1 Restoring Water Levels on Lakes Michigan-Huron: Impact Analysis IUGLS Study Board Meeting Windsor, ON Nov 30, 2010 Bryan Tolson 1 Masoud Asadzadeh Saman.

Similar presentations


Presentation on theme: "1 Restoring Water Levels on Lakes Michigan-Huron: Impact Analysis IUGLS Study Board Meeting Windsor, ON Nov 30, 2010 Bryan Tolson 1 Masoud Asadzadeh Saman."— Presentation transcript:

1 1 Restoring Water Levels on Lakes Michigan-Huron: Impact Analysis IUGLS Study Board Meeting Windsor, ON Nov 30, 2010 Bryan Tolson 1 Masoud Asadzadeh Saman Razavi 1. Assistant Professor Department of Civil and Environmental Engineering

2 2 Introduction Purpose is to assess the impacts of “restoring” Lake MH levels by 10 cm to 50 cm x-cm restoration here is defined as a permanent structural change to the St. Clair River that raises the long term average of Lake MH by x-cm The actual structural change is not specified and thus the actual hydraulic impacts are not assessed here Instead, we assume that reducing the conveyance of the St. Clair River as simulated in the co-ordinated routing model (CGLRRM) is roughly representative of system-wide restoration impacts of some actual structural change to reduce St. Clair River conveyance

3 3 Q SC = K SC ((MH+SC)/2-ym SC ) a SC (MH-SC) b SC -IW ym SC : Mean Channel Bottom Elevation of St. Clair River With the default value of 167.00 m With the default value of 167.00 m Base case: ym SC = 167.00 m Quantifying Restoration Equation below describes the conveyance of the St. Clair River in CGLRRMEquation below describes the conveyance of the St. Clair River in CGLRRM We simulate the system with the Equation coefficients set to describe the current conveyance regime of the riverWe simulate the system with the Equation coefficients set to describe the current conveyance regime of the river to simulate system under restoration, we manipulate a coefficient in Equation to reduce conveyance of the riverto simulate system under restoration, we manipulate a coefficient in Equation to reduce conveyance of the river primarily, we consider ym SCprimarily, we consider ym SC

4 4 Q SC = K SC ((MH+SC)/2-ym SC ) a SC (MH-SC) b SC -IW Increase ym SC from 167.00 so that the long-term average MH lake level increases by 10, 25, 40, and 50 cm Restoration average is calculated over the final 55 years of the simulation ( ‘equilibrium’ is reached … MH stops filling) Quantifying Restoration Restoration impacts are assessed with CGLRRM+1958DD down to Montreal (Jetty1) simulating 109 years of lake levels based on 1900-2008 (historical) residual NBS In a sensitivity analysis, we will repeat with K SC (function of mean channel cross-section area and roughnessrather than ym SC In a sensitivity analysis, we will repeat with K SC (function of mean channel cross-section area and roughness) rather than ym SC

5 Outline of Restoration Scenarios factors we will vary to define scenarios include: – 10 cm, 25 cm, 40 cm, 50 cm restoration targets – static versus dynamic behaviour of Lake Superior – one-time (instantaneous) versus staged restoration – vary initial lake levels/NBS inflows to estimate worst-case downstream restoration impacts (Lake Erie  1930s, 1960s) – restoration via the ym SC versus the K SC coefficient # levels [4] [2] [3] [2] we do not evaluate impacts of all 4x2x2x3x2 = 96 combinations of factor levels we only evaluate impacts for some of these

6 Outline of Restoration Scenarios Unless otherwise noted, you can assume the following factor levels for all restoration results: – 10 cm, 25 cm, 40 cm or 50 cm restoration target (will be specified in all results) – static behaviour of Lake Superior – one-time (instantaneous) restoration at start of year 1 in simulation (year 1900 initial lake levels) – restoration via the ym SC (bottom level) coefficient

7 7 Restoration Scenarios Static Plan 77A for Superior releases: – Run 77A for the base case where ym SC = 167.00 m – Take the outflow of lake Superior – Study the effect of adjusting ym SC on Midlakes by simulating only Midlakes with static inflow to MH (outflow of Lake Superior constant at the base case) Dynamic 77A: – Study the effect of adjusting ym SC on Superior and Midlakes (Lake Superior with plan 77A as well as Midlakes) – here Lake Superior levels (through Plan 77A) are allowed to respond to restoration Static 77A deemed most representative of trying to restore Lake MH levels without changing/degrading Lake Superior levels

