASA proposal

22 07-Apr-2014-cesg-22 SLS-OPT: Optical Communications Working Group (5 of 5) SLS AREA REPORT OPT Blue Books Issue (chart 3 of 3): ESA/DLR POSITION ESA/DLR consider the new NASA position a major deviation from the previous agreements (IOAG, IOP-3, and CCSDS) ESA/DLR would like to stick with the Blue Book layering structure as agreed in the charter. ESA/DLR would like to create a first set of recommendations encompassing all three regimes. ESA/DLR is prepared to accept having in the Blue Books two options for the high data rate regime. CNES POSITION Ideally, CNES would like CCSDS works on a single worldwide interoperable high rate recommendation that supports the LEO-to-Earth scenario, among other scenarios.

23 07-Apr-2014-cesg-23 RFM WGRadio Frequency & Modulation (New) Recommendation 2.4.22A/B on high rate telemetry and PN ranging ready for publication. (New) Recommendations 2.4.23 on 26 GHz modulations for EESS expected RED for Fall 2015. Recommendation 4.1.5 on modulation losses due to ranging signals ready for publication. Five years review of 413.0-G-2 Bandwidth-efficient modulation GB: to start in Spring 2016 after work on new/modified RECs finalized. PCOM GB expected by Fall 2015. However all Agencies but CNES expressed preference for freezing this work and resuming it later. Request to delay to May 2015 (before CMC) the Spring Meeting, together with C&S WG. C&S WGCoding & Synchronization Selection of new uplink codes for 231.0-B (TC Coding) confirmed, work on-going for CLTU delimitation procedures. NASA & DLR Orange Book on “Short Block length LDPC code for TC” going through last update WG agreed on the structure of draft pink sheets to 131.0-B (TM Coding) to introduce LDPC slicing. WG agreed on the structure of the VCM Magenta book, new draft to be distributed and discussed by Spring 2015. DLR Orange Book on Erasure Codes published. NASA and DLR confirmed support to work for Blue Book for Long Erasure Codes (concept paper under way). NGU WGNext Generation Uplink CCSDS 230.2-G-1 “Next Generation Uplink. Green Book. Issue 1” published July 2014. CMC-P-2014-10-004 Completion of the Next Generation Uplink (NGU) WG Approved. SLS AREA REPORT – SUMMARY (1 of 3)

24 07-Apr-2014-cesg-24 SLS AREA REPORT – SUMMARY (2 of 3) SLP WGSpace Link Protocols Resolution to publish the updates to the TM, AOS, and TC Space Data Link Protocol books in sync with the 1st release of the SDLS blue book generated. New release of CCSDS 130.2-G-2 Space Data Link Protocols expected before Spring 2015 meeting. Progress was achieved on refining what the key set of requirements are for the USLP including the interface requirements to the immediate upper and lower protocol stack levels. Further refinement of the USLP GB along with a draft USLP White Book is planned for Spring 2015. MHDC WGMultispectral & Hyperspectral Data Compression New 122.1-B: Spectral pre-processing transform stage to extend 122.0-B to support multispectral & hyperspectral images: specification progressing for the recommended transforms including low complexity option. Cross-verification of transforms to be performed 1S2015. New 120.2-G Lossless Multispectral & Hyperspectral Image Compression Green Book: nearing completion. Internal review on-going. New project proposal: Near-Lossless extension of CCSDS-123.0-B “Lossless Multispectral & Hyperspectral Image Compression” leveraging existing CCSDS-123.0-B standard to provide a very low complexity compressor for missions in need of lossy but high fidelity compression OPT WGOptical Communications Blue Book for Optical Communications (Physical Layer; Coding & Synchronization): 2 competing proposals for the “High Data Rate” mission profile. No consensus in the WG with respect to allowing one or two options for this profile. Way forward to be resolved by the WG DLR taking the leadership to develop the specification for the “Low Complexity” mission profile Green Book for Real Time Weather and Atmospheric Characterization Data: internal review of 1 st draft on-going.

25 07-Apr-2014-cesg-25 SDLS WGSpace Data Link Security SDLS core protocol SDLS red-4 book: includes all RIDs dispositions from Agency Review-3. Final version delivered to CCSDS editor. Awaiting completion of interoperability testing. Interoperability testing: 80% complete. Missing 20% should be completed by Feb2015, enabling SDLS blue book publication by 1Q2015 SDLS core protocol green book : 80% complete. Priority work for the next 6-month period. Publication expected 2S2015. SDLS extended procedures Agreed on formatting rules for SDLS directives and reports messages Agreed on Monitoring & Control service directives & reports A baseline configuration will be specified to allow interoperability at bit level for extended procedures. Objective: Complete white book – spring 2015; Red-1 for Agency Review - spring 2016 SLS Area want to thank CalTech and NASA/JPL for the excellent accommodation and facilities. SLS AREA REPORT – SUMMARY (3 of 3)