Download presentation
Presentation is loading. Please wait.
Published byEdith Burns Modified over 9 years ago
1
Frank Geurts Rice Univ.
2
Introducing ◦ barrel TOF and upVPD in Run 9 TOF software ◦ past, present, and future Calibrations ◦ start, stop, and status MIT -- July 7, 2009 2STAR Analysis Meeting
3
Based on Multi-gap Resistive Plate Chambers (MRPC) various prototypes since Run 3. timing electronics based on CERN’s HPTDC chip Significant increase in scale: Run 8: 5 trays (4%) Run 9: 86 out of 120 trays (72%) Run 10: 120 trays (100%) Run 9 experience: stable running, TOF participated in nearly all runs; 10 dead channels out of 16,500; average noise rate per channel is less than 10 Hz. MIT -- July 7, 2009 3STAR Analysis Meeting
4
EAST WEST TPC support arms Run-8 trays MIT -- July 7, 2009 4STAR Analysis Meeting
5
upVPD replaced pVPD (Run8): ◦ both based on scintillator and fast PMTs ◦ uses similar timing electronics as TOF ◦ upgrade involves increase in #channels from 6 to 38 channels (east + west) STAR |Z|=570cm and 4.24 < |η| < 5.1 collision point MIT -- July 7, 2009 5STAR Analysis Meeting
6
Various prototype TOF trays resulted in an equally varied set of Makers: ◦ StTof*, StTofp*, StTofr*, … (St_ctf_*) ◦ StEvent TOF data model includes legacy components considerable overlap between classes Significant maintenance burden to both TOF group and STAR TOF Software Review (Nov.08) recommendation ◦ freeze old versions ◦ design new StEvent data model and clean reconstruction code accordingly As of Run 9 production of TOF data only through StBTof* Makers and StBTof* classes in StBTofCollection ◦ a lot of work done by Xin Dong MIT -- July 7, 2009 6STAR Analysis Meeting
7
New offline DAQ reader based on RTSReader ◦ TOF data format specs v2.4 ★ ◦ implemented Run 8 MIT -- July 7, 2009 STAR Analysis Meeting7 StBTofHitMaker DAQ TOF Branch StBTofCollection: StBTofHeader StBTofRawHit StBTofHit StBTofCollection: StBTofHeader StBTofRawHit StBTofHit ◦ fiber data status and trigger time are stored in StBTofHeader ◦ leading-edge and trailing-edge values are stored in StBTofRawHit ◦ INL-corrected LE and TE values stored in StBTofHit ★ ) http://www.star.bnl.gov/public/tof/electronics/TOF_Fiber_Data_Format_v2_4.pdf Jing Liu Xin Dong
8
event-wise hit distributions matched hit distributions channel-by-channel timing distributions ◦ requires fast-offline calibration by experts ◦ Vz from upVPD, TOF PID Implemented in StEventQAMaker During Run 8 and Run 9 QA by TOF experts MatchMaker will soon be included in Fast Offline MIT -- July 7, 2009 STAR Analysis Meeting8 Offline DAQ Fast Offline Reconstruction EventQAMaker histograms QA by shift crew
9
MIT -- July 7, 2009 STAR Analysis Meeting9 STAR/TO F DAQ GSTAR geant hits GSTAR geant hits geometry (btofgeo) TOF Offline DAQ reader StBTofHitMaker TOF Offline DAQ reader StBTofHitMaker TOF Simulation Maker TOF Mixer Maker StBTofMatchMaker StBTofCalibMaker StEvent StBTofCollection StBTofRawHit StBtofHeader StBTofRawHit StBtofHeader StBTofHit StTrack StBTofPidTraits StMuBTofUtil StMuDstMaker StMuBTofUtil StMuDstMaker MuDst TOF StMcEvent StMcBTofHit BTofRawHit BTofHit BTofHeader BTofRawHit BTofHit BTofHeader association DB Tables StBTofUtil StBTofPool DB Tables StBTofUtil StBTofPool
10
MIT -- July 7, 2009 STAR Analysis Meeting10 StEvent StBTofCollection StBTofHit Track Nodes (global) StBTofPidTraits Projected TOF Hits Fired TOF Hits Init Matched TOF Hits Singly-Tracked Matched Hits Final Matched TOF Hits Track projection on TOF Matching of hits within one pad distance Associate one TOF hit with multiple tracks One track with multiple TOF hits TOF Cell Index Timing Projected position Associated Track … and remove
11
btofgeo.g and vpddgeo.g provide various TOF/VPD geometries: ◦ btofgeo.g -- btofConfigure ◦ vpddgeo.g -- vpddConfigure MIT -- July 7, 2009 STAR Analysis Meeting11 1Full CTBRun 1 2Full TOFp-- 325% TOFp +75% CTB-- 4TOFp +CTBRun 2 5TOFp+TOFr+CTBRun 3 6Full MRPC-TOFRun 9++ 7TOFp+TOFr’+CTBRun 4 8TOFr5+CTBRun 5 9-Run 6 10-Run 7 115 TOFr8+CTBRun 8 1-6pVPDRun 2-5 7upVPDRun 6++
12
MIT -- July 7, 2009 STAR Analysis Meeting12 StBTofHitMaker DB Tables StBTofUtil DB Tables StBTofUtil StBTofCalibMaker StBTofMatchMaker StMuDstMaker/StMuBTOFUtil STBTofNtupleMaker Trees for Calibration
13
Integral Non-Linearity (INL) Trigger timing window Start-side calibration upVPD ◦ signal slewing, T vs. Time-over-Threshold (TOT) Stop-side calibration Barrel TOF ◦ TOF T0 ◦ signal slewing (T vs. TOT) ◦ MRPC cell signal propagation (T vs. Z local ) ◦ tray alignment calibration MIT -- July 7, 2009 STAR Analysis Meeting13