8 8 RESULTS for STATIC 77A Upstream Effects of Restoration Downstream Effects of Restoration

9 9 Lakes Michigan Huron Response to 1-TIME Restoration

10 10 JanFebMarAprMayJunJulAugSepOctNovDec (%) violating base case max-10cm res. 1.8 2.80.9

11 11 JanFebMarAprMayJunJulAugSepOctNovDec (%) violating base case max-10cm res. 1.8 2.80.9 (%) violating base case max-25cm res. 1.82.85.56.47.3 4.6 2.80.91.8 (%) violating base case max-40cm res. 6.49.2 11.011.910.18.36.42.81.83.7 (%) violating base case max-50cm res. 9.214.713.815.6 16.514.715.69.24.63.76.4 50 cm

12 MetricRest. lev.JanFebMarAprMayJunJulAugSepOctNovDec MH violating long-term base case max(%) 101.8 2.80.9 251.82.85.56.47.3 4.6 2.80.91.8 406.49.2 1111.910.18.36.42.81.8 3.7 509.214.713.815.6 16.514.715.69.24.63.76.4 Max Violation (cm) 10 25 4039 4039 5049 5049 12 1-Time MH Restoration – STATIC 77A Long-Term Upstream Effects more extreme flooding more frequently on Lake MH due to restoration

13 13 RESULTS for STATIC 77A Upstream Effects of Restoration Downstream Effects of Restoration

14 14 St. Clair River Response to 1-TIME Restoration

15 15 Lake St. Clair Response to 1-TIME Restoration

16 16 JanFebMarAprMayJunJulAugSepOctNovDec (%) violating base case min-10cm res. 000.9 0000000 (%) violating base case max-10cm res. 000000.9000000

17 17 JanFebMarAprMayJunJulAugSepOctNovDec (%) violating base case min-10cm res. 000.9 0000000 (%) violating base case max-10cm res. 000000.9000000 (%) violating base case min-50cm res. 0.9 1.80.9 00000 (%) violating base case max-50cm res. 00.9 0 000000

18 Long-term Impacts Downstream of Lake St. Clair Results again for Lake St. Clair All further downstream long term impacts look very much the same (0-2% increase in frequency for 50 cm restoration) focus attention on short-term impacts downstream JanFebMarAprMayJunJulAugSepOctNovDec (%) violating base case min-10cm res. 000.9 0000000 (%) violating base case max-10cm res. 000000.9000000 (%) violating base case min-50cm res. 0.9 1.80.9 00000 (%) violating base case max-50cm res. 00.9 0 000000

19 19 Detroit River Response to 1-TIME Restoration

20 20 Lake Erie Response to 1-TIME Restoration

21 21 Niagara River + Welland Canal Response to 1-TIME Restoration

22 22 Lake Ontario (Plan 58DD*) Response to 1-TIME Restoration

23 23 Lake Ontario Outflow Response to 1- TIME Restoration

24 24 Montreal Jetty1 Level Response to 1-TIME Restoration

25 25 Monthly Metric Res. Lv.SCERONJETSCRDRNiRONout cm cms Max decrease to base case 10753914512796190 251612425351310240540 4024191043541483379937 50302314546645954701157 Max decrease to base case min 101100393485 2531019180195 4042101361202915 5052211641453615 Max increase to base case 10112932 16223 253269777439233 405318911611359223 505328914013671223 Max increase to base case max 101010784 251011172210 40102127371550 102133471950 1-Time Restoration – STATIC 77A Short-Term Downstream Effects How are most extreme base case levels exacerbated Short-term impacts limited to ~10 yrs, max. impacts within year 1

26 Mitigating Short-term Downstream Impacts of Restoration

27 27 Staged vs 1-Time Restoration Short-term downstream impacts of restoration can be minimized by spreading them out (staging) over time essentially this means filling Lake MH more slowly We evaluate a staged 25 cm restoration case and compare to 1-time restoration (same principle applies to any restoration scenario) Staged restoration scenario evaluated: – 5 stages of restoration – each restoring 5 cm to Lake MH – each spaced in time by 5 years – thus, 20 yrs between start and end of physical restoration changes

