Presentation is loading. Please wait.

Presentation is loading. Please wait.

CERN – BT – 01/07/2003 - 1 Cern Fabric Management -Hardware and State Bill Tomlin GridPP 7 th Collaboration Meeting June/July 2003.

Similar presentations


Presentation on theme: "CERN – BT – 01/07/2003 - 1 Cern Fabric Management -Hardware and State Bill Tomlin GridPP 7 th Collaboration Meeting June/July 2003."— Presentation transcript:

1 CERN – BT – 01/07/2003 - 1 Cern Fabric Management -Hardware and State Bill Tomlin GridPP 7 th Collaboration Meeting June/July 2003

2 CERN – BT – 01/07/2003 - 2 Introduction u Hardware Management System l Addresses issues like u Informal workflows which dont scale for LCG u Manual, labour intensive work u Where are the boxes and what are they u State Management System l Enables configuration with high level directives l Deliver to nodes their desired state using EDG WP4 s/w l Integrate with HMS, installation, configuration, monitoring, fault tolerance

3 CERN – BT – 01/07/2003 - 3

4 CERN – BT – 01/07/2003 - 4 HMS Tools u A workflow tracking tool l Consistent, traceable, formal workflows l Handle multiple machines at a time l Automatically request installs, retires etc. l Handle delays u A visualisation tool l Enables location of objects in CC

5 CERN – BT – 01/07/2003 - 5 HMS Workflow Application

6 CERN – BT – 01/07/2003 - 6 HMS Visualisation Tool

7 CERN – BT – 01/07/2003 - 7 State Management…

8 CERN – BT – 01/07/2003 - 8 State Management System u Manage state during l Hardware Use Cases u Installations u Moves u Repairs u Retirements l Monitoring Alarms and Fault tolerance l Software Updates u Leverages EDG WP4 CDB…

9 CERN – BT – 01/07/2003 - 9 ClientServer XML HLDL PAN DBM Notification + Transfer Low Level API High Level API Component Access API GUI Subscription CVS EDG WP4 Configuration

10 CERN – BT – 01/07/2003 - 10

11 CERN – BT – 01/07/2003 - 11 Scenario: HMS Move

12 CERN – BT – 01/07/2003 - 12 Status u HMS Workflow Application l In production for all Use Cases l Must integrate with EDG configuration components, SMS l Maintenance u HMS Visualisation l In production l Search for more things in more places l View and change (?) their properties u State Management l Have an architectural prototype; CDB still evolving l Requirements need iterating over l Configuration of valid states and transitions l Can write actuators to implement state transitions on node l Need to interoperate with LCG fabric management components l Trivial to expose as a web service

13 CERN – BT – 01/07/2003 - 13 Questions


Download ppt "CERN – BT – 01/07/2003 - 1 Cern Fabric Management -Hardware and State Bill Tomlin GridPP 7 th Collaboration Meeting June/July 2003."

Similar presentations


Ads by Google