Jawaharlal Nehru National Urban Renewal Mission JNNURM PROGRESS REVIEW December 2008 Projects State : Karnataka City : Mysore.

Similar presentations


Presentation on theme: "Jawaharlal Nehru National Urban Renewal Mission JNNURM PROGRESS REVIEW December 2008 Projects State : Karnataka City : Mysore."— Presentation transcript:

1 Jawaharlal Nehru National Urban Renewal Mission JNNURM PROGRESS REVIEW December 2008 Projects State : Karnataka City : Mysore

2 Jawaharlal Nehru National Urban Renewal Mission Abstract of Projects Status of projects submitted under JnNURM for Mysore City Sl. No. Status of ProjectsNo. of Works Amount in Crores Remarks 1Projects approved by GoI7744.31 2Projects submitted to GoI for approval10595.68 3Projects in the pipeline for submission7558.50 Total241898.49 KUWS & DB MUDAKSCBKSRTCMCCTourismHeritage Sl.Status of Projects No. of Works Amount in Crores No. of Works Amount in Crores No. of Works Amount in Crores No. of Works Amount in Crores No. of Works Amount in Crores No. of Wor ks Amount in Crores No. of Works Amount in Crores 1.1. Projects approved by GoI 2303.361219.032136.20185.2510.47 2 Projects submitted to GoI for approval 2111.205415.98265.6012.99 3 Projects in the pipeline for submission 3469.58129.92239.00120.00 Total 5772.944360.152136.20185.258455.45265.60222.90

3 Jawaharlal Nehru National Urban Renewal Mission Projects Approved by GoI Sl. No. Name of the Project Appr cost in Crores Implementing Agency Status Sector: Water Supply 1.Remodeling of Water Supply distribution network, automation of system and providing integrated management system for Mysore city 194.54KUWS & DB WORK FLOW CHART :

4 Jawaharlal Nehru National Urban Renewal Mission Project Approved by GoI Sl. No. Name of the Project Appr cost in Crores Implementing Agency Status Sector: BSUP 2.Rehabilitation of 20 selected slums of Mysore City.(2788 houses) 17 selected slum rehabilitation 3 slums development works 67.58 Housing- 50.18 Infr-13.527 O&M-3.872 KSCB In Phase-I, 1188 houses have been entrusted to Mysore Nirmithi Kendra at a cost of Rs.1.80 Lakhs per dwelling unit and 1170 houses have been entrusted to different empanelled contractors as approved in the SLEC meeting held on 25-10-08. The following works have been started. a. Mandakally - 480 Houses b. Roopanagar, Bogadi - 144 Houses c. Metagally - 276 Houses d. Hanchya Sathgally Block 1 - 180 Houses e. Hanchya Sathgally Block 2 - 186 Houses 3.Rehabilitation of 46 selected slums of Mysore city(2500 Houses) 90.93KSCB As per in the SLEC meeting held on 25- 10-08,Tenders were finalized. Package 1(300 Houses) was rejected as it was a conditional Tender. Package 2(396 Houses), Package 3(348 Houses) & Package 7(Providing Infrastructure for 5 Slums) have been approved.For balance 1456 houses land is awaited( For Package 4,5 & 6)..

5 Jawaharlal Nehru National Urban Renewal Mission Project Approved by GoI Sl. No. Name of the Project Appr cost in Crores Implementing Agency Status Sector: Transportation 4.Infrastructure Development of Transport System in Mysore. Project Cost:Rs. 108.90 crores Work awarded on: 25.8.08 Contract period: 18 months excluding monsoon period (3 months) 85.25KSRTC M/s. Nagarjuna Construction company Limited is the lowest bidder. MoA b/n M/s. NCCL and KSRTC took place. Work started in Kuvempunagar(60 lakhs), RS Naidunagar(45 lakhs), Sathagalli (125 lakhs)and Muffosil bus station. Work needs to be commenced in Ilawala, CBS and at Chamundi hills. An amount of Rs. 715 lakhs has been executed against the target of 703 lakhs till the mid of December 2008.

6 Jawaharlal Nehru National Urban Renewal Mission Project Approved by GoI Sl. No. Name of the Project Appr cost in Crores Implementing Agency Status Sector: Roads 5.Upgrading 2 lane outer ring road to 6 lane along with service road from Mysore- Bangalore road to Mysore-Nanjungud road (0 to 25 km-western side ) and upgrading 4 laned outer ring road to 6 lane along with service road from Mysore-Bangalore road to Mysore-Bannur road (0 to 7.49 km – Eastern side) 219.03MUDA Approved by GOI on 15.02.08 in CSMC meeting. Only one bidder qualified during technical bid stage. For clarification, full tender file submitted to UDD. Financial bid to be opened later. Retendering notification for four packages dated 17.09.08 has been floated. Last date for submission of tender documents is 31.10.08. Opening of technical bid is slated on 3.11.08. The high court has stayed the proceedings of tender. Sector: Others 6.Project Implementation Unit0.47MCC Public health Engineer and Information technology Officer has reported. Human resource Development officer yet to report. Tender has been called for the remaining posts. 7.Augmentation of bulk water supply from river Kabini & strengthening of system. 108.82KUWS & DBApproved by GOI and tender to be called Total 744.31

