Download presentation
Presentation is loading. Please wait.
Published bySierra Schmitt Modified over 11 years ago
1
David Britton, 18/2/04 Imperial, College GridPP1 Status David Britton, 18/2/2004 Imperial College
2
David Britton, 18/2/04 Imperial, College Project Overview
3
David Britton, 18/2/04 Imperial, College Missed Targets LCG have now re-numbered this 1.4.3.2 and it is due 31-Mar-04
4
David Britton, 18/2/04 Imperial, College Changes to ProjectMap
5
David Britton, 18/2/04 Imperial, College Risk Register
6
David Britton, 18/2/04 Imperial, College Achievements - LCG
7
David Britton, 18/2/04 Imperial, College Achievements - EDG All EDG deliverables submitted.
8
David Britton, 18/2/04 Imperial, College Achievements - Applications
9
David Britton, 18/2/04 Imperial, College Achievements - LHCb
10
David Britton, 18/2/04 Imperial, College Achievements - Infrastructure
11
David Britton, 18/2/04 Imperial, College InfrastructureInteroperabilityDissemination
12
David Britton, 18/2/04 Imperial, College
13
David Britton, 18/2/04 Imperial, College Resources
14
David Britton, 18/2/04 Imperial, College Summary 76% of the 190 GridPP1 tasks have been successfully completed. 2 tasks are overdue. The LCG-2 release is imminent and will be used in the next DCs. The EDG project is currently undergoing a final review. The applications are making good progress on many fronts. The UK Grid infrastructure is being developed.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.