Facts and Tasks at Fukushima Daiichi August 2012 Skilled Veterans Corps for Fukushima.

Similar presentations


Presentation on theme: "Facts and Tasks at Fukushima Daiichi August 2012 Skilled Veterans Corps for Fukushima."— Presentation transcript:

1 Facts and Tasks at Fukushima Daiichi August 2012 Skilled Veterans Corps for Fukushima

2 1 Building of Unit 4 at Fukushima Daiichi Building of Unit 4 at Fukushima Daiichi Quote TEPCO Facts at Fukushima Daiichi Facts at Fukushima Daiichi UNIT 4

3 Quote TEPCO Facts at Fukushima Daiichi Facts at Fukushima Daiichi Building of Unit 3 at Fukushima Daiichi Building of Unit 3 at Fukushima Daiichi 2 UNIT 3

4 Quote TEPCO Facts at Fukushima Daiichi Facts at Fukushima Daiichi Temporary Seawall at Fukushima Daiichi Temporary Seawall at Fukushima Daiichi 3

5 Facts at Fukushima Daiichi Facts at Fukushima Daiichi Hoses for Contaminated Cooling Water Quote TEPCO 4

6 Facts at Fukushima Daiichi Facts at Fukushima Daiichi Route of Cooling Water Hoses and Leakages Route of Cooling Water Hoses and Leakages Quote TEPCO 5

7 Fuel Debris Quote TEPCO Facts at Fukushima Daiichi Facts at Fukushima Daiichi Present Status of Fuel Debris (Estimated) Present Status of Fuel Debris (Estimated) 6 Quote EPRI

8 Spent Fuel Removal Quote TEPCO Tasks at Fukushima Daiichi Tasks at Fukushima Daiichi 7

9 Steps for Fuel Debris Removal Steps for Fuel Debris Removal Repair of PCV (lower) Fuel Debris Removal 9 Quote TEPCO Tasks at Fukushima Daiichi Tasks at Fukushima Daiichi 8

10 TMI-2 Cleanup Experience TMI-2 Cleanup Experience 11 20192020 2021 Quote TEPCO 1984-1989 Fuel Removal Quote EPRI 9 Annual Doses at TMI-2 and TEPCO’s Estimation of Man Power Requirement

11 Appeal of SVCF Appeal of SVCF Statement SVCF requests: SVCF requests: Skilled Veterans be allowed to work at Fukushima Daiichi to reduce doses for Younger Workers 10

12 Appeal of SVCF Appeal of SVCF Progress 11 March 11, 2011Earthquake and Tsunami April 10, 2011First Appeal was delivered May 4, 2011First negotiation with TEPCO May 24, 2011Meeting with Mr. Hosono and TEPCO July 12, 2011SVCF Inspection Team to Fukushima Daiichi August 3, 2011Proposal to Government and to TEPCO

13 Limited Responcibility by TEPCO for Dose Control Barrier for Fukushima Daiichi Barrier for Fukushima Daiichi a a c c 2 nd Sub- Contractors b b d d TEPCO Fukushima Daiichi Prime Contractors Workers Dose Control for Workers within Fukushima Daiichi e e A A Sub- Contractors Dose Control by Employer not to Exceed Limit Value B B C C D D F F 3 rd Sub- Contractor s Dose Control by Each Worker 400 Contractors Workers E E 12

14 Proposal For National Project Proposal For National Project Necessity of National Project 1. Independent from TEPCO 2. Employ worldwide expertise 3. Integrated Project management 4. International inspection team 13 Fukushima Daiichi TEPCO National Project Even TEPCO is owned by the government it is still profit oriented private company, as the same case as GM

15 Proposal For National Project Proposal For National Project Necessity of National Project 1.Project Team shall be independent from TEPCO There are so many issues are not known at Fukushima Daiichi, that a profit oriented company never has capabilities to deal with such a project Presently the project cannot be open and clear due to TEPCO’s own interest 14

16 Proposal For National Project Proposal For National Project Concentrate Capabilities Worldwidely 18 2.The Project Team shall employ capabilities, knowledge, experiences from all over the world Fukushima Daiichi is more complex than Chernobyl, and larger in size than TMI-2 The project cannot be handled only by Nuclear Specialists. It’s much complicated Engineering Project The Project members shall be from TEPCO, Hitachi, Toshiba; and also experienced engineers from Chernobyl, TMI-2, as well as Bechtel, Fluor, TEC, JGC, Chiyoda and/or other companies 15

17 Proposal For National Project Proposal For National Project Integration of Operation, Clean-up, and R&D 3.Integrated Project Management, including progress, quality, cost, and radiation exposure control shall be applied Project shall be managed in integrated way and avoid multi-layered contract system Workers shall be employed directly by the Project Team, unless specially required Allocation of workers including SVCF’s members shall be optimized considering dose in relation to age, skill, work place, etc. 17

18 Proposal For National Project Proposal For National Project Integrated Project Management 20 4.Inspection Team consisting of international members shall be formed Independent Inspection Team shall be free to check safety, progress, etc. to minimize risk of accident and minimize the cost and time 17

19 Proposal For National Project Proposal For National Project International Inspection Team SVCF appeals you: to speak up and to ask your Government to request Japan Government that: 18 1.Form a National Project Team for Containment and Cleanup of Fukushima Daiichi, which is independent from TEPCO 2.Utilize all of the assets in the world 3.Integrated Project Management shall be the key replacing traditional multi-layered sub-contract structure 4.International Inspection Team be established