Presentation is loading. Please wait.

Presentation is loading. Please wait.

ILC Project status Philip Burrows John Adams Institute Oxford University 1.

Similar presentations


Presentation on theme: "ILC Project status Philip Burrows John Adams Institute Oxford University 1."— Presentation transcript:

1 ILC Project status Philip Burrows John Adams Institute Oxford University 1

2 International Linear Collider (ILC) 31 km c. 250 GeV / beam 2

3 ILC Technical Design Report Strong JAI leadership + Andrei Seryi

4 2013 Nobel Prize in Physics 4

5 LHC discovery 2012 5

6 6 Finger-printing the new boson Determine its ‘profile’: Mass Width Spin CP nature Coupling to fermions Coupling to gauge bosons Yukawa coupling to top quark Self coupling  Higgs potential

7 Higgs et al Mechanism 7

8 8 Finger-printing the Higgs boson Is it: the Higgs Boson of the Standard Model? another type of Higgs boson? something that looks like a Higgs boson but is actually more complicated?

9 9 Finger-printing the Higgs boson Is it: the Higgs Boson of the Standard Model? another type of Higgs boson? something that looks like a Higgs boson but is actually more complicated?  Measurements of the Higgs couplings to the different species of quarks, leptons and gauge bosons are the key to answering these questions

10 e+e- Higgs factory e+e- annihilations: E > 91 + 125 = 216 GeV E ~ 250 GeV E > 91 + 250 = 341 GeV E ~ 500 GeV

11 11 e+e- annihilations 2E > 220 GeV E E  20,000 H / year

12 12   e+e- annihilations 2E > 350 GeV E E  100,000 t / year

13 13 ILC Higgs/top Factory Roadmap 250 GeV: Higgs Mass, Spin, CP nature Absolute meas. of HZZ BRs Higgs  qq, ll, VV 350 GeV: Top quarks + Higgs Top threshold: mass, width, anomalous couplings … (more stats on Higgs BRs) 500 GeV: Higgs HWW coupling  total width  absolute couplings Higgs self coupling Top Yukawa coupling

14 14 Higgs coupling map (Fujii)

15 Japanese Initiative They are very serious!

16 Japanese Initiative They are very serious! Japanese PP community has been consistent in assigning high priority to linear collider

17 Japanese Initiative They are very serious! Japanese PP community has been consistent in assigning high priority to linear collider National policy initiative for major infrastructure investment, especially in tsunami-affected area

18 ILC Plan in Japan Yamamoto

19 Japanese Initiative They are very serious! Japanese PP community has been consistent in assigning high priority to linear collider National policy initiative for major infrastructure investment, especially in tsunami-affected area Govt. is doubling amount of cash within 3 years!

20 Japanese Initiative They are very serious! Japanese PP community has been consistent in assigning high priority to linear collider National policy initiative for major infrastructure investment, especially in tsunami-affected area Govt. is doubling amount of cash within 3 years! Japan physics community proposed to host ILC

21 ILC Plan in Japan ► Japanese HEP community proposes to host ILC based on the “staging scenario” to the Japanese Government.  ILC starts as a 250GeV Higgs factory, and will evolve to a 500GeV machine.  Technical extendability to 1TeV is to be preserved. Yamauchi

22 Japanese Initiative They are very serious! Japanese PP community has been consistent in assigning high priority to linear collider National policy initiative for major infrastructure investment, especially in tsunami-affected area Govt. is doubling amount of cash within 3 years! Japan physics community proposed to host ILC Site recommendation made September 2013

23 ILC Plan in Japan ► Japanese HEP community proposes to host ILC based on the “staging scenario” to the Japanese Government.  ILC starts as a 250GeV Higgs factory, and will evolve to a 500GeV machine.  Technical extendability to 1TeV is to be preserved. Yamauchi

24 Japanese Initiative They are very serious! Japanese PP community has been consistent in assigning high priority to linear collider National policy initiative for major infrastructure investment, especially in tsunami-affected area Govt. is doubling amount of cash within 3 years! Japan physics community proposed to host ILC Site recommendation made September 2013 Political approaches to USA + EU

25 25 Developments in Japan Yamamoto, HEPAP, 11/3/13

26 Kitakami Site 26

27 Kitakami Site: IP region 27

28 Local enthusiasm 28

29 Kitakami Site: IP area 29

30 Kitakami Site: IP 30

31 Kitakami Site: IP 31

32 Kitakami Site: IP 32

33 Kitakami Site: IP surface facilities 33

34 Kitakami Site: JAI house 34

35 Kitakami Site 35

36 Kitakami Site: road to port 36

37 Local news 37

38 Local news 38

39 Local enthusiasm 39

40 Local enthusiasm 40

41 UK strategy on ILC 41

42 PPAP recommendation ‘It is essential that the UK engages with the Higgs Factory initiative and positions itself to play a leading role should the facility go ahead.’ 42

43 STFC Programmatic Review positive words on UK participation in Japan Higgs Factory LCUK submitted SoI to STFC - reviewed favourably by Science Board (July 2014) LCUK invited to submit (modest) proposal (Sept 2014) LCUK 43

44 LCUK proposal 44

45 STFC Programmatic Review positive words on UK participation in Japan Higgs Factory LCUK submitted SoI to STFC - reviewed favourably by Science Board (July 2014) LCUK invited to submit (modest) proposal (Sept 2014) To be reviewed at PPRP (Oct 29) LCUK 45

46 STFC Programmatic Review positive words on UK participation in Japan Higgs Factory LCUK submitted SoI to STFC - reviewed favourably by Science Board (July 2014) LCUK invited to submit (modest) proposal (Sept 2014) To be reviewed at PPRP (Oct 29) EJADE approved by EU H2020 JAI, CERN, DESY, LAL w. KEK LCUK 46

47 47 The Future?

48 Opportunity for JAI Lead player in coordinated European team to provide: Beam Delivery System Machine-Detector Interface Great synergy with VXD, tracker, forward systems 48


Download ppt "ILC Project status Philip Burrows John Adams Institute Oxford University 1."

Similar presentations


Ads by Google