28 28 Lakes Michigan Huron Response to 1- Time vs. STAGED Restoration Staged restoration accomplishes same thing as 1-time restoration in the long term

29 29 St. Clair River Response to 1Time vs. STAGED Restoration

30 30 Lake St. Clair Response to 1Time vs. STAGED Restoration

31 31 Detroit River Response to 1Time vs. STAGED Restoration

32 32 Lake Erie Response to STAGED Restoration

33 33 Niagara River + Welland Canal Response to STAGED Restoration

34 34 Lake Ontario Response to STAGED Restoration

35 35 Lake Ontario Outflow Response to STAGED Restoration

36 36 Jetty1 Response to STAGED Restoration

37 Staged Restoration Summary Findings 25 cm staged restoration can almost completely mitigate the negative downstream impacts of a one-time restoration similar concept applies to any other selected level of restoration exact mitigation extent is of course dependent on being able to stage whatever structural channel changes are selected minimal downstream impact restoration (staging) takes longer (25 yrs instead of 10 yrs in this example) 37

38 38 Sensitivity of Short-term Restoration Impacts to Initial Lake Levels/NBS variability Purpose here is assess worst case short-term downstream impacts due to a poorly-timed project [Worst case impacts upstream are in the long-term and so timing a project to start during a high water period will not be worse - all we would show is that it would be better to start project during high water period] How are impacts exacerbated if physical restoration changes are completed just before period of very low Lake Erie levels? Based on observed Lake Erie levels, there are two points in historical record to consider …

39 39 Simulated Lake Erie Level under Base Case “1930s” start “1960s” start

40 40 Starting the 10cm Restoration in Dry Period of the 30’s

41 41

42 42

43 43

44 44

45 45

46 46

47 47 Starting the 10cm Restoration in Dry Period in 60’s

48 48

49 49

50 50

51 51

52 52

53 53

54 54

55 Restoration start year Maximum monthly lake level decrease compared to base case (no-restoration) Annual average decrease to the base case in the first year after restoration cm 190053.5 193032.4 193120 193263.5 193365.2 193442.3 196142.3 196221.0 196320.3 196420.8 196543.0 196676.0 196754.3 Lake Erie Response to Various Starting Years of 1-TIME 10cm Restoration

56 56 Starting the 25cm Restoration in Dry Period in 30’s

57 57

58 58

59 59 Starting the 25cm Restoration in Dry Period in 60’s

60 60

61 61

62 Restoration start year Maximum monthly lake level decrease compared to base case (no-restoration) Annual average decrease to the base case in the first year after restoration cm 1900118.4 1930107.6 1933119.8 196175.2 19661211 62 Lake Erie Response to Various Starting Years of 1-TIME 25 cm Restoration

63 Summary of Sensitivity to Restoration Project Timing A worst-case poorly-timed 1-time 10 cm restoration might drop ‘record’ low Lake Erie levels by an additional 7 cm for ~1 year A worst-case poorly-timed 1-time 25 cm restoration might drop ‘record’ low Lake Erie levels by an additional 12 cm for ~1 year The above results require terrible timing and would be difficult to imagine in practice … just a few years difference can reduce impacts Nonetheless, staged restoration can guard against such worst-case impacts

64 64 RESULTS for Dynamic 77A Allow Lake Superior to respond to restoration Upstream Effects of Restoration Downstream Effects of Restoration

65 65 Lake Superior Response to 1-TIME Restoration

66 66 JanFebMarAprMayJunJulAugSepOctNovDec (%) violating base case max-10cm res. 0.9 1.80.9 (%) violating base case max-25cm res. 0.9 1.8 4.62.80.9 (%) violating base case max-40cm res. 0.9 1.82.84.69.24.61.80.9 (%) violating base case max-50cm res. 0.9 4.69.27.310.18.31.80.9 16 cm

67 67 Monthly metric Res. Lv.SUPMHSM cm cms Max increase to base case 10412547 251029739 401445782 501656800 Max increase to base case max 1031112 259 94 401339123 501650152 Max decrease to base case 1010489 2511744 4001733 5001726 Max decrease to base case min 10000 25001 40001 50002 1-Time MH Restoration DYNAMIC 77A Upstream Effects How are most extreme base case levels exacerbated

