Presentation is loading. Please wait.

Presentation is loading. Please wait.

1 FP7 ICT Work Programme 2009-10 Update NCP Meeting, 12 May 2009.

Similar presentations


Presentation on theme: "1 FP7 ICT Work Programme 2009-10 Update NCP Meeting, 12 May 2009."— Presentation transcript:

1 1 FP7 ICT Work Programme 2009-10 Update NCP Meeting, 12 May 2009

2 2 WP 2009-10 Update Limited revision to take into account ICT contribution to Public Private Partnerships (PPP) for R&D in the European Economic Recovery Plan (EERP) –‘Factories of the Future’ –‘Energy-Efficient Buildings’ –‘Green Cars’ ‘Supplements to Strengthen Cooperation in ICT R&D in an Enlarged Europe’ –Adding partners to on-going FP7 projects

3 3 Series of coordinated calls between the relevant FP7 themes, reflecting industry-driven research roadmaps and priorities –Each theme describes its contribution in a separate section of the theme's WP –In addition, a general Annex V to the WP will provide an overview of all contributions to each PPP PPPs in EERP: Planned Implementation Approach

4 4 ‘Factories of the Future’ Combined envelope of ~€1.2 bn –’to help EU manufacturers across sectors, in particular SMEs, to adapt to global competitive pressures by increasing the technological base of EU manufacturing’ R&D in production technologies, materials and ICT, including: –'Smart' factories: agile manufacturing and customisation process automation, control and optimisation, robotics … –'Virtual' factories: global networked operations supply chain management, product-service linkages, management of distributed manufacturing assets … –'Digital' factories: optimised design of systems and processes modelling, simulation, visualisation, lifecycle and knowledge management …

5 5 ‘Factories of the Future’ in Call 5 10.1: Smart Factories: ICT for agile and environmentally-friendly manufacturing a)Integrated process automation and optimisation shopfloor-based platforms and systems … b)Real-time monitoring of energy use and material flow context-aware ICT applications and scalable sensor networks integrated in machines and factory-level infrastr. c)Robotics-enabled production processes robotic prototypes in smart factory environments … d)Laser applications laser systems in processes and production … e)Coordination Action industrial learning and roadmapping across industries … a) – d): integration + validation 35 M€

6 6 (M€)ICTNMP 20103560 2011 210340 2012 2013 Total645 Draft indicative budget envelopes: ‘Factories of the Future’ Budget

7 7 ‘Energy-Efficient Buildings’ Combined envelope of ~€1 bn –’to promote green technologies and the development of energy-efficient systems and materials in new and renovated buildings with a view to reducing radically their energy consumption and CO2 emissions’ Non-R&D measures –Regulatory and standardisation components; Procurement network of regional and local authorities R&D in energy, environmental, production technologies, materials, nanotechnologies and ICT, including: –Monitoring and control of energy consumption –Advanced lighting systems –Smarter and optimised interconnections with the power grids

8 8 ‘Energy-Efficient Buildings’ in Call 5 10.2: ICT for energy-efficient buildings and spaces of public use a)Integrated ICT-based management and control systems governing lighting/heat exchange/air treatment subsystems deployed in spaces of public use interoperating with security/safety/comfort subsystems b)Coordination Action reviewing needs, roadmapping … a): systems integration + validation 15 M€

9 9 (M€)ICTNMPEnergyEnv 20101530155 2011 9022011020 2012 2013 Total505 Draft indicative budget envelopes: ‘Energy-Efficient Buildings’ Budget

10 10 ‘Green Cars’ Combined envelope of >€5 bn –’to achieve a breakthrough in the use of renewable and non- polluting energy sources, safety and traffic fluidity’ Non-R&D measures –Loans to car producers and suppliers; Reduction of taxes for lower emission cars and for scrapping old cars; Procurement network of regional and local authorities to pool demand for clean buses R&D (~€1 bn) in transport, energy, environmental and production technologies, materials and ICT, including: ICT for Fully Electric Vehicles –Battery management and power supply –Control mechanisms –Interconnections with the transport and power infrastructures

11 11 ‘Green Cars’ in Call 5 10.3: ICT for the Fully Electric Vehicles Highly energy-efficient ICT components and solutions for FEVs a)Solutions for overall efficiency gains in electric vehicle –electrical and thermal management, electrified auxiliaries, closed-loop control and cooperative interaction … b)Safe and robust subsystems –communication, sensors, actuators, distributed controls, power electronics, active safety and comfort … c)Fail-safe systems and electrical architectures, vehicle-to-road infrastructure integration … d)Coordination Action –reviewing needs, roadmapping … a) – c): optimisation at vehicle and system level + simulation, testing … 20 M€

12 12 (M€)ICTTransportEnergyNMPEnv 2010204515105 2011 90175355045 2012 2013 Total490 Draft indicative budget envelopes: ‘Green Cars’ Budget

13 13 Supplements to Strengthen Cooperation in ICT R&D in an Enlarged Europe Target outcome Reinforced cooperation between research teams across the enlarged Europe and strengthened integration of the ERA in ICT Increased level of expertise, broadened scope and/or accelerated developments Expected Impact Reinforced cooperation and better exploitation of ICT R&D synergies – and wider participation in EU-supported ICT research projects – across the enlarged Europe Strategic partnerships in view of gaining access to knowledge, developing standards and interoperable solutions and strengthening European competitiveness Implementation Additional funding and partners to on-going FP7/ICT IP/STREP projects ending after April 2011 10 M€

14 14 Time table  2/4 2009: 1 st draft WP 2009-2010 Update to ICTC  20/4: ICTC meeting: oral comments on 1 st draft  23/4: Deadline for written ICTC comments on 1 st draft  29/4: 2 nd draft to ICTC  13/5: ICTC meeting: informal opinion on 2 nd draft  May: Interservice consultation  June: ICTC opinion by written procedure  31/7: Commission decision and Call 5 publication  24/11 2009: Call 6 publication


Download ppt "1 FP7 ICT Work Programme 2009-10 Update NCP Meeting, 12 May 2009."

Similar presentations


Ads by Google