Download presentation
Presentation is loading. Please wait.
Published byDarren Carter Modified over 9 years ago
2
NIOC Investment Opportunities in Oil and Gas Upstream, Midstream& Downstream
3
Introduction The growing energy market in recent years indicates that the energy future is unsustainable and needs more attention by suppliers and consumers, Energy security could not be materialized without suppliers and consumers cooperation. Required financial sources can not be provided only by producing countries. The I.R. of Iran should play an even more important role to fulfill global energy needs in the future. This report presents you the important factors can be attract your attention.
4
NIOC Main Policies Human resources & knowledge development
Creating computational environment through privatization and deregulation Iran’s role improvement in energy markets & international interactions as a supplier O il & gas activities commercialization Utilization of Iranian’ geo energy advantages
5
Affecting Factors on NIOC’s planning
1- Increasing exploration activities in all regions of the country (top priority in joint fields); Increasing development activities in oil and gas fields (top priority of NIOC is respectively joint fields, brown fields and then green fields development); Increasing recovery factors of oil and gas fields;
6
Breakdown of in-place Hydrocarbons Reserves in Iran
(Year 2008) Total : oil equivalent
7
Breakdown of Recoverable Hydrocarbons Reserves in Iran
(Year 2008) Gas : TCM Liquid : MMBBLs
8
Recoverable Exploration of Oil & Gas Plan
( ) Oil:bn bbl Gas: bcm Project 2009 2014 2019 2024 Exploration of Oil & Gas (Onshore & Offshore) including Persian Gulf Oil 500 400 300 Gas 120 141 173 210 Caspian Sea Exploration 200 150 100 20
9
Crude Oil Production Plan (2009-2024)
Year 2009 2014 2019 2024 Total 4.4 5.3 5.1 4.2 9 9
10
Crude Oil Production Plan Including IOR/EOR (2009-2024)
10 10
11
Prediction of Crude Oil Supply and Demand Balance (2009- 2024)
MMbbl/d Title 2009 2014 2019 2024 Average Crude Oil Production (planned) 4.4 5.3 5.1 4.2 (using IOR/EOR) 0.2 0.4 1.3 Demand: Total Refinery Feed 1.6 2.5 2.7 Total Export (Direct & Buy Back) 2.8 2.6 1.5
12
Rich Gas Production Plan (2009-2024)
Year 2009 2014 2019 2024 Total 719 1509 1754 1820
13
New Exploration and Development Projects (E&D)
14
Development Plans of Oil and Gas (2005 – 2024)(1)
Exploration: Exploration of new oil fields : 500 million barrels/year Exploration of new gas fields : 150 BCM/year * exploration and development of 17 new blocks (12 onshore and 5 offshore) Onshore Fields: Oil Development of 28 oil fields Development of possible gas fields from new exploration activities (onshore) Gas Development of 14 gas fields Development of gas formations of more than 10 oil fields Development of possible gas fields from new exploration activities (onshore)
15
Development Plans of Oil and Gas (2005 – 2024)(2)
Production of Oil and Gas Offshore Fields: Oil Development of 7 oil fields Development of possible oil fields from exploration blocks Development and gas injection in two oil field Gas Development of 15 gas fields development of at least 16 new standard phases of South Pars gas field Development of possible gas fields from exploration activities (offshore)
16
Gas and Water Injection Plan
( ) Gas: MMcm/d Water: Mbbl/d Injection 2009 2014 2019 2024 Gas 177 271 265 238 Water 650
17
Investment priorities in oil and gas upstream activities
Common oil & gas fields Brown oil & gas fields: Production capacity maintenance More development Secondary oil recovery (gas & water injection) Green oil & gas fields
18
Technological challenges in oil & gas upstream
Deep – water oil fields (e.g. Caspian Sea) Non- conventional oil fields (e.g. Ferdowsi oil field) Very heavy oil fields (e.g. Yadavaran) Transfer of New technologies
19
Upstream projects
20
Main Upstream Projects –Ultra Heavy Oil Fields
API Gravity Oil Recovery Oil in Place Geographic Position No of Well Name Jahrom-8-10 API Sarvak API 871.5*106 BBL 6.63* 109 BBL 80 KM to Boushehr 8 well first well: 1311 Kohe Mond 14 API 268.5*106 BBL 1.729 *109 BBL South- west of the country 2 well first well : 1371 Zagheh 6-16 API 2250*106 BBL Crude Oil: 31* 109 BBL Gas : F3 Central of Persian Golf 2well first well : 1344 Ferdowsi
21
Main Upstream Projects –Oil Fields