68 68 RESULTS for Dynamic 77A Upstream Effects of Restoration Downstream Effects of Restoration

69 69 St. Clair River Response to 1-TIME Restoration

70 70 Lake St. Clair Response to 1-TIME Restoration

71 71 Detroit River Response to 1-TIME Restoration

72 72 Lake Erie Response to 1-TIME Restoration

73 73 Niagara River + Welland Canal Response to 1-TIME Restoration

74 74 Lake Ontario Response to 1-TIME Restoration

75 75 Lake Ontario Outflow Response to 1-TIME Restoration

76 76 Jetty1 Response to 1-TIME Restoration

77 77 Monthly metric Res. Lv.SCERONJETSCRDRNiR cm cms Max decrease to base case 107-75-53-29-9145-145127-12796-100 2516-1612-124-425-25351-351310-310240-243 4024-2519-1910-1143-43541-542483-483379-383 5030-3123-2414-1654-54664-668595-595470-478 Max decrease to base case min 101-11-00-0 39-3634-328-0 253-31-00-01-191-9580-8319-0 404-42-01-00-1136-142120-12629-3 505-52-02-01-1164-166145-14536-8 Max increase to base case 101-21-12-39-932-39 16-23 253-32-26-69-977-8574-8239-46 405-53-318-189-9116-125113-12259-69 505-63-428-289-9140-164136-15871-88 Max increase to base case max 101-10-11-00-17-188-184-20 251-10-01-1 17-2022-3410-32 401-10-02-11-127-2837-4315-32 501-10-02-11-233-3247-4919-32 1-Time MH Restoration Short-Term Downstream Effects STATIC vs. DYNAMIC 77A How are most extreme base case levels exacerbated

78 Summary of Dynamic vs Static Plan 77a Dynamic Plan 77a implies Lake MH restoration will permanently increase Lake Superior levels The ‘filling’ of both Superior and Lake MH shows very minimal downstream impacts in comparison with Static 77a We have assumed Static 77a represents most likely approach to restoration However, if Dynamic 77a (restoring Superior) was desired restoration goal then Dynamic 77a results should be repeated with more realisitic Dynamic 77a plan parameters … no plans to do this

79 79 Sensitivity of Restoration Impacts to Coefficient Adjusted in St. Clair River Eqn

80 80 Q SC = K SC ((MH+SC)/2-ym SC ) a SC (MH-SC) b SC -IW K SC : St. Clair River outflow equation coefficient (default 186.90) A function of mean channel cross-section area and roughness mimic reducing channel width instead of increasing bottom elevation mimic reducing channel width instead of increasing bottom elevation Evaluate sensitivity with Static 77A, 10cm and 25 cm restoration Sensitivity of Restoration Impacts to Coefficient Adjusted in St. Clair River Eqn

81 81

82

83 83 Rest. level Monthly deviation between results of adjusting two different parameters MHSCERONJETSCRDRNiRONout cmcms 10 max. positive deviation1113511 8108 max. negative deviation1112914139223 Average deviation0.0 0.1 25 max. positive deviation221320292819408 max. negative deviation22131133 24265 Average deviation0.0 0.30.40.3 Sensitivity of Restoration Impacts to Coefficient Adjusted in St. Clair River Eqn except for Jetty1 at Montreal, pretty limited downstream differences in findings except for Jetty1 at Montreal, pretty limited downstream differences in findings at Jetty1 these are extreme deviations at Jetty1 these are extreme deviations Results/Impacts should generally be representative of a variety of physical changes to St. Clair river Results/Impacts should generally be representative of a variety of physical changes to St. Clair river

84 84 Conclusions

85 85 Summary of Upstream Impacts of One-time Restoration (Static 77a) Full upstream impacts only realized after initial period of “filling” for Lake MH, which is roughly 10- 15 yrs Restoration will result in more extreme flooding more frequently on Lake MH depending on restoration level: – for 10 cm restoration, base case extreme monthly levels will be exceeded 1-3% of the time – for 50 cm restoration, base case extreme monthly levels will be exceeded upwards of 15% of the time Increased flooding level corresponds to restoration amount (cm)

