Presentation is loading. Please wait.

Presentation is loading. Please wait.

ALISAGAR LIFT IRRIGATION SCHEME – 2 years period

Similar presentations


Presentation on theme: "ALISAGAR LIFT IRRIGATION SCHEME – 2 years period"— Presentation transcript:

1 ALISAGAR LIFT IRRIGATION SCHEME – 2 years period
(FLOW CHART) PUMP HOUSE PUMP HOUSE PUMP HOUSE PRESSURE MAINS PRESSURE MAINS PKG 14 PKG 14 PKG 14 PACKAGE 14, CATEGORY 1: Construction of Pump houses, surge pools, supply of pumps and pressure mains Work Awarded : L & T Ltd., Bid value : Rs Cr. Completed Progress

2 ALISAGAR LIFT IRRIGATION
1 Project Profile : Lifting of 2.96 TMC (discharge 720 C/s) from river Godavari from fore shore of SRSP near Kosli (V) 2 Administrative Sanction Rs. 108 Crs. 3 No. of EPC Packages : 1 No. 4 Agt. Value of EPC Pkg. + old ongoing works Rs Crs. 5 Budget Provision for (GWUA) Rs Crs. 6 Expenditure Rs Crs. Rs Crs. TOTAL Rs Crs. 7 Utilisation 2.96 TMC 8 Ayacut 53,793 acres

3 ALISAGAR LIFT IRRIGATION
9 Land Acquisition Required : 245 acres Acquired 10 Lift - I Lift Height 26 M No. of Pumps 4 Nos. x 2,100 Total pumps Capacity 11,260 HPs. 11 Lift - II 36 M 4 Nos. Total pumps capacity 15,281 HPs. 12 Lift – III 24 M 6,434 HPs. 13 Power required 25.48 MW 14 Mobilisation Advance Paid Recovered 8.32Crs Crs. 8.20Crs Crs. Total 16.52 Crs Crs. 15 Target date for completion 6/2007

4 ALISAGAR LIFT IRRIGATION SCHEME
PKG No. Description Awarded Bid Amount Rs. in Crs. 14 Construction of pump house hydro electrical, mechanical and laying pressure main of all three stages of Alisagar Lift Irrigation Scheme, Nizambad Dist. M/s Larsen & Toubro Ltd, Chennai 163.98

5 ALISAGAR LIFT IRRIGATION SCHEME
Package No.14 / Cat-I : Construction of pump house hydro electrical, mechanical and laying pressure main of all three stages of Alisagar Lift Irrigation Scheme, Nizamsagar district. Name of the Contractor : M/s L & T Ltd. Agreement Amount : Rs Crs. Agreement Date : Period of Completion : 24 Months(8 milestones) Date of completion : 3/2007 All civil works, viz., Cisterns, Main canals, Balancing reservoirs - completed (non-EPC) Execution : Work in 3Nos. of pump houses started against 3Nos. Work in 3Nos. of approach channels started against 3Nos. Work in 3Nos. of pressure mains started against 3Nos. Pipe supplying : 9.84 km length of 2.20 m dia supplied against 14Kms length Pipe line laying : Km completed against 14 KM length (2 rows of 7kms each) Qty. of earth work done : 50,000 Cum against 2.09 Lakh Cum Qty. of concrete work done : 2860cum Land Acquisition : Required: 245Acres; Acquired: 245cres Expenditure : Rs Crs. (including Mob. Adv Crs.) against Rs Crs [EPC = Rs Crs., Non-EPC = Rs Crs.] Date of completion : Khariff / 2006


Download ppt "ALISAGAR LIFT IRRIGATION SCHEME – 2 years period"

Similar presentations


Ads by Google