Facilities Condition Assessment Initiated: February 2004 Consultant: ISES Corporation Stone Mountain, GA Scope: Identify the conditions of our facilities,

Similar presentations


Presentation on theme: "Facilities Condition Assessment Initiated: February 2004 Consultant: ISES Corporation Stone Mountain, GA Scope: Identify the conditions of our facilities,"— Presentation transcript:

1 Facilities Condition Assessment Initiated: February 2004 Consultant: ISES Corporation Stone Mountain, GA Scope: Identify the conditions of our facilities, quantify the deficiencies, and provide a database of the information.

2 Facilities Condition Assessment Overview Definition of building-related terms Information for college/departmental space planning Tools for decision-making

3 Facilities Condition Assessment The following 10 systems/components were evaluated: Accessibility (ADA) Electrical Systems Exterior Structure/Roof Systems Fire/Life Safety Health/Food Service/Hazardous Materials

4 Facilities Condition Assessment Systems/components (cont): Heating, Ventilating, and Air Conditioning Systems Interior/Finish Systems Plumbing Systems Site-immediately surrounding the building Vertical Transportation (elevators, chair lifts)

5 Facilities Condition Assessment Project classifications: Capital Renewal – Major repairs or replacement/rebuilding of major components. Deferred Maintenance – Repairs that were not accomplished as a part of normal maintenance or capital repair. Plant Adaption – Work required to adapt the facility to the evolving needs of the institution and/or to changing standards.

6 Facilities Condition Assessment Priority Classifications: Priority 1: currently critical (year 1) Priority 2: potentially critical (year 2) Priority 3: necessary, not yet critical (years 3 – 5) Priority 4: recommended (years 6 – 10) Priority 5: does not meet current codes/standards, but is exempt because it met the codes at the time of construction.

7 Facilities Condition Assessment Info for Planning & Decision Making Summary Reports: http://www.facilities.uiowa.edu/BldgCoordExchange/index.htm Narrative report = Building Summary Information Cost summary = Building Systems Costs Printed ISES building reports

8 F acility C ondition N eeds I ndex Deferred Maintenance + Capital Renewal + Plant Adaption Facility Replacement Cost Facilities Condition Assessment

9 Provides the Institution… – Common Language – Total-Cost-Of-Ownership Decision Making Model – Board Policy Changes on Stewardship – Project Impact Examples Art Building Phase II Chemistry Renovation Old Music / Seashore Hall

10 Facilities Condition Assessment Deferred Maintenance Funding – Priorities = f(FCA, operations, concurrent projects) – Priorities = Roofs, Energy Conservation FSES Funding – Priorities = State Fire Marshall reports – Priorities = f(FCA, operations, concurrent projects)

11 Questions? Facilities Condition Assessment