86 86 Summary of Downstream Impacts of One-time Restoration (Static 77a) Downstream impacts are short-term due to holding water back to “fill” Lake MH, roughly 10-15 yrs Short-term downstream impacts vary based on restoration level and impact location but they can be significant – in particular for larger restorations Short-term downstream impacts can be greatly reduced with staged restoration and advanced planning on Lake Ontario – for example 25 cm staged restoration can almost completely mitigate the negative downstream impacts of a one-time restoration

87 Conclusions on Project Timing A worst-case poorly-timed 1-time 10 cm restoration might drop ‘record’ low Lake Erie levels by an additional 7 cm for ~1 year A worst-case poorly-timed 1-time 25 cm restoration might drop ‘record’ low Lake Erie levels by an additional 12 cm for ~1 year The above results require terrible timing and would be difficult to imagine in practice … just a few years difference can reduce impacts Nonetheless, staged restoration can guard against such worst-case impacts

88 88 Limitations of the Analysis The hydraulic behaviour of the eventual physical structure/channel modifications to accomplish restoration is not simulated here This analysis assumes that an increase to the channel bottom elevation and the corresponding simulation with CGLRRM roughly approximates the overall system response to a structural change in the St Clair River Before any physical restoration work is initiated, more accurate impacts for the actual physical structure/channel modifications should be evaluated by hydraulic modelling

89 Finalize this in report for the board ASAP THANKS … questions?

90 APPENDICES

91 91 Summary of Bottom Level Coefficient of St. Clair (ym SC ) for Static 77A Restoration on MH (cm)Bottom level of SC (m)Bottom level change in SC to the base case (cm) 0 (base case)167.000.00 10167.2020 25167.4848 25 - staged167.4848 40167.7474 50167.9090

92 Monthly Metric 25 cm restoration Scenarios SCERONJetSCRDRNiR cmcms Max decrease to base case 1-Time 1612425351310240 Staged 324191069246 Max decrease to base case min 1-Time 3101918019 Staged 3101918019 Max increase to base case 1-Time 3269777439 Staged 39510777439 Max increase to base case max 1-Time 1011172210 Staged 1011172210 92 EDIT*** 1-Time vs. Staged 25cm MH Restoration – STATIC 77A Short-Term Downstream Effects

93 Full Dynamic 77A Results

94 94 Lake Superior Response to 1-TIME Restoration

95 95 JanFebMarAprMayJunJulAugSepOctNovDec (%) violating base case max-10cm res. 0.9 1.80.9 (%) violating base case max-25cm res. 0.9 1.8 4.62.80.9 (%) violating base case max-40cm res. 0.9 1.82.84.69.24.61.80.9 (%) violating base case max-50cm res. 0.9 4.69.27.310.18.31.80.9 16 cm

96 96 St. Marys River Response to 1-TIME Restoration

97 97 JanFebMarAprMayJunJulAugSepOctNovDec (%) violating base case max-10cm res. 0.0 0.9 0.0 1.82.80.0 (%) violating base case max-25cm res. 0.90.0 0.94.60.9 3.7 0.90.0 (%) violating base case max-40cm res. 0.90.0 0.94.62.80.91.82.8 0.0 (%) violating base case max-50cm res. 1.80.0 4.61.80.93.72.83.70.0

98 98 Lakes Michigan Huron Response to 1-TIME Restoration

99 99 JanFebMarAprMayJunJulAugSepOctNovDec (%) violating base case max-10cm res. 1.8 2.80.9 (%) violating base case max-25cm res. 1.83.74.66.47.3 4.6 2.80.91.8 (%) violating base case max-40cm res. 6.49.2 11.0 10.16.41.8 3.7 (%) violating base case max-50cm res. 10.114.715.614.716.518.416.5 10.14.63.77.3 50 cm

100 100 Monthly metric Res. Lv.SUPMHSM cm cms Max increase to base case 10412547 251029739 401445782 501656800 Max increase to base case max 1031112 259 94 401339123 501650152 Max decrease to base case 1010489 2511744 4001733 5001726 Max decrease to base case min 10000 25001 40001 50002 1-Time MH Restoration DYNAMIC 77A Upstream Effects

