Downtown PRESENTATION Tuesday, May 3, 2011 R/C Theaters Movies 14
2
District C Investments [2004-Present] Paved 10.3 miles over 37 Streets $3.2 million Total Sewer Repair=$180,000 280 Catch Basins repaired/replaced $610,000 Traffic Signal/Intersection Upgrades=$500,000 New Streetlights=$7.1 million 4 Streetscape Phases=$8.5 million Total Investment= $13 million
3
2011 Infrastructure Projects District C 2011 Paving Projects: N Main [Public Square to North Street] Northampton Street [From Main to River] Northampton Street [From Park Ave. to W-B Blvd.] Coal Street Park EDI Project- Phase I & II Splash Pad, Pavilion, New Basketball Courts, New Playground, sidewalk improvements, Multi-purpose field resurfaced $1 million dollar project Coal Street Realignment Project $12.7 million Completed 2012
4
Coal Street Realignment Over the next few weeks storm drainage installation work will continue on both Coal St. and Wilkes-Barre Blvd. Installation of new sanitary lines on the lower section will also begin. Partial demolition of two Sherman Terrace properties acquired by the city will begin in about a month. General road construction and widening will progress throughout the summer.
5
Coal Street Realignment
6
Downtown Past Present
7
Streetscape PastPresent
8
Lighting Downtown PastPresent
9
Intermodal Center PastPresent
10
Intermodal Center
11
Labor and Industry Building
12
Northampton Street PastPresent
13
South Main Street PastPresent
14
River Common
15
Downtown Prior to 2004 Businesses shuttering doors Vacancy on the rise Tax appeals depleting the general fund Crime Cleanliness Deserted after 5 p.m.
16
Downtown Today 53 new businesses 15,000 workers 4 th largest DT workforce in PA $700,000 in new tax revenue 18-hour destination Safe to walk downtown again DT is clean
17
City Wide Investments 2004-Present Paved 39 miles over 162 Streets $12 million Bridge Repairs- 5 completed $10.4 million Catch Basins- 1,317= $2,628,000 Sewer Repair- $2.5 million Creek wall maintenance- $3.8 million 4 Streetscape Phases- $8.5 million 3 new playgrounds- $600,000 Golf course/athletic fields- $1.1 million Neighborhood Infrastructure Investments= $47.5 million
18
Public Safety Police Department 29 new police officers on the street 250 camera citywide surveillance system Reinstated K-9 and S.W.A.T. unit Replaced bullet-proof vests for entire dept. twice Purchased tasers and related equipment Purchased new police radio antenna Records Management system 18 new vehicles to the fleet
19
Public Safety Fire Department Invested over $3 million in WBFD Purchased: 1 ladder truck- 3 Fire Engines 3 Ambulances Asst. Chief’s Vehicle 85 sets of Bunker Gear 70 Helmets Built Hollenback Fire Station Response Time= 3:27 [below national average]
20
Demolitions Demolished 125 abandoned and blighted properties citywide
21
Rental Property Regulations Rental inspections valid for 2 years Re-inspection mandated if tenants change Property owners outside of 15 miles must have local property manager Required Real Estate license “3-Strikes” Ordinance Authorizes city to immediately close nuisance properties 3 disruptive conduct reports from police and/or serious health or code violations
22
Rental Inspections MonthRental Insp.Re-Insp.Complaints September942225 October1552722 November1481921 December377177 January1212213 February1041921 March2782710 Total1277153119
23
Health Department Statistics
25
Courtright Housing Development PastPresent
26
Courtright Housing Development
28
Coal Street Park PastPresent
29
Coal Street Park PastPresent
30
Coal Street Playground
31
Pine Ridge PastPresent
32
Mill Street Homes PastPresent
39
Elevations Ribbon-Cutting
41
Iron Triangle- 10/7/2010