14
INL correction determined for all TOF HPTDC channels Full TOF Barrel: 120x192 = 23k TDC channels 1024 bins/channel at 2byte precision In Offline Database Applied by StBTofHitMaker April 26, 2009 Hanghzou Workshop on STAR TOF14 RMS 3.993 RMS 0.7789 σ = 0.7659 ≈ 18ps INL applied no INL applied HPTDC integral non-linearity (INL): periodicity 1024 bins (25ns) calibration data collected on testbench expect no change, but will monitor Jing Liu
15
HPTDC timing information is based on a free running clock ◦ determine optimal window for trigger timing ◦ timing affected by e.g. firmware changes MIT -- July 7, 2009 STAR Analysis Meeting15 Xiaoping Zhang Yi Zhou Final trigger timing window checked for Run 9 (500GeV) based on Fast-Offline data one parameter per tray, ready for database Applied by StBTofHitMaker
16
Preliminary Calibration of Run 9 p+p 500 GeV ◦ based on Fast-Offline production, ~3M events MIT -- July 7, 2009 STAR Analysis Meeting16 Zebo Tang Xiaoping Zhang Separate East & West Calibration Iterative process Low multiplicity in upVPD is an issue not all events will have a start-time Calibration constants ready for database (500GeV) Applied by StBTofCalibMaker
17
Alternative approach in upVPD calibration less sensitive to “outliers”, e.g. potentially resulting from additional vertices. MIT -- July 7, 2009 STAR Analysis Meeting17 Bill Llope Promising first results: Resolution per channel ~140ps upVPD start resolution < 100ps (for 1.AND.1)
18
Use a clean π sample, either from TPC dE/dx (and momentum cuts) or a pre-calibrated TOF in the next iterations T0 Calibration: ◦ compensate for differences in cable lengths and signal transition times. ◦ shifts the mean of TOF measured - TOF expected to 0 ◦ determined channel by channel, i.e. per MRPC cell ◦ Parameters done for 500GeV ◦ Ready for database ◦ Applied in StBTofCalibMaker MIT -- July 7, 2009 STAR Analysis Meeting18 Momentum p (GeV/c) dE/dx (KeV/cm) Tray 118 – Module 0 Zebo Tang
19
Slewing Correction compensates for correlation between signal timing and signal height. ◦ time-over-threshold is proportional to signal height; based on a trailing edge timing measurement in addition to the leading edge use spline fits, and store its shape, i.e. bin values pp-500GeV: difficult to get enough statistics ◦ corrections were performed per TDIG board (4 MRPCs, 24 channels) ◦ Preliminary set ready for database, applied by StBTofCalibMaker MIT -- July 7, 2009 STAR Analysis Meeting19 Run-8 [pp 200GeV] Run-9 [500GeV] 3M events
20
MIT -- July 7, 2009 STAR Analysis Meeting20 T-Z loc correlation in Run 5 Ming Shao Local Z-hit position correction ◦ Expect a Z hit dependence as signal propagation on the pick-up pads can be 40-50ps/cm ◦ No strong dependence observed in Run 8 and 9; not yet understood. Corrections are available for Run 9 p+p 500GeV ◦ ready for database, applied by StBTofCalibMaker Run 9 Run 8
21
procedures involve several iterations ◦ e.g. using a slew-corrected timing to improve T ref or T0 timings once a large statistical sample is available determine the tray alignment calibration MIT -- July 7, 2009 STAR Analysis Meeting21 start-side calibrationstop-side calibration
22
MIT -- July 7, 2009 STAR Analysis Meeting22 ToT fit failures σ ≈115ps Zebo Tang
23
MIT -- July 7, 2009 STAR Analysis Meeting23 Operation condition Time Resolution (ps) Start timeOverallStop time Run III 200GeV d+Au 8512085 200GeV p+p 14016080 Run IV 62GeV (Au+Au) 5510589 200GeV (Au+Au) FF/RFF 2786(74)82(70) HF 2082(74)80(71) Run V 200GeV Cu+Cu (ToT) 509275 62GeV Cu+Cu (ToT) 8212594 Run VIII 200 GeV d+Au(ToT) NA 200 GeV p+p(ToT) 8311275 Run IX 500 GeV p+p (preliminary) 8511578 200 GeV p+p ---
24
TOF stable operations during Run 9 TOF offline software: major changes ◦ shed legacy code and introducing new BTOF classes ◦ production makers for are in place for calibration TOF calibration: full-steam ahead ◦ 500GeV: first preliminary calibration ◦ 200GeV: will require a larger data sample, verify the effect of the different discriminator threshold settings, verify field polarity change Still a lot of work ahead: ◦ Continue to roll-out new TOF offline components (StBTofCalibMaker, StBTofSimMaker, embedding) ◦ Optimize existing and develop new calibration procedures (e.g. start-less TOF for low energy runs) MIT -- July 7, 2009 STAR Analysis Meeting24
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.