101 101 St. Clair River Response to 1-TIME Restoration

102 102 Lake St. Clair Response to 1-TIME Restoration

103 103 Detroit River Response to 1-TIME Restoration

104 104 Lake Erie Response to 1-TIME Restoration

105 105 Niagara River + Welland Canal Response to 1-TIME Restoration

106 106 Lake Ontario Response to 1-TIME Restoration

107 107 Lake Ontario Outflow Response to 1-TIME Restoration

108 108 Jetty1 Response to 1-TIME Restoration

109 109 Monthly metric Res. Lv.SCERONJETSCRDRNiR cm cms Max decrease to base case 107-75-53-29-9145-145127-12796-100 2516-1612-124-425-25351-351310-310240-243 4024-2519-1910-1143-43541-542483-483379-383 5030-3123-2414-1654-54664-668595-595470-478 Max decrease to base case min 101-11-00-0 39-3634-328-0 253-31-00-01-191-9580-8319-0 404-42-01-00-1136-142120-12629-3 505-52-0 1-1164-166145-14536-8 Max increase to base case 101-21-12-39-932-39 16-23 253-32-26-69-977-8574-8239-46 405-53-318-189-9116-125113-12259-69 505-63-428-289-9140-164136-15871-88 Max increase to base case max 101-10-11-00-17-188-184-20 251-10-01-1 17-2022-3410-32 401-10-02-11-127-2837-4315-32 501-10-02-11-233-3247-4919-32 1-Time MH Restoration Short-Term Downstream Effects STATIC vs. DYNAMIC 77A

110 110 STATIC 77A vs. Dynamic 77A Restoration on MH (cm)Bottom level of SC (m)Bottom level change in SC to the base case (cm) 0 (base case)167.000 10167.2020-20 25167.4848-48 40167.7474-74 50167.9090-90

111 Substitution for slides: 21, 33, 72, 89

112 112 Monthly Metric 15 years after rest. Res. Lv.SCERONJETSCRDRNiRONout cm cms Max decrease to base case 10752914512796190 251612425351310240540 4024191043541483379937 50302314546645954701157 Max decrease to base case min 1000000000 2500000000 4000000000 5000000000 Max increase to base case 1011243127785 251164716316108 4021184116942498 503128512811330100 Max increase to base case max 1000000000 2500000000 4000000000 5000000000 1-Time MH Restoration – STATIC 77A Short- Term Downstream Effects

113 Monthly Metric 25 cm restoration Scenarios SCERONJetSCRDRNiR cmcms Max decrease to base case 1-Time1612425351310240 Staged 3246848146 Max decrease to base case min 1-Time 0000000 Staged 0000000 Max increase to base case 1-Time1164716316 Staged 1213262143 Max increase to base case max 1-Time 0000000 Staged 0000000 113 1-Time vs. Staged 25cm MH Restoration – STATIC 77A Short-Term Downstream Effects

114 114 MetricScenario SCERONJETSCRDRNiRONout cmcms Maximum monthly lake level decrease compared to base case (no-restoration) 0651714512796155 1432485805880 2221271723040 Annual average decrease to the base case in the first year after restoration 054041141127281 1320265645246 2210043 145

115 115 1-Time MH Restoration Short-Term Downstream Effects STATIC vs. DYNAMIC 77A Monthly Metric 15 years after rest. Res. Lv.SCERONJETSCRDRNiRONout cm cms Max decrease to base case 107-75-52-29-9145-145127-12796-100190-202 2516-1612-124-425-25351-351310-310240-243540-540 4024-2519-1910-1143-43541-542483-483379-383937-938 5030-3123-2414-1654-54664-668595-595470-4781157-1157 Max decrease to base case min 100-0 250-0 400-0 500-0 Max increase to base case 101-11-02-24-131-3127-277-585-15 251-11-06-64-471-6863-5916-11108-78 402-21-118-184-3116-10194-8724-1698-50 503-21-128-285-3128-118113-10130-17100-58 Max increase to base case max 100-0 250-0 400-0 500-0

116

117

118

119


Download ppt "1 Restoring Water Levels on Lakes Michigan-Huron: Impact Analysis IUGLS Study Board Meeting Windsor, ON Nov 30, 2010 Bryan Tolson 1 Masoud Asadzadeh Saman."