Hydropower ‘Good Practice Guide’ Supplement to EA Hydropower manual Dr John Aldrick HO Water Resources Regulation manager
2
PRESENTATION CAVEATS The slides showing hydrographs and flow duration curves were prepared to illustrate the impact a hydropower scheme may have on flows in the depleted reach. A range of different river types were used, as indicated in the title of each slide. The hydrograph shows the gauged flow, without hydropower, the flow in the depleted reach with abstraction for hydropower, and the flow for hydropower (and other amenity purposes in the hydropower leat etc).The percentile flow values (Q50,Q95 values) used are for illustrative/investigation purposes. This work has shown that there are further principles that can be drawn out and developed regarding the setting of hydropower abstraction/flows in the depleted reach. These will be developed further as part of the 'Good Practice Guidance'.
3
Environment Agency Policy on Hydropower The Agency strongly supports the Government’s targets for the use of renewable energy. (10% - 2010, 20% - 2020) BUT The Agency recognises both potential benefits & environmental impacts of small-scale hydropower The Agency seeks to work constructively with the hydropower industry to balance the benefits/impacts of hydropower
4
“We’re only borrowing the water, so what’s the big deal”
5
Agency regulatory regime Strong legislative and environmental constraints which guide us Range of matters to take into account e.g. water resources, fisheries, flood risk, water quality, navigation, Water Resources permit Abstraction Licence/Impoundment licence/sec 158 agreement Hydropower proposals test the Water Resources mandate to balance the needs of the developer and the environment
6
Abstraction Licence Quantity that can be abstracted Max. Instantaneous, hourly, daily, annual Residual flows in deprived reach measurement/control of abstraction & flows Operating/control agreement Time limited licence (normally 12 years to CAMS Common End Date) Fish Screening requirements Fish Pass requirements Derogation agreement ?- (quirk of legislation?) Allows some further upstream abstraction No abstraction charge if < 5Mw
7
Hydropower issues Location environmental sensitivity Volume/timing local impact Residual flows deprived reaches flow measurement Fisheries turbines screens fish-passes
8
Good Practice Guide Appendix to Agency Hydropower Manual To provide starting point for evaluating schemes Checklist for criteria that may require EIA work Principles for setting Residual flow Flow measurement Screen/turbine relationship Principles of screen design
9
Hydropower Good Practice Guide Being developed by EA/Hydropower Working Group Aims to : provide Agency/developers with a consistent approach, common language and practical advice clarify the Agency position and promote awareness But it won’t : answer all your Hydropower development issues Agency Hydropower Manual(2003) available on website
10
Environmental site list audit Red boxes need further work Notes provide further guidance Water Resources Conservation Chemical/physical water quality Biological Water quality Fisheries Flood Defence tick box A Water Resources Checklist Note No. YESNO Is the scheme non-consumptive i.e. will 100% of any water abstracted be returned to the water course from which it was taken? 1 Is the scheme being built on existing infrastructure?2 Will the turbine be placed directly within the weir / water course rather than in a separate channel? 3 Is there a flow-depleted channel?4 Is there a flow-depleted weir?4 Is it intended to increase the height of the impoundment?8 Do surveys reveal any existing abstractions, including unlicensed ones, which will be derogated by the proposal? (1) 5 Is there an EA gauging station in the depleted reach or nearby that is likely to be affected by the scheme? 5 Will the developer accept a derogation consent within the proposed licence?7 Checklist indicates factors that need to be considered
11
Deprived reach Flow Flow to be left in deprived reach between intake and discharge - (how much?) To meet fisheries, ecological, amenity, riparian, navigation needs Dependant on environmental sensitivity May depend on the length of the deprived reach May vary with flow or season (eg migratory fish) Flow measurement or control Decisions impact on economics/viability of scheme
12
Hydropower Large river Q50-Q95 Q50/Q95 2.01
13
Hydropower Large river Q50-Q100 Q50/Q95 2.01 141% more hydropower
14
Hydropower Spaty river Q50-Q95 Q50/Q95 6.86 116% more hydropower if Q100
15
Hydropower Large Chalk river Q50-Q95 Q50/Q95 1.75
16
Hydropower Large Chalk river Q50-Q100 Q50/Q95 1.75 152% more hydropower
17
Hydropower 50-50 flow split 2/3rds of power
18
Deprived reach Flow – principles? Q90-95 default Hands Off Flow Q30/50 – HOF potentially available for hydropower Length of deprived reach 50/50 flow split? Limited impact on flow variability 2/3rds of hydropower Q50/Q95 < 3 (high baseflow) may have economic advantage of using Q100 if very short deprived reach
19
Fisheries Turbines screens Migration spawning Habitats Directive
20
Turbines, screens, conservation Conservation issues (HD, SSSI etc) impact on overall scheme Fish friendliness of turbines Screen specification
21
Fish friendly turbines? Crossflow Francis Kaplan Archimedean screw Waterwheel
22
Fish screens Mostly physical wedge wire, mesh,bar Fish screens are expensive Recent R&D Mesh size flow velocities
23
Fish Screen - principles Inlet velocity – ideally 0.25-0.3m/sec (at an angle to the flow) – leading to a By-wash – to enable fish to escape Mesh size/turbine type Tail race screens on salmonid rivers 1 3 6mm 16 25 50 Crossflow Kaplan/ Screw/ Francis Waterwheel 10/ 12.5
24
Fish migration Fish passes may involve retro-fit also likely to be costly New weirs Salmonid rivers first
25
Applicants should expect the Agency to: Provide clear guidance on the licensing process Highlight key issues for environmental assessment Have an understanding of hydropower Provide information it has available Be consistent Provide timely responses, with explanations
26
Applicants should not expect the Agency to: collect and analyse supporting data carry out the environmental assessment accept inadequate data or assessments give a binding view based on incomplete information design the scheme contravene its statutory duties
27
The Agency expects the applicants to: to know their site, its environment and their objectives for the scheme (background) consider and design their proposals carefully consider options/alternatives make early contact with the Agency and continue such throughout the process appreciate the legislative and other constraints provide quality, focused environmental assessments provide appropriately detailed plans and drawings to support any applications
28
Conclusions Good Practice Guidance has not had final sign-off Will not answer all questions Provides ‘starting point’ for decision making Requires trialling/evaluation The Agency will move to National Permitting in 2008