Download presentation
Presentation is loading. Please wait.
Published bySandra Rodgers Modified over 9 years ago
1
“To Colo or not to Colo” Choosing the Right Solution a Critical Facilities Round Table presentation October 17, 2014 1
2
Agenda Introductions General Considerations Mechanical Electrical Telecom Question and Answer 2
3
Introductions Gyzen & Associates – Critical Facilities Consultants Jeffrey Gyzen Edmund Elizalde Jack Hunt J & M Consultants, Inc. – Telecommunications Consultants Jonathan Jew 3
4
General Considerations Three options to consider: 1.Build 2.Colo 3.The Cloud 4
5
General Considerations What is the definition of Build? Build it yourself using either a Design-Bid-Build or Design-Build approach. What is the definition of Colo? Leasing a physical facility from a Colocation Provider. What is the definition of The Cloud? Leasing a virtual facility from a Cloud Provider. 5
6
General Considerations To Colo or Not to Colo? 6
7
General Considerations To Colo or Build? 7
8
Pros and Cons of Building Pros Autonomy or Self-Control Valuable Asset Location and Access Lower Initial Operational Expenditure (OPEX) Cons Capital Expenditure (CAPEX) 8
9
Pros and Cons of Colocating Pros Potential for Reduced Costs / Lower CAPEX Scalability No Facility Operation and Maintenance Potential for Higher Component Reliability and Availability Potential for Increased Bandwidth Cons Higher Operational Expenditure (OPEX) Less Autonomy No Asset 9
10
Colocation Considerations Location and Accessibility Existing Facilities Tier Level (Tier 1 – 4) Redundancy (N, N+1, 2N) Availability (99.999% = 5 minutes downtime/year) Fault Tolerance (Ability to operate in the event of a component failure) Maintenance (regular and preventative) Disaster Recovery Plan Operating History PUE / Cost of Power Scalability Communications Backbone Multiple ISPs / Carrier Neutral Reliability and Bandwidth 10
11
Colocation Considerations Services and Offerings vs Needs Service Level Agreement (SLA) Technical Support Hosted Services Cloud Computing Competitively Priced IT Staff and Services On-site, 24/7 Technical Staff Continuing Education and Training Security On-site, 24/7 Security Staff Systems Procedures Employees or Outside Service Financial Strength 11
12
Colocation Considerations Everyone’s Needs are Different Prioritize Needs Make the Most Cost Effective Choice 12
13
CFRT Colocation Site Assessments Jeffrey Gyzen, Principal GYZEN & ASSOCIATES Critical Facilities Consultants One Park Plaza, Suite 600 | Irvine, CA 92614 (949) 252-8178 | Mobile (714) 404-8168 jeff.gyzen@gyzen.com 13
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.