7 Jawaharlal Nehru National Urban Renewal Mission Projects Waiting Approval at GoI Sl. No. Name of the Project Appr cost in Crores Implementing Agency Status Sector: Solid Waste Management 1Development of an integrated Municipal solid waste (MSW) management plant for the city of mysore 28.98MCCThe Project has been cleared in CSMC meeting held on 19/12/08. Proceedings awaited. Sector: Preservation of Water Bodies 2Conservation on Natural lakes in Mysore- Packages 1 (4No. of Lakes) 6.63MCCDPR submitted to GoI for approval. Central Water Commission to scrutiny the DPR. 3Conservation on Natural lakes in Mysore- Package 2 (4 No. of Lakes) 6.46MCCDPR submitted to GoI for approval. Central Water Commission to scrutiny the DPR. Sector: Drainage 4Remodeling of storm water drain in Mysore (104.67km) 347.28MCCThe Project has been cleared in CSMC meeting held on 19/12/08. Proceedings awaited.

8 Jawaharlal Nehru National Urban Renewal Mission Projects Waiting Approval at GoI Sl. No. Name of the Project Appr cost in Crores Implementi ng Agency Status Sector: Others 5Setting up of new modern Abattoirs26.63MCCThe project was returned by GOI to consider it under NABARD scheme. Since NABARD assistance is limited to Rural areas, it was once again requested to GOI for reconsideration under SWM. Sector: Roads 6Construction of balance length of the outer ring road with a 6 lane road along with service road from Bannur road to Nanjungud road (Ch. 7.49km to 16.635km) 90.70MUDAFinal notification for land acquisition completed. Resubmitted to GOI for re- consideration. Sector: Heritage and Urban Renewal 7Development of Tourist Infrastructure In Mysore- Pakage1 development of Chamundi Hill 13.78Tourism Departme nt DPR submitted to GOI. Awaiting approval from GoI. observations communicated to the director dept of tourism vide letter dated 22.11.2008 Sector: Heritage and Urban Renewal 8Development of 35 acres Heritage park in front of Lalith Mahal palace in K.C. Layout, Mysore 20.50MUDADiscussed in CSMC meeting on 15.02.08 to be reconsidered after getting comments from heritage experts. Expert committee to be formed by GoI.

9 Jawaharlal Nehru National Urban Renewal Mission Projects Waiting Approval at GoI Sl. No. Name of the Project Appr cost in Crores Implementing Agency Status 9Conservation of heritage buildings.2.90HeritageDPR submitted to GOI. Awaiting approval from GoI. 10Development of heritage core51.82Tourist Department Cleared in SLEC on 18th march 08, submitted to GOI. Awaiting approval from GoI. Total595.68 REFORMS

10 Jawaharlal Nehru National Urban Renewal Mission Projects in the pipeline for submission Sl. No. Name of the Project Appr cost in Crores Implementing Agency Status Sector: Sewerage 1.Remodeling of the UGD network in old areas of the city and development of sewage treatment plant ( STP ) for the uncovered areas 392.58KUWS&DBPPT made before MCC officers. DPR finalized and submitted to KUIDFC. Sector : BRTS/Roads/other urban transport 2.Restructuring of intermediate ring road and construction of subways in Mysore (27.49km of road and 2 No. of Subways) 20.00MCCNegotiation underway with 2 nd lowest bidder, M/s. CES, bangalore. 3.Extension of 4 Railway under bridges (RUB’s) from 2 lane to 6 lane across outer ring road (western side) at ch. 1.15km, 1.95, 3.57km and 20.54km (On deposit basis to railways) 29.92MUDARailway department to submit estimate. DPR under preparation. Sector : Heritage & Urban Renewal 4.Improvement of Urban forestry in Mysore (53 No. of Parks totaling to 103.04 acres) 19.00MCCSubmitted DPR to KUIDFC for placing before SLEC and was refused. Request has been made to KUIDFC vide letter No. MCC/SE/JnNURM/147/08- 09 dated 01.10.08 to reconsider the project. 5.Providing Infrastructure facilities to heritage buildings and circles of Mysore 20.00Heritage Department DPR preparation under progress HUDCO are the consultants.

11 Jawaharlal Nehru National Urban Renewal Mission Projects in the pipeline for submission Sl. No. Name of the Project Appr cost in Crores Implementing Agency Status Sector: Water Supply 6.Strengthening of existing Hongalli II & III Stage WSS 47.50KUWS & DBDPR to be submitted to KUIDFC 7.Augmentation of 50 MLD from III Phase Melapura. 29.50KUWS & DBDPR finalised. MCC passes resolution. DPR to be submitted to KUIDFC from KWB. Total558.50


Download ppt "Jawaharlal Nehru National Urban Renewal Mission JNNURM PROGRESS REVIEW December 2008 Projects State : Karnataka City : Mysore."