1 © 2012 Schneider Electric All Rights Reserved – IT Business – Symmetra MW – July 2012 Cooling Kick-Start Activity Over the past two weeks we have looked.

Similar presentations


Presentation on theme: "1 © 2012 Schneider Electric All Rights Reserved – IT Business – Symmetra MW – July 2012 Cooling Kick-Start Activity Over the past two weeks we have looked."— Presentation transcript:

1 1 © 2012 Schneider Electric All Rights Reserved – IT Business – Symmetra MW – July 2012 Cooling Kick-Start Activity Over the past two weeks we have looked at a great deal of information relating to cooling. Please take a minute to post in WebEx chat, one new thing that you have learned about cooling since starting this training course? Please be sure to post your comment to all panelists so that we can share and discuss.

2 © 2012 Schneider Electric All Rights Reserved – IT Business – InfraStruxure Designer – December 2012 InfraStruxure Designer Week 5 / Module 4: Additional InfraStruxure Designer Configurators

3 3 © 2012 Schneider Electric All Rights Reserved – IT Business – Symmetra MW – July 2012 Week Four Activity Review (1 of 3) Poll Question: Rate the difficulty of the Week Four Activity. ●Easy > I can handle something more challenging ●Straightforward > This was a good introductory exercise ●Tricky> Navigation was slightly difficult but I’m comfortable with the tool now ●Very Difficult> I could use more guided practice

4 4 © 2012 Schneider Electric All Rights Reserved – IT Business – Symmetra MW – July 2012 Week Four Activity Review (2 of 3)

5 5 © 2012 Schneider Electric All Rights Reserved – IT Business – Symmetra MW – July 2012 Week Four Activity Review (3 of 3)

6 6 © 2012 Schneider Electric All Rights Reserved – IT Business – Symmetra MW – July 2012 Week Four Video Review: In Week Four participants viewed three videos entitled: Configuring Security and Environmental Properties Configuring Management Properties Configuring Services

7 7 © 2012 Schneider Electric All Rights Reserved – IT Business – Symmetra MW – July 2012 Objectives Upon completion of this lesson, you will be able to Configure: ● Symmetra PX 250/500 ● Power Generation ● Galaxy ● Galaxy Management

8 8 © 2012 Schneider Electric All Rights Reserved – IT Business – Symmetra MW – July 2012 Intro Questions, Concerns, and or Comments Does anyone have any questions, concerns, and or comments that we can address at this time?

9 9 © 2012 Schneider Electric All Rights Reserved – IT Business – Symmetra MW – July 2012 Polling Question Which of the following have you sold? ●Symmetra PX 250/500 ●Galaxy UPS ●Both ●Neither

10 10 © 2012 Schneider Electric All Rights Reserved – IT Business – Symmetra MW – July 2012 Configuring Large 3 Phase UPS and Distribution ●Access to some of the large UPS and 3 Phase are based upon partner level and status with SE. ●Contact your local APC representative or the configuration team if you do not have those options for getting access.

11 11 © 2012 Schneider Electric All Rights Reserved – IT Business – Symmetra MW – July 2012 Configuring a Symmetra PX 250/500 You will configure the Symmetra PX 250/500 using both the Power Zone and the Symmetra PX 250/500.

12 12 © 2012 Schneider Electric All Rights Reserved – IT Business – Symmetra MW – July 2012 Symmetra PX 250/500: Components A Symmetra PX 250/500 configuration includes these components: ●Minimum Configuration ●Maintenance Bypass with Distribution (MBwD) ●UPS I/O Base Frame ●UPS PM Frame (holds the Power Modules) ●Battery Frame ●Optional Configuration

13 13 © 2012 Schneider Electric All Rights Reserved – IT Business – Symmetra MW – July 2012 Positioning the Symmetra PX 250/500 Power Group in the Floor Editor After configuring the Symmetra, select OK on any of the PX 250/500 pages. Drag the PX 250/500 power group icon from the Unplaced Equipment field to the desired position in the Floor Editor layout.

14 14 © 2012 Schneider Electric All Rights Reserved – IT Business – Symmetra MW – July 2012 Additional ISX Designer Configurators This module describes the following Power configurators: Power Generation NAM Galaxy Configurators EMEA Galaxy Configurators Galaxy Management

15 15 © 2012 Schneider Electric All Rights Reserved – IT Business – Symmetra MW – July 2012 Power Generation External generator, Automatic Transfer Switch (ATS) and associated breakers provide power to one or more power zones.

16 16 © 2012 Schneider Electric All Rights Reserved – IT Business – Symmetra MW – July 2012 NAM Version – Galaxy Configurator: PDU Connection Tab Galaxy configurator is used to add and configure Galaxy PW and Galaxy 3500 products.

17 17 © 2012 Schneider Electric All Rights Reserved – IT Business – Symmetra MW – July 2012 NAM Version – Galaxy Configurator: UPS Tab Galaxy configurator is used to add and configure Galaxy PW and Galaxy 3500 products.

18 18 © 2012 Schneider Electric All Rights Reserved – IT Business – Symmetra MW – July 2012 NAM Version – Galaxy Configurator: Customer Battery Configuration Galaxy configurator is used to add and configure Galaxy PW and Galaxy 3500 products.

