S.L.LloydGrid Steering Committee 8 March 2002 Slide 1 Status of GridPP Overview Financial Summary Recruitment Status EU DataGrid UK Grid Status GridPP and the e-Science Centres
2
S.L.LloydGrid Steering Committee 8 March 2002 Slide 2 GridPP Overview Provide architecture and middleware Use the Grid with simulation data Use the Grid with real data Future LHC Experiments Running US Experiments Build prototype Tier-1 and Tier-2s in the UK and implement middleware in experiments
3
S.L.LloydGrid Steering Committee 8 March 2002 Slide 3 Allocation of GridPP Funds Tier-0 Applications Tier-1/A Middleware Applications/System
4
S.L.LloydGrid Steering Committee 8 March 2002 Slide 4 Recruitment EU Funded Posts (Middleware/Testbed) –All 5 in post + 1 additional from 1/2/02 EDG Unfunded Posts (Middleware/Testbed) –13.5 out of 15 in post –(1 under offer, 0.5 starts 1/4/02 + 0.5 from CeSC) GridPP Posts (Applications + Tier1/A) –Allocated Dec 2001 –~7 out of 15 ~in post CERN Posts –First Round > 100 Applicants –12 Offers, 1 Refusal, 1 Postponed –3 Fellows, 5 Staff members, 2 UK University Staff –4 in Applications, 2 Data Management, 3 Systems, 1 Management
5
S.L.LloydGrid Steering Committee 8 March 2002 Slide 5 Recruitment Overall: Initially problems with EU Funded posts at RAL. Since then no real problems recruiting - mixture of academic and software industry backgrounds. Delays mainly caused by (University) bureaucracy.
6
S.L.LloydGrid Steering Committee 8 March 2002 Slide 6 EU DataGrid First EU Review of DataGrid completed last week. –Verbal feedback very positive. –Reviewers commended overall good performance. –Several areas above expectations. –All deliverables accepted as they are. –Earlier UK concerns successfully overcome. UK Contributions –Architectures –Testbed-1 –Network Monitoring –Storage Element –Certificates & Security –R-GMA –LCFG –MDS deployment –Spitfire –…
7
S.L.LloydGrid Steering Committee 8 March 2002 Slide 7 LCFG
8
S.L.LloydGrid Steering Committee 8 March 2002 Slide 8 R-GMA Consumer Servlet Registry API Consumer Servlet Registry API Consumer Servlet Registry API Consumer Servlet Registry API Sensor Code Producer API Application Code Consumer API ProducerServlet Registry API Registry Servlet Schema API Schema Servlet Event Dictionary Application Code Archiver API DBProducer Servlet Archiver Servlet Consumer API Consumer API Consumer API Consumer API User code monitors output here. User code here. Builds on R-GMA Database Structures. Relational Grid Monitoring Architecture
9
S.L.LloydGrid Steering Committee 8 March 2002 Slide 9 EDG Testbed Status For EU Review of DataGrid on 1st March a Testbed 1.1 grid of 5 sites was constructed: –CERN, RAL, IN2P3-Lyon, CNAF-Bologna, NIKHEF. –The demos included jobs running at all sites and moving data. –This had the required functionality working but proved unreliable. An attempt will be made to make it stable in Release 1.1.2 –Then it will be released to more sites In UK we have a rollout plan that will start then. –Most sites plan to be involved in the GridPP Grid in some way. –Core UK sites at first will be RAL, Bristol, Manchester, IC where we have funded WP6 effort.
10
S.L.LloydGrid Steering Committee 8 March 2002 Slide 10
11
S.L.LloydGrid Steering Committee 8 March 2002 Slide 11
12
S.L.LloydGrid Steering Committee 8 March 2002 Slide 12 UK Tier1/A Status Hardware Purchase for delivery in March 156 Dual 1.4GHz 1GB RAM, 30GB disks 26 Disk servers (Dual 1.266GHz) each with 1.9TB disk Expand the capacity of the tape robot by about 35TB Current setup 14 Dual 1GHz PIII, 500MB RAM 40GB disks Compute Element (CE) Storage Element (SE) User Interface (UI) Information Node (IN) Central Facilities (Non Grid) 250 CPUs 10TB Disk 35TB Tape (Capacity 330 TB)
13
S.L.LloydGrid Steering Committee 8 March 2002 Slide 13 Tier-2 - ScotGrid ScotGrid Processing nodes at Glasgow 59 IBM X Series 330 dual 1 GHz Pentium III with 2GB memory 2 IBM X Series 340 dual 1 GHz Pentium III with 2GB memory and dual ethernet 3 IBM X Series 340 dual 1 GHz Pentium III with 2GB memory and 100 + 1000 Mbit/s ethernet 1TB disk LTO/Ultrium Tape Library Cisco ethernet switches ScotGrid Storage at Edinburgh IBM X Series 370 PIII Xeon with 512 MB memory 32 x 512 MB RAM 70 x 73.4 GB IBM FC Hot- Swap HDD BaBar UltraGrid System at Edinburgh 4 UltraSparc 80 machines in a rack 450 MHz CPUs in each 4Mb cache, 1 GB memory Fast Ethernet and MirrorNet switching CDF equipment at Glasgow 8 x 700 MHz Xeon IBM xSeries 370 4 GB memory 1 TB disk Griddev testrig at Glasgow 4 x 233 MHz Pentium II
14
S.L.LloydGrid Steering Committee 8 March 2002 Slide 14
15
S.L.LloydGrid Steering Committee 8 March 2002 Slide 15
16
S.L.LloydGrid Steering Committee 8 March 2002 Slide 16 GridPP & Core e-Science Centres NeSc –Close ties, hosted 2nd GridPP Collaboration Meeting, Collaboration on EDIKT Project? Training... Belfast –Replied but not yet up and running. Cambridge –Close ties, hosted 3rd GridPP Collaboration Meeting. Share one post with GridPP. Will collaborate on ATLAS Data Challenges. Cardiff –Replied - contacts through QM (Vista) and Brunel GridPP Group. Written formally to all e-Science centres inviting contact and collaboration with GridPP.
17
S.L.LloydGrid Steering Committee 8 March 2002 Slide 17 GridPP & Core e-Science Centres London –No formal reply but close contacts through IC HEP Group. IC will host 5th GridPP Collaboration Meeting. Manchester –No reply. Manchester HEP Group will host 4th GridPP Collaboration Meeting. Newcastle –In contact - Database projects? Oxford –Close ties, collaboration between Oxford HEP Group and GridPP on establishment of central Tier-2 centre? CS/Core-GridPP-EDG links? Probably host 6th GridPP Collaboration Meeting. Southampton –Replied but no collaboration as yet.
18
S.L.LloydGrid Steering Committee 8 March 2002 Slide 18 Summary OGSA GridPP Project up and running EDG Middleware development well underway –Recruitment ~ complete –1st EU Review successful EDG Testbed 1 being rolled out –UK in 1st rollout –Now extend to several UK sites Application Development –Just starting –Recruitment underway –1st US tests successful UK Grid –1st Procurement for RAL Tier-1/A underway –Tier-2s developing Core e-Science Centres –Good relationships evolving