API Gravity Oil Recovery Oil in Place Geographic Position No of Well Name 23.6 API 7.7 *10 6 BBL 26 *10 6 BBL 100 Km to south – east of Shiraz 1 Well 1342 Boushkan 3.9 *10 6 BBL 13 *10 6 BBL 50 Km to south – east of Khark Boushehr Asmari:28.3 Sarvak:25API Asmari:23.1 Sarvak:27*10 6 BBL Asmari:371 Sarvak:374*10 6 BBL 40 Km to North – East of Kohemond 1352 Koh Kaki 36 API 38.9 *10 6 BBL 155.6*10 6 BBL West of Central aria of Iran 14 Well first-1335 Alborz 404*10 6 BBL 6421 *10 6 BBL 80 Km to west of Ahvaz 2 Well first-1378 North of Azadegan API 47.32 *10 6 BBL 419.5 *10 6 BBL At Persian Golf near Asaloyeh Port 1386 East Asaloyeh 34-35 API 196*10 6 BBL 2451*10 6 BBL At state of Ilam fIrst: 1358 Azar
22
Main Upstream Projects –Oil Fields
API Gravity Oil Recovery Oil in Place Geographic Position No of Well Name 24 API Oil: 199*10 6 BBL Oil: 1531*10 6 BBL At dezful – Khoozestan Province 1 well 1381 Bande Karkhe Oil:29.3 API Oil: 147*10 6 BBL Gas : 4.19*10 12 ft3 Oil: 580*10 6 BBL Gas : 6.25*10 12 ft3 At Persian Golf 50 miles to Lavan Island 3 well First: 1346 Balal 23 API Oil: 184.5*10 6 BBL Oil: 1230*10 6 BBL At Elam province – border of Irag 2 well First : 1341 Changooleh
23
Main Upstream Projects – Gas Fields- On Shore
Gas Recovery Gas in Place Geographic Position No of Well Name 5.46*10 12F3 21*10 12F3 At Lorestan state 1 Well 1353 Kabir Kooh 2.087*10 12F3 2.878*10 12F3 At Persian Golf- east of Kangan 2 Well Firrst:1365 Asaloyeh 1.167*10 12F3 1.668*10 12F3 Gheshm Island 5 Well Salakh 2.65*10 12F3 4.9*10 12F3 North-East of Yasoj 1369 Mokhtar 1*10 12F3 1.45*10 12F3 42 Km to Gilanegharb Firrst:1352 Babaghir 0.89*10 12F3 1.2*10 12F3 15 Km to Bandarabbas Soro 2.752*10 12F3 3.669*10 12F3 140 Km to South of Shiraz 1378 Dey 3.067*1012F3 3.983*10 12F3 135 Km to South – west of Shiraz Firrst:1357 Gordan
24
Main Upstream Projects – Gas Fields- Off Shore
Gas Recovery Gas in Place Geographic Position No of Well Name 452.7*10 12Ft3 559.1*10 12Ft3 At Persian Golf – border of Gatar More than 100 First: 1342 South Pars Gas Field 15.6*10 12Ft3 21.9*10 12Ft3 At Persian Golf – border of Saudi Arabia 2 Well 1345 Fazad B- Farsi 4.056*10 12Ft3 5.156*10 12Ft3 70 Km to west of Bandarabbas 4 Well First: 1355 South - Gashow 35.543*10 12Ft3 47.360*10 12Ft3 At Persian Golf nera Lavan Island first 1347 Kish At Persian Golf -border of Iran, Kuwait And Saudi Arabia Arash
25
Midstream projects
26
Gas Export Projects by Pipeline
(2005 – 2024) (1) Country Max. Delivery (MMcm/d) Start Year Turkey 27.4 2001 Armenia 4 2007 United Arab Emirates (Crescent) 12.3 - Kuwait 8.6 2011 Oman 28 Bahrain 2012
27
Gas Export Projects by Pipeline
(( ) (2 Country Max. Delivery (MMcm/d) Start Year Pakistan 30 2014 India Syria 2.3 2010 Europe 50
28
Liquefied Natural Gas projects (2009-2024)
IRAN-LNG: Capacity 10.7 MMt/y(54 MMcm/d) Persian-LNG: Capacity 16.2 MMt/y(78 MMcm/d) Pars-LNG : Capacity 10 MMt/y (54 MMcm/d) CNOOC-China: Capacity 20 MMt/y(113 MMcm/d) SKS-Malaysia: Capacity 10 MMt/y(57 MMcm/d) Total: Capacity 66.9MMt/y(356MMcm/d)
29
(Clean Development Mechanism)
Other Projects CDM Projects (Clean Development Mechanism)
30
The Most Important CDM Projects of NISOC Associated Gas (MMcf/d)
No. Project Associated Gas (MMcf/d) Costs MMUSD Finish year Location Project Status 1 BINAK 13 30 2004 Khoozestan 100% Completed 2 RAMSHIR 4 5.5 3 AMAK 241 531 2006 ~ 99% Completed GHALE NAR 11 2009 ~ 30% Completed 5 NARGESI 19 40 2007 80% Completed 6 LAB SEFID 18 In Tender 7 HAFT SHAHIDAN 34 50 2010 Basic Engineering Tot. - 340 726.5
31
The Most Important CDM Projects of IOOC Associated Gas (MMcf/d)
No Project Associated Gas (MMcf/d) Costs MMUS D Finish year Location Project Status 1 KHARG & BAHREGA N 541 2182 2012 Persian Gulf ~ 30% Completed 2 SIRI 132 525 2009 ~ 60% Completed 3 Reshadat 25 763 2010 ~ 20% Completed 4 Hangam 45 488 ~ 80% Completed Tot . - 673 2707
32
The Most Important CDM Projects of ICOFC Associate d Gas (MMcf/d)
No. Project Associate d Gas (MMcf/d) Costs MMUS D Finish year Location Project Status 1 CHESHME KHOSH 110 280 2009 Kermansha h Basic Design 2 Paydar & Paydar e Gharb 3 Dehloran 4 Serkan & Malekou 5 Khesht 6 Sarvestan & Saadat Abad 7 Naft Shahr Tot. -
33
NIOC Oil and Gas Investment
( ) Buy Back oil projects bn$ Buy Back gas projects & consumption optimization bn$ Finance bn$ Total bn$ Internal financial sources bn$ (NIOC own investment) Grand Total bn$
34
Financial Requirement
35
Thank you
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.