19 19 © 2012 Schneider Electric All Rights Reserved – IT Business – Symmetra MW – July 2012 NAM Version – Galaxy Configurator: Options Tab Galaxy configurator is used to add and configure Galaxy PW and Galaxy 3500 products.

20 20 © 2012 Schneider Electric All Rights Reserved – IT Business – Symmetra MW – July 2012 NAM Version – Galaxy II Configurator: Glaxy II Main Galaxy II configurator is used to add and configure the Galaxy 5000.

21 21 © 2012 Schneider Electric All Rights Reserved – IT Business – Symmetra MW – July 2012 NAM Version – Galaxy II Configurator: Glaxy II Main Continued Galaxy II configurator is used to add and configure the Galaxy 5000.

22 22 © 2012 Schneider Electric All Rights Reserved – IT Business – Symmetra MW – July 2012 NAM Version – Galaxy II Configurator: PDU Connection Select PDU Connection on the main Galaxy II page.

23 23 © 2012 Schneider Electric All Rights Reserved – IT Business – Symmetra MW – July 2012 NAM Version – Galaxy II Configurator: Customer Battery Configuration Options Tab Select Custom Configuration in the Battery section of the main Galaxy II page.

24 24 © 2012 Schneider Electric All Rights Reserved – IT Business – Symmetra MW – July 2012 NAM Version – Galaxy II Configurator: Customer Battery Configuration Advanced Tab

25 25 © 2012 Schneider Electric All Rights Reserved – IT Business – Symmetra MW – July 2012 NAM Version – Galaxy II Configurator: Accessories Power System Tab Select Advanced in the Accessories section of the main Galaxy II page.

26 26 © 2012 Schneider Electric All Rights Reserved – IT Business – Symmetra MW – July 2012 NAM Version – Galaxy II Configurator: Accessories Distribution Tab Select Advanced in the Accessories section of the main Galaxy II page.

27 27 © 2012 Schneider Electric All Rights Reserved – IT Business – Symmetra MW – July 2012 NAM Version – Galaxy II Configurator: Accessories Integrated Parts Tab Select Advanced in the Accessories section of the main Galaxy II page.

28 28 © 2012 Schneider Electric All Rights Reserved – IT Business – Symmetra MW – July 2012 NAM Version – Galaxy II Configurator: Accessories Bypass Tab Select Advanced in the Accessories section of the main Galaxy II page.

29 29 © 2012 Schneider Electric All Rights Reserved – IT Business – Symmetra MW – July 2012 NAM Version – Galaxy II Configurator: Accessories Auxiliary Tab Select Advanced in the Accessories section of the main Galaxy II page.

30 30 © 2012 Schneider Electric All Rights Reserved – IT Business – Symmetra MW – July 2012 NAM Version – Galaxy II Configurator: Advanced Communications Select Advanced in the Communications section of the main Galaxy II page.

31 31 © 2012 Schneider Electric All Rights Reserved – IT Business – Symmetra MW – July 2012 NAM Version – Galaxy Distribution: The Configurator is used to add and configure power distribution products.

32 32 © 2012 Schneider Electric All Rights Reserved – IT Business – Symmetra MW – July 2012 NAM Version – Galaxy Distribution: Advanced Panel Board Configuration Select Advanced in the Panel Board section of the main Galaxy Distribution page.

33 33 © 2012 Schneider Electric All Rights Reserved – IT Business – Symmetra MW – July 2012 NAM Version – Galaxy Distribution: Advanced Options Select Advanced in the Options section of the main Galaxy Distribution page.

34 34 © 2012 Schneider Electric All Rights Reserved – IT Business – Symmetra MW – July 2012 EMEA Version – Galaxy Configurator: PDU Connection Tab Becomes available if PDU(s) has previously been selected in the Power Zone configurator.

35 35 © 2012 Schneider Electric All Rights Reserved – IT Business – Symmetra MW – July 2012 EMEA Version – Galaxy Configurator: UPS Tab

36 36 © 2012 Schneider Electric All Rights Reserved – IT Business – Symmetra MW – July 2012 Week Five Assignments This week you will,… Review the following videos: Configuring Symmetra PX 250/500 Configuring Galaxy UPS Configuring Galaxy PDU & Batteries Configuring Galaxy distribution Configuring Galaxy Adv. Mgmt. Saving a Final Solution Complete the Week Five Activity Activity One Activity Two

37 37 © 2012 Schneider Electric All Rights Reserved – IT Business – Symmetra MW – July 2012 Other Week Five Sessions You will also,… ●Attend office hours (if needed)Attend office hours (if needed) ●Participate in the Twitter discussionParticipate in the Twitter discussion

38 38 © 2012 Schneider Electric All Rights Reserved – IT Business – Symmetra MW – July 2012 Week Five Overview Document Week Five Overview

39 39 © 2012 Schneider Electric All Rights Reserved – IT Business – Symmetra MW – July 2012 Concluding Questions, Concerns, and or Comments Does anyone have any questions, concerns, and or comments that we can address at this time?